|
US$319.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. JG/T 369-2012: Retard-bonded prestressing steel strand Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| JG/T 369-2012 | English | 319 |
Add to Cart
|
3 days [Need to translate]
|
Retard-bonded prestressing steel strand
| Valid |
JG/T 369-2012
|
PDF similar to JG/T 369-2012
Basic data | Standard ID | JG/T 369-2012 (JG/T369-2012) | | Description (Translated English) | Retard-bonded prestressing steel strand | | Sector / Industry | Building & Construction Industry Standard (Recommended) | | Classification of Chinese Standard | P26 | | Classification of International Standard | 91.080.10 | | Word Count Estimation | 12,149 | | Quoted Standard | GB/T 1040.1; GB/T 5224; GB/T 9341; GB/T 11116; JG/T 370; GB/T 1040.2; GB/T 1040.3; GB/T 1040.4; GB/T 1040.5 | | Regulation (derived from) | Bulletin of the Ministry of Housing and Urban 1332; industry standard filing Notice 2013 No. 1 (No. 157 overall) | | Issuing agency(ies) | Ministry of Housing and Urban-Rural Development of the People's Republic of China | | Summary | This standard specifies the slow prestressed steel strand terms and definitions, classification and marking, symbols, general requirements, requirements, test methods, inspection rules, marking, packaging, transport and storage. This standard applies to p |
JG/T 369-2012: Retard-bonded prestressing steel strand---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Retard-bonded prestressing steel strand
ICS 91.080.10
P26
People's Republic of China building industry standards
Slow bonding prestressed strand
Posted.2012-03-15
2012-08-01 implementation
Ministry of Housing and Urban-Rural Development, People's Republic of China released
Foreword
This standard is drafted according to the rules given in GB/T 1.1-2009.
This standard proposed by the Ministry of Housing and Urban Standard and Design Institute.
This standard by the Ministry of Housing and Urban Construction Building Products and Components Products Standardization Technical Committee.
This standard is drafted by. China Jing Ye Engineering Co., Ltd.
Participated in the drafting of this standard. China Metallurgical Construction Research Institute Co., Ltd., China Academy of Building Research, Jiangyin Huaxin Steel Cable Co., Ltd.,
China Architectural Design and Research Institute of Asahi Architectural Design Co., Ltd., Shanghai Institute of Building Research, Lanzhou Jiaotong University, Tianjin Building Department
Institute of Science and Technology, Beijing Limaiwei Real Estate Development Co., Ltd. technology.
The main drafters of this standard. Wu transfer piano, Shang Renjie, Wang Yuewen, Fan Yun Yun, Li Qian, Li Dongbin, Chen Huaqing, Jia Weiping, Xin Ding Kang,
Wang Qicai, Li Xin, Zhu Long, Liu Wenhua, Liu Lanzhen, Zhang Huisheng.
Slow bonding prestressed strand
1 Scope
This standard specifies the terms and definitions retarding prestressed strand, classification and marking, symbols, general requirements, requirements, test methods, seized
Rules, marking, packaging, transportation and storage.
This standard applies to post-tensioned prestressed concrete structures with ribbed slow-bonding prestressed strand and prestressed ribbed with non-stick
Knot prestressed strand.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 1040 (all parts) Determination of plastic tensile properties
GB/T 5224 strand for prestressed concrete
GB/T 9341 plastic bending test method
GB/T 11116 high-density polyethylene resin
JG/T 370 slow bonding prestressed strand binder
3 Terms and definitions
JG/T 370 and the following terms and definitions apply to this document.
3.1
Prestressed steel strands coated with a slow bonding adhesive and a high density polyethylene sheath.
3.2
Sheathing sheathing
Casing wrapped in prestressed strand and retarding adhesive.
3.3
Transverse rib transeverserib
Slowly bonded prestressed strand sheath with strand perpendicular to the axis of the rib.
4 classification and marking
4.1 classification and code
Slow-bonded prestressed steel strands according to the surface of the sheath There are no transverse ribs are divided into.
a) ribbed slow bonding prestressed strand, code-named. RPSR;
b) Non-ribbed bonded prestressed strand, code-named. RPSP.
4.2 mark method
Slow-bonded prestressed strand markings by the classification code, technical characteristics (standard tensile fit, the standard curing time, Strand Straight
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JG/T 369-2012_English be delivered?Answer: Upon your order, we will start to translate JG/T 369-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of JG/T 369-2012_English with my colleagues?Answer: Yes. The purchased PDF of JG/T 369-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|