US$649.00 · In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. HJ 407-2021: Technical specifications for acceptance of environmental protection facilities for completed construction projects - Automotive industry Status: Valid HJ 407: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| HJ 407-2021 | English | 649 |
Add to Cart
|
5 days [Need to translate]
|
Technical specifications for acceptance of environmental protection facilities for completed construction projects - Automotive industry
| Valid |
HJ 407-2021
|
| HJ/T 407-2007 | English | RFQ |
ASK
|
6 days [Need to translate]
|
Technical guidelines for environmental protection in automobile manufacturing capital construction project for check and accept of completed project
| Obsolete |
HJ/T 407-2007
|
PDF similar to HJ 407-2021
Basic data | Standard ID | HJ 407-2021 (HJ407-2021) | | Description (Translated English) | Technical specifications for acceptance of environmental protection facilities for completed construction projects - Automotive industry | | Sector / Industry | Environmental Protection Industry Standard | | Classification of Chinese Standard | Z62 | | Word Count Estimation | 28,256 | | Issuing agency(ies) | Ministry of Ecology and Environment |
HJ 407-2021: Technical specifications for acceptance of environmental protection facilities for completed construction projects - Automotive industry ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Technical Specifications for Acceptance of Environmental Protection Facilities for Completion of Construction Projects Automobile Manufacturing Industry (Release Draft))
National Ecological Environment Standard of the People's Republic of China
Replacing HJ/T 407-2007
Technical Specifications for Acceptance and Acceptance of Environmental Protection Facilities for Completion of Construction Projects
Automotive Manufacturing
Technical specifications for acceptance of environmental protection facilities for
completed construction projects
-- Automotive industry
This electronic version is the official standard text, which is reviewed and typeset by the Environmental Standards Institute of the Ministry of Ecology and Environment.
Published on 2021-11-25
2021-11-25 Implementation
Released by the Ministry of Ecology and Environment
directory
Foreword...ii
1 Scope...1
2 Normative references...1
3 Terms and Definitions...2
4 Acceptance work procedures...2
5 Start acceptance...3
6 Acceptance self-inspection...3
7 Compile the acceptance monitoring plan...4
8 Implement acceptance monitoring and inspection...10
9 Prepare the acceptance monitoring report (table)...11
10 Follow-up acceptance work...12
Appendix A (informative appendix) Acceptance work procedure diagram...13
Appendix B (informative appendix) Acceptance data list...14
Appendix C (informative appendix) Acceptance self-examination content table...15
Appendix D (informative appendix) Contents of the acceptance monitoring plan...18
Appendix E (informative appendix) Recommended monitoring and analysis methods... 21
Appendix F (informative appendix) Recommended method for follow-up acceptance work... 23
Technical specifications for acceptance of environmental protection facilities upon completion of construction projects
1 Scope of application
This standard specifies the working procedures and general requirements for the acceptance of completed environmental protection facilities for automobile manufacturing construction projects.
Technical requirements for acceptance, acceptance self-inspection, preparation of acceptance monitoring plan, implementation of acceptance monitoring and inspection, and preparation of acceptance monitoring report (table).
This standard is applicable to the acceptance work of completed environmental protection facilities in automobile manufacturing construction projects, but not applicable to automobile manufacturing construction projects.
Casting, electroplating production links.
Other contents not stipulated in this standard shall be in accordance with the Pollution Impact Category of the Technical Guidelines for Environmental Protection Acceptance of Construction Projects (Ministry of Ecology and Environment)
Report No. 9 of.2018) Annex implementation.
2 Normative references
This standard refers to the following documents or clauses thereof. For dated references, only the dated version applies to this standard.
For undated references, the latest edition (including all amendments) applies to this standard.
