HJ/T 255-2006
: Technical guidelines for environmental protection in power plant capital construction project for check and accept of completed project
Status: Valid
Standard ID
Contents [version]
USD
STEP2
[PDF] delivered in
Standard Title (Description)
Status
PDF
HJ/T 255-2006
English
759
Add to Cart
5 days [Need to translate]
Technical guidelines for environmental protection in power plant capital construction project for check and accept of completed project
Valid
HJ/T 255-2006
PDF similar to HJ/T 255-2006
Standard similar to HJ/T 255-2006
GB 13223
HJ/T 390
HJ/T 373
HJ 407
HJ 254
HJ 510
Basic data
Standard ID
HJ/T 255-2006 (HJ/T255-2006)
Description (Translated English)
Technical guidelines for environmental protection in power plant capital construction project for check and accept of completed project
Sector / Industry
Environmental Protection Industry Standard (Recommended)
Classification of Chinese Standard
Z62
Classification of International Standard
13.020
Word Count Estimation
26,243
Date of Issue
2006-03-09
Date of Implementation
2006-05-01
Quoted Standard
GB 3095; GB 3096; GB 5468; GB 8978; GB 12348; GB 12349; GB 13223; GB 13271; GB 16297; GB 18599; GB/T 16157; HJ/T 48; HJ/T 55; HJ/T 75; HJ/T 76; DL 414
Issuing agency(ies)
Ministry of Ecology and Environment
Summary
This standard specifies the thermal power plant and acceptance of completed construction projects to determine the scope of work, performance standards selected monitoring sites layout, sampling, analytical methods, quality control and quality assurance, monitoring programs and monitoring of the preparation of reports and other technical requirements. This standard applies to a single output in the 65t/h above except layer burning stove and furnace stoker boiler thermal power plants outside, a variety of power generation capacity of the pulverized coal boiler, oil-fired boilers, gas turbines of various capacities and power plants generating boilers using other fuels and cogeneration acceptance of completed construction projects, environmental impact assessment, preliminary design (environmental topics), after the completion of construction projects daily technical supervision and management of monitoring can be performed with reference to the technical specifications.