|
US$2259.00 · In stock Delivery: <= 13 days. True-PDF full-copy in English will be manually translated and delivered via email. HJ 853-2017: Technical specification for application and issuance of pollutant permit Petrochemical Industry Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| HJ 853-2017 | English | 2259 |
Add to Cart
|
13 days [Need to translate]
|
Technical specification for application and issuance of pollutant permit Petrochemical Industry
| Valid |
HJ 853-2017
|
PDF similar to HJ 853-2017
Basic data | Standard ID | HJ 853-2017 (HJ853-2017) | | Description (Translated English) | Technical specification for application and issuance of pollutant permit Petrochemical Industry | | Sector / Industry | Environmental Protection Industry Standard | | Classification of Chinese Standard | Z00 | | Word Count Estimation | 98,982 | | Date of Issue | 2017-08-22 | | Date of Implementation | 2017-08-22 | | Regulation (derived from) | Ministry of Environmental Protection Bulletin 2017 No. 40 | | Issuing agency(ies) | Ministry of Ecology and Environment |
HJ 853-2017: Technical specification for application and issuance of pollutant permit Petrochemical Industry ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Discharge permit application and issuance technical specification petrochemical industry)
National Environmental Protection Standard of the People 's Republic of China
Application code for sewage permit application and issuance
Petrochemical industry
Technical specification for application and issuance of
pollutant permit petrochemical industry
2017-08-22 released
2017-08-22 Implementation
Ministry of Environmental Protection released
Directory
Preface I
1. Scope of application
Normative reference document
3. Terms and definitions
4. The basic requirements of the sewage unit
5. Determination of emission and emission limits and permitted emission limits
6. Pollution control feasible technology 14
7. Self-monitoring management requirements
8. Environmental management desk and discharge permit implementation report preparation requirements
9. Actual emissions accounting method
10. Compliance Determination Method
Appendix A (informative) petrochemical industry sewage unit production plant .30
Appendix B (informative) part of the production facilities to fill in the report .33
Appendix C (informative) Schedule of waste gas treatment and waste water treatment facilities
Appendix D (informative) Storage tank Unorganized volatile organic matter Permissible emissions Default calculation parameters 70
Appendix E (informative) Environmental Management Accounting Record Reference Table
Appendix F (informative) Report on the implementation of the discharge permit
I preface
In order to implement the Law of the People's Republic of China on Environmental Protection, the Law of the People's Republic of China on the Prevention and Control of Atmospheric Pollution,
And the State Water Pollution Prevention Law "and other laws and regulations and the" General Office of the State Council on the issuance of emission control of pollutants licensing system implementation of the notice "
(National Office issued 〔2016】 No. 81), improve the technical licensing system for sewage permits, to guide and regulate the petrochemical industry sewage permit application and nuclear
Work to develop this standard.
This standard specifies the petrochemical industry sewage permit application and issuance of the basic situation to fill in the requirements of the permit emission limit to determine the actual
Emission accounting, compliance determination methods and self-monitoring, environmental management accounts and emissions permit implementation report and other environmental management requirements,
Put forward the petrochemical industry pollution prevention and control feasible technical requirements.
Where the issuing authority issues a permit for the discharge of the sewage, it shall, in the case of a country or a place where it is expressly prohibited in the construction area
Clearly stipulated to be eliminated or banned petrochemical industry sewage units or production equipment, should not be issued petrochemical industry sewage permit.
Appendix A to Appendix F of this standard are informative.
This standard is the first release.
This standard is formulated by the Planning and Finance Division of the Ministry of Environmental Protection and the Standards Division of Science and Technology.
The drafting of this standard. Hainan Provincial Environmental Science Research Institute, China University of Petroleum (East China), China Petroleum & Chemical Corporation
Division Fushun Petrochemical Research Institute, Environmental Protection Department Environmental Engineering Assessment Center, Renmin University of China, China Petroleum Group Safety and Environmental Protection Technology
Research Institute, CNOOC Environmental Protection Services (Tianjin) Co., Ltd.
This standard is approved by the Ministry of Environmental Protection on August 22,.2017.
This standard has been implemented since August 22,.2017.
This standard is explained by the Ministry of Environmental Protection.
1 sewage permit application and issuance of technical specifications petrochemical industry
1. Applicable scope
This standard specifies the petrochemical industry sewage permit application and issuance of the basic situation to fill in the requirements of the permit emission limit to determine the actual
Emissions accounting, compliance with the technical methods and self-monitoring, environmental management accounts and emissions permit implementation report and other environmental management
Requirements, put forward the petrochemical industry pollution prevention and control of feasible technical requirements.
This standard applies to guide the petrochemical industry sewage unit to fill out the "sewage permit application form" and fill in the relevant application information online, appropriate
Used to guide the issuance authorities to determine the petrochemical industry sewage unit permit permit permit.