GB 3096 Acoustic Environment Quality Standard
GB 5085.7 General Rules for Identification Standard of Hazardous Waste
GB 8978 Integrated Wastewater Discharge Standard
GB 12348 Industrial Enterprise Boundary Environmental Noise Emission Standard
GB 13271 Boiler Air Pollutant Emission Standard
GB 14554 Emission Standard of Odor Pollutants
GB 16297 Comprehensive Emission Standard of Air Pollutants
GB 18484 Standard for Pollution Control of Hazardous Waste Incineration
GB 18597 Hazardous Waste Storage Pollution Control Standard
GB 18599 General Industrial Solid Waste Storage and Landfill Pollution Control Standard
GB 31572 Emission Standard of Pollutants for Synthetic Resin Industry
GB 34330 General Rules for the Identification Standard of Solid Waste
GB 37822 Volatile organic compound fugitive emission control standard
GB/T 8170 Numerical Rounding Rules and Representation and Judgment of Limit Values
GB/T 14581 Technical Guidelines for Sampling of Water Quality in Lakes and Reservoirs
GB/T 16157 Determination of particulate matter in exhaust gas from stationary pollution sources and sampling methods for gaseous pollutants
HJ/T 52 Technical Guidance for Water Quality River Sampling
HJ/T 55 Technical guidelines for monitoring fugitive emissions of air pollutants
HJ 75 Technical Specification for Continuous Monitoring of Flue Gas (SO2, NOx, Particulate Matter) Emissions from Stationary Pollution Sources
HJ 76 Technical requirements and testing methods for continuous monitoring system for emission of flue gas (SO2, NOx, particulate matter) from stationary sources
HJ/T 91 Technical Specification for Surface Water and Sewage Monitoring
HJ 91.1 Technical Specification for Wastewater Monitoring
HJ/T 92 Technical Specifications for Monitoring Total Discharge of Water Pollutants
HJ 164 Technical Specification for Groundwater Environmental Monitoring
HJ/T 166 Technical Specification for Soil Environment Monitoring
HJ 194 Technical Specification for Manual Monitoring of Ambient Air Quality
HJ 353 Technical Specification for Installation of Water Pollution Source Online Monitoring System (CODCr, NH3-N, etc.)
HJ 354 Technical Specification for Acceptance of On-Line Monitoring System for Water Pollution Sources (CODCr, NH3-N, etc.)
HJ 355 Technical Specifications for Operation of Online Monitoring System for Water Pollution Sources (CODCr, NH3-N, etc.)
HJ 356 Technical Specification for Data Validity Judgment of Water Pollution Source Online Monitoring System (CODCr, NH3-N, etc.)
HJ/T 397 Technical Specification for Stationary Source Waste Gas Monitoring
HJ 493 Technical Regulations for the Preservation and Management of Water Quality Samples
HJ 494 Water Quality Sampling Technical Guide
HJ 495 Technical Regulations for Design of Water Quality Sampling Scheme
HJ 630 Environmental Monitoring Quality Management Technical Guidelines
HJ 640 Environmental Noise Monitoring Technical Specifications Routine Monitoring of Urban Acoustic Environment
HJ 691 Technical Guidelines for Sampling of Semi-volatile Organic Compounds in Ambient Air
HJ 733 Technical Guidelines for the Detection of Volatile Organic Compounds in Leaks and Open Liquid Surface Emissions
HJ 819 General Principles of Technical Guidelines for Self-Monitoring of Pollutants
HJ 905 Technical Specification for Environmental Monitoring of Odor Pollution
HJ 1019 Technical Guidelines for Sampling of Volatile Organic Compounds in Soil and Groundwater
"Announcement on Issuing the Pollution Impact Category of Technical Guidelines for Environmental Protection Acceptance of Completion of Construction Projects" (Announcement of the Ministry of Ecology and Environment
No. 9 of.2018)
Regulations on the Administration of Pollution Discharge Permits (Order No. 736 of the State Council of the People's Republic of China)
3 Terms and Definitions
The following terms and definitions apply to this standard.
3.1
automotive industry
Engaged in automobiles, automobile engines, modified automobiles, low-speed automobiles, trams, automobile bodies and trailers, automobile parts and accessories
and other industrial sectors of production.
3.2
auto parts and accessories manufacturersautomobile parts and accessories manufacturers
Engaged in automotive engine parts, trailer (including semi-trailer) parts, auto parts and accessories (non-metallic materials such as injection molding, foaming, etc.)
metal materials) and other manufacturing enterprises.
3.3
environmental protection facilities
Prevent and control environmental pollution and ecological damage, and carry out installations, equipment and engineering facilities required for environmental monitoring.
