|
US$509.00 ยท In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. JG/T 352-2017: Pore-forming mould for concrete structure Status: Valid JG/T 352: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| JG/T 352-2017 | English | 509 |
Add to Cart
|
4 days [Need to translate]
|
Pore-forming mould for concrete structure
| Valid |
JG/T 352-2017
|
| JG/T 352-2012 | English | 959 |
Add to Cart
|
5 days [Need to translate]
|
Pore-forming mould for cast-in-situ concrete hollow structure
| Obsolete |
JG/T 352-2012
|
PDF similar to JG/T 352-2017
Basic data | Standard ID | JG/T 352-2017 (JG/T352-2017) | | Description (Translated English) | Pore-forming mould for concrete structure | | Sector / Industry | Building & Construction Industry Standard (Recommended) | | Classification of Chinese Standard | Q14 | | Classification of International Standard | 91.100.30 | | Word Count Estimation | 22,296 | | Date of Issue | 2017-07-10 | | Date of Implementation | 2018-01-01 | | Older Standard (superseded by this standard) | JG/T 352-2012 | | Quoted Standard | GB 175; GB 1499; GB/T 1596-2005; GB 6566; GB 8076; GB 8624-2012; GB 1499.1; GB 13788; GB/T 14684; GB/T 14685; GB 20472; GB 50010; GB 50016; HJ/T 231; JC 933; JC/T 841; JC/T 540 | | Issuing agency(ies) | Ministry of Housing and Urban-Rural Development of the People's Republic of China | | Summary | This standard specifies the terms and definitions, classification and marking of general structure, requirements, test methods, inspection rules, certificates, transportation and storage of concrete structures into core molds (hereinafter referred to as core molds). This standard applies to hollow hole in the cast or prefabricated concrete structure into the core mold. |
JG/T 352-2017: Pore-forming mould for concrete structure---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Pore-forming mould for concrete structure
ICS 91.100.30
Q14
People's Republic of China Construction Industry Industry Standard
Replacing JG/T 352-2012
Hole forming mandrel for concrete structure
Published on.2017-07-10
2018-01-01 Implementation
The People's Republic of China Ministry of Housing and Urban-Rural Development issued
Directory
Preface I
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Classifications and Markings 2
5 General requirements 4
6 Request 4
7 Test method 7
8 Inspection Rules 10
9 Certificates, Transport and Storage 11
Appendix A (Informative Appendix) Hole Forming Die Model 13
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard is proposed by the Institute of Standardization of Housing and Urban-Rural Development Standards.
This standard is under the jurisdiction of the Technical Committee of Building Structure Standardization of the Ministry of Housing and Urban-Rural Development.
This standard is drafted by. Changsha Superstar Light Building Material Co., Ltd.
Participated in the drafting of this standard. Hunan Huating Zhubang Residential Industry Co., Ltd., Central South University, Hunan Provincial Construction Engineering Group, and Hunan Provincial Architectural Design
Institute of Science and Technology, Ministry of Public Security Sichuan Fire Research Institute, Xiangtan Planning and Design Institute, Changsha City Architectural Design Institute Co., Ltd.
The main drafters of this standard. Qiu Zeyou, Hu Ping, Zhang Xiang, Yang Hao, Ou Shijun, Jiang Lizhong, Zhang Ming, Liu Liangbo, Chen Zhiguo, Huang Chuncheng, Li Ping,
Yu Yinhua, Yuan Honghua, Xie Dajiang, Xiang Xianglin, Yang Wenhuang.
The previous versions of the standard replaced by this standard are.
---JG/T 352-2012.
Hole forming mandrel for concrete structure
1 Scope
This standard specifies the terminology and definition, classification and marking, general requirements, and requirements for the manhole mold for concrete structures (hereinafter referred to as core mandrel).
Requirements, test methods, inspection rules, certificates, transportation and storage.
This standard applies to the hollow hole casting cast-in-place or precast concrete structure hole mandrel.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB 175 General Purpose Portland Cement
GB 1499 Hot-rolled ribbed reinforcement for reinforced concrete
GB/T 1596-2005 Fly ash used in cement and concrete
GB 6566 Construction Materials Radionuclide Limits
GB 8076 concrete admixture
GB 8624-2012 Classification of combustion performance of building materials and products
GB 1499.1 Steel for reinforced concrete - Part 1. Hot rolled circular steel
GB 13788 cold-rolled ribbed steel bar
GB/T 14684 Sand for building
GB/T 14685 Pebbles and gravel for construction
GB 20472 sulphoaluminate cement
GB 50010 Design Specification for Concrete Structures (2015 Edition)
GB 50016 Code for Design of Building Fire Protection
HJ/T 231 Environmental Labeling Products Technical Requirements Recycled Plastic Products
JC933 fast hard sulphoaluminate cement
JC/T 841 alkali-resistant glass fiber mesh
JC/T 540 Cold drawn low carbon steel wire for concrete products
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Non-pulling core-forming process is used to make the concrete structure hollow inside or outside the core.
3.2
Built-in core mold internalpore-formingmould
Embedded in the concrete structure, the surface of the hole is not exposed hole mandrel.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JG/T 352-2017_English be delivered?Answer: Upon your order, we will start to translate JG/T 352-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of JG/T 352-2017_English with my colleagues?Answer: Yes. The purchased PDF of JG/T 352-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version JG/T 352-2017?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version JG/T 352-2017 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|