This standard applies to the petrochemical industry sewage unit emissions of air pollutants and water pollutants permit management, including GB 31570,
GB 31571 and GB 31572 in the oil refining, petrochemical, synthetic resin industrial sewage units.
Petrochemical industry sewage units, the implementation of GB 13223 production facilities and discharge ports for the ring water [2016] 189 in the annex
1 "thermal power industry sewage permit application and issuance of technical specifications"; implementation of GB 13271 production facilities and discharge ports with reference to this standard
Line, pending the application of the boiler sewage permit and issued after the promulgation of technical regulations.
This standard does not make provision, but the discharge of industrial waste water, waste gas or national regulations of toxic and harmful air pollutants in the petrochemical industry sewage
Other production facilities and discharge of the unit, with reference to the "sewage permit application and issuance of technical specifications" implementation.
2. Normative references to documents
This standard refers to the following documents or the terms thereof. For undated references, the valid version applies to this standard.
Emission standard of air pollutants in thermal power plants GB 13223
GB 13271 Boiler Air Pollutant Emission Standard
Emission standard for odorous pollutants GB 14554
Standard for Pollution Control of Hazardous Waste Incineration
Emission Standard for Industrial Pollutants for Petroleum Refining
Petroleum and chemical industry - Pollutant emission standards
GB 31572 Synthetic resin - Industrial pollutant discharge standard
Determination of particulate matter and sampling method of gaseous pollutants in exhaust gas of fixed pollution sources GB/T 16157
Technical Guidelines for Unorganized Emissions Monitoring of Air Pollutants
HJ/T 75 fixed pollution sources flue gas discharge continuous monitoring technical specifications (Trial)
HJ/T 76 fixed pollution source flue gas emissions continuous monitoring system technical requirements and testing methods (Trial)
Technical specification for surface water and wastewater monitoring
HJ/T 212 Pollution Source Online Automatic Monitoring (Monitoring) System Data Transmission Standard
HJ/T 353 water pollution source on-line monitoring system installation technical specifications (Trial)
HJ/T 354 Water Pollution Source Online Monitoring System Acceptance Technical Specification (Trial)
HJ/T 355 water pollution source on-line monitoring system operation and assessment of technical specifications (Trial)
HJ/T 356 Water pollution source online monitoring system data validity judgment technical specification (Trial)
HJ/T 373 fixed pollution source monitoring quality assurance and quality control technical specifications (Trial)
Technical specification for HJ/T 397 fixed source exhaust gas monitoring
Technical specification for preservation and management of water quality samples
Technical Guidance for Water Quality Sampling
Technical specification for water quality sampling scheme design of HJ 495
Technical Guidelines for the Detection of Volatile Organic Compounds for Leakage and Open Liquid Discharge
General guidelines for self - monitoring of sewage disposal units
Technical Guideline for Self - Monitoring of Sewage Discharge Unit
Technical specification for industrial wastewater treatment of petroleum refining industry
General rules for application and issuance of emission permits
HJ □□ -20 □□ Discharge Unit Self-Monitoring Technical Guide Petroleum Refining Industry
HJ □□ -20 □□ Self-monitoring technical guidelines for sewage units. Petrochemical industry
HJ □□ -20 □ □ Environmental Management Account and Discharge Permit Implementation Report Technical Specification (Trial)
Fixed pollution source pollution permit classification management directory
"Notice of the General Office of the State Council on Strengthening Enforcement of Environmental Supervision Law" (No. 46 [2014] of the State Council)
"Pollution source automatic monitoring facilities operation and management approach" (Central [2008] No. 6)
"Notice on the Implementation of Special Limitation of Emissions of Air Pollutants" (Announcement No. 14 of.2013)
"Sewage outfall standardization of technical requirements (Trial)" (Environmental Monitoring [1996] No. 470)
"Notice on the Issuance of the Interim Provisions on the Administration of Pollution Permit" (Ring Water [2016] No. 186)
"On the thermal power, paper industry and the Beijing-Tianjin-Hebei pilot cities elevated source sewage permit management notice" (ring water body
[2016] 189)
"On the issuance of petrochemical industry VOCs pollution source troubleshooting work guide" and "petrochemical enterprises leak detection and repair work guide" pass
Know "(Central Office 〔2015〕 104)
"Reply to the question of the special discharge limit for the implementation of air pollutants" (Circular No. 1087) [
"Notice on Strengthening the Relevant Issues Concerning the Automatic Monitoring of Pollutants at Elevated Source in Beijing and Tianjin Provinces" (Circular No. 1488)
3. Terms and definitions
The following terms and definitions apply to this standard.
3.1 petroleum refining industry petroleum refining industry
Refers to crude oil, heavy oil as raw materials, the production of gasoline fractions, diesel fractions, fuel oil, lubricants, petroleum wax, petroleum asphalt and
Petrochemical raw materials and other industries.