4 Acceptance work procedures
The acceptance work includes acceptance self-inspection, acceptance monitoring and subsequent acceptance work. The acceptance monitoring work can be divided into the preparation of acceptance monitoring plans,
There are three stages of implementation of acceptance monitoring and inspection, and preparation of acceptance monitoring report (table). The follow-up acceptance work includes putting forward acceptance opinions, compiling "their
Matters that he needs to explain”, forming and making public acceptance reports, registration on the national construction project completion environmental protection acceptance information platform, and file retention
Wait. See Appendix A for the acceptance work procedure diagram.
5 Start acceptance
5.1 Collect acceptance data
The collected acceptance data includes environmental protection data, engineering data related to environmental protection, and drawing data. For the list of acceptance documents, please refer to the attached
Record B.
5.2 Develop an acceptance work plan
Formulate the acceptance work plan, clarify the acceptance monitoring method of the enterprise's self-test or entrust the technical organization to monitor, and the acceptance work schedule.
6 Acceptance self-check
6.1 Purpose of self-examination
Self-inspection of the implementation of environmental protection procedures, the completion of projects and environmental protection facilities, and the environmental impact report (table) and its
The consistency of the approval decision of the approval department, to determine whether the conditions for the acceptance work as planned; self-inspection of the distribution of pollution sources and pollutant discharge
The situation and the setting of the discharge outlet, etc., are used as the basis for formulating the acceptance monitoring plan.
6.2 Self-inspection content
6.2.1 Implementation of environmental protection procedures
The performance of environmental protection formalities includes the project environmental impact report (form) and its approval by the approval department; if there is a major change, the
The completion of the corresponding approval procedures; the implementation of the project supervision, inspection and rectification requirements by the national and local ecological environment authorities;
Permit application or pollution discharge registration, etc.
6.2.2 Construction of the project
Based on the environmental impact report (table) and the approval decision of the approval department, self-examine the main project, public auxiliary projects and supporting projects.
into the situation. Refer to Table C.1 to Table C.3 in Appendix C for the content of self-inspection.
6.2.3 Completion of environmental protection facilities
6.2.3.1 Pollution control/disposal facilities
Comparing with the environmental impact report (form) and the approval decision of the approval department, self-examination of waste gas, waste water, noise, solid waste pollution control/
The completion of disposal facilities shall be used as the basis for determining the monitoring contents such as monitoring points and factors in the acceptance monitoring plan. See Appendix C for the content of the self-examination
in Table C.4 to Table C.7.
6.2.3.2 Construction of other environmental protection facilities
Comparing with the environmental impact report (form) and the approval decision of the approval department, self-inspect the completion of other required supporting environmental protection facilities,
As the basis for determining the inspection content in the acceptance monitoring plan. See Table C.8 in Appendix C for the content of the self-check.
6.3 Self-examination results
Or the environmental impact report (form) has not been approved, and the environmental impact report (form) and the approval decision of the approval department have not been approved.
Environmental protection facilities, those who should have obtained but have not obtained a pollutant discharge permit or registered pollutant discharge, shall go through relevant procedures or be rectified before continuing to operate.
Exhibition acceptance work.
The self-inspection found that the location of the pollutant discharge outlet or the pollutant discharge method, the discharge destination, the number of pollutant discharge outlets or the type of pollutant discharge.
If the pollutant discharge permit is inconsistent with the pollutant discharge permit, a new pollutant discharge permit shall be applied in accordance with the provisions of the Regulations on the Administration of Pollutant Discharge Permits.
If the discharge outlet does not meet the monitoring conditions, such as the sampling platform and sampling hole setting are not standardized, it should be rectified in time to ensure the quality of the on-site monitoring data.
Quantity and monitoring personnel safety.
7 Prepare the acceptance monitoring plan
7.1 Compilation principle of acceptance monitoring plan
The construction project of automobile manufacturing industry should determine the content of project acceptance monitoring according to the results of the acceptance self-inspection, and formulate the acceptance monitoring plan.
For projects with simple reconstruction and expansion content, the content of the acceptance monitoring plan may be appropriately simplified, but it should include acceptance execution standards, monitoring points, monitoring factors,
Monitoring frequency and other main content.
7.2 Contents and requirements of acceptance monitoring plan
7.2.1 Contents of acceptance monitoring plan
The content of the acceptance monitoring plan generally includes the project overview, acceptance basis, project construction, environmental protection facilities, acceptance implementation standards,
Acceptance monitoring content, quality assurance and quality control, etc. Please refer to Appendix D for the content of the acceptance monitoring plan, and the recommended monitoring and analysis methods for acceptance monitoring.
See Appendix E.
7.2.2 Acceptance Execution Criteria
Acceptance and implementation standards include pollutant discharge standards and ecological environment quality standards.
The relevant requirements of the annex to the Technical Guidelines for Pollution Impacts” shall be implemented.
The emission of air pollutants from construction projects of automobile manufacturing mainly implements GB 16297, and the fugitive emission of volatile organic compounds implements GB 37822.
GB 14554 for odor pollutant discharge, GB 13271 for supporting power boilers (non-thermal power generating units), hazardous waste incinerators
GB 18484 is implemented for tail gas; GB 8978 is mainly implemented for water pollutant discharge; GB 12348 is implemented for environmental noise at the factory boundary;
Utilization and disposal are applicable to GB 5085.7, GB 34330, GB 18597, GB 18599, etc.; the discharge of pollutants from synthetic resin production facilities is subject to GB
31572.Environmental impact report (form) and the approval decision of the approval department, the standard or limit required for the emission permit or emission registration
If it is stricter than the above-mentioned standards, its provisions shall prevail.
The environmental quality assessment surrounding the construction projects of the automobile manufacturing industry shall implement the currently valid ecological environment quality standards.
The treatment efficiency of environmental protection facilities shall be implemented in accordance with the relevant standards and the approval decision of the environmental impact report (form) approval department.
7.2.3 Contents of acceptance monitoring
7.2.3.1 Effect monitoring of commissioning and operation of environmental protection facilities
a) Pollutant emission monitoring
1) Monitoring of organized waste gas emissions, and monitoring of unorganized waste gas emissions at the factory boundary and in the factory area.
2) Pollutant discharge monitoring of workshop or production facility waste water discharge outlets, total waste water discharge outlets, and rainwater discharge outlets (when there is flowing water),
Wastewater monitoring with reuse or indirect discharge requirements in the environmental impact report (form) and its approval decision by the approval department.
3) Monitoring of environmental noise at the factory boundary.
7.2.3.2 Environmental quality monitoring
Environmental quality monitoring is mainly aimed at the environmentally sensitive targets required in the environmental impact report (form) and its approval decision by the approval department, including
Monitoring of ambient air, surface water, groundwater, acoustic environment, soil environment, etc., the monitoring factors can be based on the environmental impact report (table) and its
The examination and approval department decides the selection, and the monitoring results can be used as the basic data for analyzing the impact of the project on the surrounding environmental quality. Ambient air monitoring should be full
To meet the requirements of HJ 194, HJ 691, etc., surface water monitoring should meet GB/T 14581, HJ/T 52, HJ/T 91, HJ 493, HJ 494, HJ 495
and other requirements, groundwater monitoring should meet the requirements of HJ 164, HJ 1019, etc., and acoustic environment monitoring should meet the requirements of GB 3096, HJ 640, etc.
Soil environmental monitoring should meet the requirements of HJ/T 166, HJ 1019, etc.
8 Implement acceptance monitoring and inspection
8.1 On-site monitoring and inspection
Carry out on-site monitoring according to the acceptance monitoring plan, do a good job of quality control and quality assurance of on-site monitoring according to relevant technical specifications, and conduct on-site monitoring
The construction and operation of other environmental protection facilities involved shall be further inspected on site.
8.2 Requirements for working condition records
The actual working conditions during monitoring and the key parameters that determine or affect the working conditions are truthfully recorded, and the truthful recording can reflect the operation of environmental protection facilities
Main indicator of status.
a) Record the amount of raw and auxiliary materials and product output during the monitoring period of each major production unit.
b) The coating process records the number of sprayed objects, the amount of paint used, the sprayed area, and the changes in spraying production load.
c) The volatile organic compound treatment facility records key operating parameters such as operating time, waste gas treatment volume, operating temperature, and residence time.
d) The operating load of the supporting boilers and kilns, and record the steam generation and fuel consumption during the monitoring period.
e) The operating load of sewage treatment facilities, record the amount of sewage treatment, sewage recycling, sewage discharge, and sludge production during the monitoring period (recorded
water content), the name and dosage of the main chemicals used in sewage treatment, etc.