Petroleum chemical industry
Refers to the oil fractions, natural gas as raw materials, the production of organic chemicals, synthetic resin, synthetic fiber, synthetic rubber and other industries.
Synthetic resin industry
Refers to the low molecular weight compound - monomer as the main raw material, the use of polymerization into a large molecular way to produce synthetic resin industry,
Or the use of ordinary synthetic resin as raw material, the use of modified methods such as the production of new synthetic resin products industry.
3.4 permissible emission limits
Refers to the maximum discharge concentration (or rate) and emissions of pollutants discharged by the pollutant discharge unit as specified in the pollutant discharge permit.
3.5 special periods of time periods
Refers to the national and local deadline for compliance with the planning and other relevant environmental management regulations, the sewage unit emissions of pollutants are special
Special requirements of the period, including heavily polluted weather response period.
3.6 volatile organic compounds volatile organic compounds
Refers to an organic compound that participates in an atmospheric photochemical reaction, or measures or evaluates an organic compound according to a defined method. this
The standard uses non-methane total hydrocarbons as a comprehensive control index for emissions from exhaust pipes and corporate boundary volatile organic compounds.
Volatile organic liquid
Means any organic liquid capable of releasing volatile organic compounds to the atmosphere in accordance with any of the following conditions. (1) at 20 ° C, volatile organic
The true vapor pressure of the liquid is greater than 0.3 kPa; (2) at 20 ° C, the pure vapor compound with a true vapor pressure greater than 0.3 kPa
Of the total concentration is equal to or higher than 20% by weight.
4. The basic situation of the sewage unit declaration requirements
4.1 Basic principles
The pollutant discharge unit shall fill in the basic situation according to the actual situation and bear the law on the authenticity, legality and integrity of the application materials
responsibility.
The pollutant discharge unit shall, in accordance with the requirements of this standard, report on the application system for the "sewage permit application" in the national sewage permit management information reporting system
Table "in the corresponding information table. Fill in the system drop-down menu is not included, the local environmental protection authorities have required to fill in or row
Sewage units that need to fill in the report, can increase their content.
4.2 Sewage Unit Basic Information
Basic information should be filled in the unit name, postal code, industry category (when the petrochemical industry to pay the relevant industry), whether to put into production
Production date, production and management center center latitude and longitude, whether the location is a key area, environmental impact assessment approval documents and the number (prepared
Case number) or the local government on the violation of the project identification or filing documents and the number of the main pollutant distribution plan documents and the number,
Total particulate matter index, total sulfur dioxide index, total nitrogen oxides index, total chemical oxygen demand index, total ammonia nitrogen index,
Other pollutant aggregate indicators (if any) and so on.
4.3 Production installations and facilities
4.3.1 General principles
When filling in the "production equipment and facilities", you need to select the industry category, apply to the production facilities of this standard, select petrochemical related industries;
Implementation of GB 13223 production facilities selected thermal power industry.
Production equipment and facilities mainly fill in the name of the production device, the production device number, the main process name, the name of the production facility, production
Facility number, facility parameter, raw material name, product name, processing/production capacity, year running time and others.
4.3.2 Production plant
In accordance with the industrial sub-category is divided into crude oil processing and petroleum products manufacturing, organic chemical raw materials manufacturing, primary forms of plastic and synthetic resin
Made of synthetic rubber, synthetic fiber single (polymer) body manufacturing, chemical reagents and additives, synthetic fiber manufacturing, the various categories involved
See Appendix A for the main production installations and utilities.
If the joint production device, should be filled out each set of equipment, such as atmospheric decompression catalytic joint device should be filled with atmospheric and vacuum distillation equipment
Home, catalytic cracking unit, p-xylene joint production equipment should be filled out separate adsorption separation device, disproportionation device, aromatics extraction device.
If the absorption, distillation, extraction, filtration, crystallization, drying, steam (gas) facilities for the pre-reaction material separation and purification, then
Not alone, such as the reaction gas absorption tower of the acrylonitrile production plant, the absorption liquid distillation column, and the like.
4.3.3 Production unit number
Sewage units fill in the internal production unit number. If there is no internal production device number, then use the "PU three serial number" (such as
PU001) and number.
4.3.4 The main process
Including distillation (distillation), cracking (visbreaking, catalytic cracking, ethylene cracking, coking), hydrotreating (hydrocracking,
(Reforming, alkylation, isomerization, disproportionation, superposition), oxidation (oxidation and oxidation)
Hydrogenation, carbonyl synthesis, hydrolysis, esterification, polymerization, extraction, adsorption, absorption, crystallization, solid-liquid separation, drying, spinning,
4, gas recovery and torch, acid gas recovery, organic liquid storage, organic solid storage, organic liquid loading and packaging, industrial water
Water, evaporation, chemical water, circulating cooling water, nitrogen, oxygen, waste water treatment, waste gas treatment.
4.3.5 Production facilities
Divided into required content and optional content.
a) Required content
1) GB 31570, GB 31571 and GB 31572 Controlled plant or production facilities for the generation of waste water contaminants. Such as. acidic water
Stripping tower, atmospheric and vacuum distillation unit electric desalination tank and so on.
2) discharge of waste gas production or environmental protection facilities. Such as. catalytic cracking unit catalyst regenerator, continuous catalytic reforming device catalyst
Regenerator, acrylonitrile production plant reaction gas absorption tower, process heating furnace (including ethylene cracking furnace), boiler, incinerator,
Torch, rubber production device dryer, organic solid material silo, sewage treatment facilities.
3) Atmospheric pressure volatile organic liquid storage tank, volatile organic liquid loading facilities.
4) Equipment and piping components for volatile organic materials flowing through the production plant.
If the absorption, adsorption, filtration equipment is mainly used for recycling materials, should be attributed to the production facilities.
b) Optional content
In addition to the requirements of a), other production facilities are optional. Such as. crude oil distillation unit atmospheric distillation tower, vacuum tower, catalytic
Cracking device reaction product fractionator, dry gas washing tower, hydrorefining low-pressure separator, acrylonitrile production plant fractionation tower.
4.3.6 Production facility number
The sewage unit can fill in the internal production facility number. If the sewage unit has no internal production facility number, according to the ring water body [2016]
No. 189, Annex 4, "Fixed pollution sources (water, atmospheric) coding rules (for trial)" and numbered.
4.3.7 Facility parameters
Production facilities parameters include the design of the exhaust (torch air flow); public units in the boiler, incinerator and other facilities include
Design of the exhaust, the design of the annual operating hours; production equipment in the volatile organic material flow through the equipment and pipeline components should be reported the number of sealed points,
See Table B.1 in Appendix B; tank parameters include tank type, nominal volume, inner diameter, tank height, storage material name, material storage
Temperature and design year turnover, see Table B.2 in Appendix B; loading parameters include loading material name, design year load, loading
Temperature and loading form (train/car/ship/barge). The remaining parameters are optional.
Sewage units fill in the storage of volatile organic liquid atmospheric pressure tank detailed parameters, optional in Appendix B, Table B.3 to Table B.5; fill in
Process furnace and boiler, incinerator, torch, acid water stripping tower and other production facilities detailed parameters, optional Appendix B in Table B.6 ~
Table B.9.
4.3.8 Raw material name
Fill in the name of the main raw material for each production unit. Such as. atmospheric and vacuum distillation unit of raw materials for crude oil, catalytic cracking unit of raw materials
Wax oil, residue, p-xylene plant raw materials for the reforming of oil, mixed aromatic hydrocarbons and so on.
4.3.9 Product name
Fill in the main product name of the production plant. Such as atmospheric and vacuum distillation device products for the top gas, naphtha, often line of oil, often second line
Oil, often three-line oil, reduced overhead gas, vacuum wax oil, vacuum residue, atmospheric residue, ethylene cracker products for the cracking of dry gas, ethylene,
Propylene, pyrolysis gasoline and so on.
4.3.10 Production (processing) capacity and unit of measurement
Fill out the device design and production (processing) capacity, and indicate the unit of measurement. Production (processing) capacity does not include national or local government
Clearly specify the capacity to be eliminated or banned.
54.3.11 years of production time
Fill in the environmental impact assessment document and its approval, the local government on the violation of the project identified or filing documents to determine the annual production hours.
4.3.12 other
If the sewage unit needs to be described, it can be filled in.
4.4 Main raw and auxiliary materials and fuels
4.4.1 General principles
Fill in the use of more than 10 tons of raw materials, accessories and fuel name and design use, which belongs to the "list of dangerous chemicals"
Of raw materials, accessories and fuel, should be filled out.
4.4.2 raw materials, accessories
4.4.2.1. Name
Raw materials include crude oil, heavy oil, petroleum fractions, organic chemicals basic raw materials, petroleum coke, coke, coal, shale, natural gas,
Which crude oil can be filled by the type of crude oil or mixed crude oil, organic chemicals, the basic raw materials to fill the specific raw material name, coal, petroleum coke, coke
Carbon is used as a raw material for hydrogen production.
Accessories fill in the production process of the main accessories and waste water treatment, waste gas treatment process to add the accessories.
4.4.2.2 Design Year Use
Fill in the design year to match the capacity of the production (processing).
4...
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of HJ 853-2017_English be delivered?Answer: Upon your order, we will start to translate HJ 853-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 9 ~ 13 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of HJ 853-2017_English with my colleagues?Answer: Yes. The purchased PDF of HJ 853-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|