8.3 Monitoring data collation
Organize monitoring data in accordance with relevant evaluation standards and technical specifications, and pay special attention to the following when analyzing.
a) According to the evaluation standard, some air pollutants should be converted into the benchmark emission concentration of the benchmark oxygen content according to the measured concentration before reaching the standard.
If there is no need for conversion, the measured concentration will be used for evaluation.
b) The exhaust gas emission rate assessment shall be calculated using the measured concentration.
c) The exhaust gas monitoring data should list the standard exhaust gas flow rate, oxygen content (when conversion is required), measured concentration, and converted concentration (when conversion is required).
d) The waste gas pollutants are calculated based on the single effective evaluation data for the efficiency of treatment facilities, and the efficiency of treatment facilities is calculated according to the amount of pollutants imported and exported.
(exhaust gas flow × pollutant concentration) to calculate.
e) The waste water discharged from the synthetic resin process shall be calculated according to GB 31572 for the actual water discharge per unit product. If the actual water discharge volume per unit product exceeds
For the benchmark water discharge per unit product, it is necessary to convert the measured concentration of water pollutants into the benchmark water discharge concentration of water pollutants, and compare it with the discharge concentration.
Comparing the limit values to determine the compliance with the standard.
f) The efficiency of the treatment facility is calculated based on the daily average concentration of wastewater pollutants; if the inlet and outlet of the treatment facility are not in one-to-one correspondence,
The amount of pollutants entering and exiting the treatment facility (water volume × pollutant concentration) is used to calculate the treatment efficiency; when the treatment unit enters and exits the water
When the amount is the same, the concentration value can be directly used to calculate the treatment efficiency.
g) According to the requirements of GB/T 8170 and HJ 630, the judgment, processing and data revision of abnormal values shall be carried out.
9 Prepare acceptance monitoring report (table)
9.1 Main content of acceptance monitoring report (table)
The main contents of the acceptance monitoring report (table) should include project overview, acceptance basis, project construction, environmental protection facilities, acceptance
Implementation standards, acceptance monitoring content, quality assurance and quality control results, acceptance monitoring results and acceptance monitoring conclusions. Acceptance monitoring report (table)
For the recommended format, please refer to Appendix 2 in the Appendix of the "Technical Guidelines for Environmental Protection Acceptance of Construction Projects Completion and Pollution Impacts".
9.2 Quality Assurance and Quality Control Results
On the basis of the "Quality Assurance and Quality Control" chapter of the acceptance monitoring plan, supplement the ability of the personnel participating in the acceptance monitoring.
Indicate the quality assurance and quality control measures taken for measurement, water monitoring, noise monitoring, etc., and list the names and types of instruments used.
number, serial number, corresponding calibration, quality assurance and quality control results, etc.
9.3 Acceptance monitoring results
9.3.1 Production conditions
The list describes the actual working conditions during the monitoring period, the key parameters that determine or affect the working conditions, and the main parameters that reflect the operating status of the environmental protection facilities.
To index.
9.3.2 Effect of commissioning and operation of environmental protection facilities
9.3.2.1 Pollutant discharge monitoring results
According to the acceptance monitoring data, evaluate whether the monitoring results of waste gas, waste water, and boundary environmental noise meet the relevant standards.
According to the monitoring results of the "new and old" facilities, evaluate whether the pollutant discharge meets the requirements of relevant standards.
9.3.2.2 Monitoring results of treatment efficiency of environmental protection facilities
Calculate the treatment efficiency of major pollutants and evaluate the treatment efficiency of environmental protection facilities according to the monitoring data of the inlet and outlet of waste gas and wastewater treatment facilities
Whether the rate complies with the relevant standards and the approval decision requirements of the environmental impact report (form) approval department. If it does not meet the requirements, the reasons should be analyzed.
If the monitoring conditions are not monitored, the reasons shall be explained.
9.3.3 Impact of project construction on environmental quality
According to the acceptance monitoring data, evaluate the environmental quality monitoring of environmental sensitive targets such as ambient air, surface water, groundwater, acoustic environment, soil, etc.
Whether the results meet the relevant standard requirements. If it exceeds the standard, the reasons should be analyzed. For monitoring factors without evaluation criteria, just list the monitoring results.
fruit, no evaluation.
9.4 Acceptance monitoring conclusion
9.4.1 Effect of commissioning and operation of environmental protection facilities
9.4.1.1 Pollutant discharge monitoring results
Briefly describe whether the monitoring results of various pollutants such as exhaust gas, waste water, and environmental noise at the factory boundary meet the requirements of relevant standards.
9.4.1.2 Monitoring results of treatment efficiency of environmental protection facilities
Briefly describe whether the treatment efficiency of major pollutants in environmental protection facilities such as waste gas and waste water complies with relevant standards, and the environmental impact report (form) review
Approval decision requirements of the approval department.
9.4.2 Impact of project construction on environmental quality
If environmental quality monitoring is involved, evaluate the ambient air, surface water, groundwater, acoustic environment, and soil environment of sensitive targets surrounding the project.
Whether the quality monitoring results meet the relevant standard requirements.
9.4.3 Implementation of environmental protection facilities
Briefly describe whether the environmental impact report (form) and the approval decision of the approval department have implemented the waste gas, waste water and noise treatment facilities, solid
Waste utilization and disposal facilities, environmental risk prevention facilities, groundwater pollution prevention and control facilities, soil pollution prevention and control facilities, online monitoring facilities,
The requirements of various environmental protection facilities such as "new and old" facilities.
9.5 Attachment of acceptance monitoring report (table)
The annex to the report is the main proof or supporting materials involved in the content of the acceptance monitoring report (table), mainly including the environmental impact of the approval department
Approval decision of report (table), monitoring data report, description of project changes, agreement on entrusted utilization and disposal of hazardous waste and disposal unit
Qualification certificate, etc.
10 Follow-up acceptance work
After the acceptance monitoring report is completed, enter the follow-up acceptance work procedure, put forward acceptance opinions, and prepare "other matters that need to be explained".
Form an acceptance report and disclose it to the public, log in to the National Construction Project Completion Environmental Protection Acceptance Information System Platform to fill in relevant information, and establish a file
case. Refer to Appendix F for the recommended method for subsequent acceptance work.
Acceptance opinions shall include the basic situation of project construction, project changes, implementation of environmental protection facilities, commissioning and operation of environmental protection facilities.
The effect of the project, the impact of the project construction on the environment, the main problems existing in the project, the acceptance conclusion and the follow-up requirements.
"Other Items to be Explained" should truthfully record the design, construction, and acceptance process of the project's environmental protection facilities, as well as the pollutant discharge permit.
The implementation of the certificate and the implementation of the regional reduction plan, the environmental impact report (form) and the environmental protection requirements proposed in the approval decision of the approval department
The implementation of other environmental protection measures outside the protection facility and the rectification work.
For the compilation content and requirements of the acceptance opinions and "other matters that need to be explained", please refer to the "Technical Guidelines for Environmental Protection Acceptance of Construction Projects Completion"
Appendices 4 and 5 in the "Pollution Impact Category" annex.
The acceptance report is a summary document that records the environmental protection acceptance process and results of the completed construction project, including the acceptance monitoring report and acceptance opinions.
and "other matters that need to be explained".
Appendix D
(informative appendix)
Acceptance monitoring plan content
D.1 Project Overview
Briefly describe the project name, nature, scale, location, the process of environmental impact assessment, design, construction, approval and other information, as well as the approval document number, etc.
Project start, completion, commissioning time, application for pollutant discharge permit or pollutant discharge registration, actual total investment of the project and investment in environmental protection.
Clarify the scope of acceptance, such as phased acceptance, the scope of this acceptance shall be stated; the organization and implementation plan of acceptance monitoring work shall be described.
D.2 Acceptance basis
a) Laws, regulations and rules and regulations related to environmental protection of construction projects.
b) Technical specifications for acceptance of environmental protection (facilities) upon completion of construction projects.
c) The environmental impact report (form) of the construction project and the approval decision of the approval department.
d) Other relevant documents of the competent department of ecological environment.
D.3 Project Construction Situation
D.3.1 Geographical location and layout
Briefly describe the construction site and surrounding environment of the project, and attach the actual location map and floor plan of the project.
The geographic location map indicates that the surrounding environment of the project is sensitive to environmental protection...
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of HJ 407-2021_English be delivered?Answer: Upon your order, we will start to translate HJ 407-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of HJ 407-2021_English with my colleagues?Answer: Yes. The purchased PDF of HJ 407-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version HJ 407-2021?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version HJ 407-2021 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|