Acceptance specification for environmental information network
| Valid |
HJ 725-2014
|
Standard similar to HJ 725-2014 HJ 511 HJ 945.3 HJ 943
Basic data Standard ID | HJ 725-2014 (HJ725-2014) | Description (Translated English) | Acceptance specification for environmental information network | Sector / Industry | Environmental Protection Industry Standard | Word Count Estimation | 28,268 | Date of Issue | 12/25/2014 | Date of Implementation | 3/1/2015 | Regulation (derived from) | Ministry of Environmental Protection notice 2014 No. 87 | Issuing agency(ies) | Ministry of Ecology and Environment |
HJ 725-2014: Acceptance specification for environmental information network---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Acceptance specification for environmental information network
National Environmental Protection Standard of the People 's Republic of China
Environmental Information Network Acceptance Specification
2014-12-25 release
2015-03-01 Implementation
Ministry of Environmental Protection released
Directory
Preface ..II
1 Scope of application
2 normative reference documents
3 terms and definitions
4 General requirements
5 main acceptance content and requirements 2
Acceptance Test Project 5
7 integrated wiring acceptance 8
Appendix A (informative) Acceptance Process Example
Appendix B (informative appendix) Inspection and acceptance of the whole network Table 13
Appendix C (informative) Wide Area Equipment Acceptance Table
Appendix D (informative) Metropolitan Area Equipment Acceptance Table
Appendix E (Informative Appendix) LAN Equipment Acceptance Table 18
Appendix F (informative) firewall acceptance form ..20
Appendix G (informative) Integrated wiring system engineering inspection items and contents
Appendix H (Informative Appendix) Acceptance Application Form 25
Foreword
To implement the "People's Republic of China Environmental Protection Law" to promote environmental information work, standardize the contents of the network acceptance, the basic
Requirements and acceptance process, the development of this standard.
This standard specifies the environmental information network acceptance of the overall requirements, the basic process, the main content of network acceptance and network systems
Test the technical requirements.
Appendix A, Appendix B, Appendix C, Appendix E, Appendix F, Appendix G, Appendix H are informative.
This standard is the first release.
This standard is organized by the Ministry of Environmental Protection Science and Technology Standards Division.
The main drafting of this standard. Environmental Information Department of the Ministry of Environmental Protection.
The Environmental Protection Department of this standard approved on December 25,.2014.
This standard is implemented on March 1,.2015.
This standard is explained by the Ministry of Environmental Protection.
Environmental Information Network Acceptance Specification
1 Scope of application
This standard specifies the environmental information network acceptance of the overall requirements, the basic process, the main content and network system testing technology
Technical requirements.
This standard applies to the national and provincial environmental protection administrative departments of environmental information network acceptance work. City, county
Class environmental protection administrative departments and all levels of environmental protection departments directly under the unit can refer to the implementation.
2 normative reference documents
The contents of this standard refer to the following documents or their terms. Those who do not specify the date of the reference file, the effective version of the appropriate
For this standard.
GB/T 18019 Information technology - Packet filtering - Security requirements for firewalls
GB/T 18020 Information technology - Application - level firewall security technical requirements
GB/T 18233 Information technology Users of the general group of buildings
Code for design of integrated wiring system for buildings and buildings GB/T 50311
Code for acceptance of GB/T 50312 integrated wiring system engineering
HJ 460 environmental information network construction specification
Detection of safety functions of the GA 372 firewall product
YD/T 1096 router device specification - low-end router
YD/T 1097 router device technical specifications - high-end router
YD/T 1098 router test specification - low-end router
Technical Specification for YD/T 1099 Gigabit Ethernet Switch Equipment
YD/T 1132 firewall equipment technical requirements
Test Method for YD/T 1141 Gigabit Ethernet Switch
YD/T 1156 router test specification - high-end router
Technical Requirements for Ethernet Switches with Routing Functionality YD/T 1255
YD/T 1287 Ethernet switch test method with routing function
IEC 61935..2005 Balanced communication cable test according to GB/T 18233/ISO /IEC 11801 Part 1. Installed cloth
3 terms and definitions
The terms and definitions established in HJ 460 apply to this standard.
4 General requirements
4.1 Establish acceptance organization
Establish the project acceptance organization, by the construction unit, the relevant business department, the construction unit, the expert group, the project total integration
And engineering supervision.
4.2 acceptance of organizational form
According to the type and size of the project to determine the form of acceptance, clear responsibilities of the parties. Large projects should be set up project leading group,
Under the project office and the working group.
4.3 to develop acceptance program
Acceptance program mainly includes. project overview, acceptance basis, acceptance time, location and members, acceptance procedures, acceptance of the main
To content, acceptance requirements and acceptance of output documents.
4.4 clear acceptance process
According to the type and characteristics of the project, the project organization form and acceptance plan, develop the corresponding acceptance process, see Appendix A.
5 Main acceptance contents and requirements
According to the project network system construction cycle, acceptance work includes. equipment arrival acceptance, system testing, preliminary acceptance, the Department of
Unified test run, completion acceptance, acceptance report.
5.1 Acceptance of equipment arrival
Network equipment acceptance includes equipment quantity confirmation, equipment out of the box inspection, equipment power test, equipment installation and commissioning,
End user signature confirmation and other steps.
5.1.1 Confirm the number of equipment
For the arrival of the arrival of the equipment, the need to build units with the system total integration, engineering supervision units, construction units in accordance with the arrival
The list requires the completion of the number of equipment inventory and registration work.
5.1.2 Equipment out of the box inspection
Construction unit with the system total integration, project supervision units, construction units in accordance with the arrival list requirements, the packaging of equipment
Appearance, brand, model, accessories, etc. to check, register.
5.1.3 Equipment power test
The construction unit to complete the distribution and out of the box inspection equipment, one by one power test, and is responsible for the test records were submitted to the Department
Unified management, engineering supervision units, construction units.
5.1.4 equipment installation and commissioning
The construction unit shall, on the basis of the power supply test of the equipment, carry out the equipment for the equipment involved in the integration work
Cabinet installation, commissioning and system debugging, and is responsible for the test records were submitted to the system integration, engineering supervision alone
Bit, construction unit. Equipment installation specific requirements.
A) equipment installation should meet the relevant requirements of engineering design documents;
B) equipment layout should ensure that the appropriate maintenance intervals; equipment should be neatly arranged, conducive to ventilation and cooling;
C) equipment installation should be strong, the rack should be installed seismic reinforcement base;
D) cable layout should be neat and reasonable, the laying of the cable should be tied, elastic moderate, each should be marked.
5.1.5 End User Signature Confirmation
After the equipment quantity confirmation, unpacking test, power test and installation and commissioning are completed, the construction unit needs to assist the terminal
Household, complete the "equipment out of the box inspection table" and "equipment commission record report" signature confirmation work.
5.2 System testing
Equipment installation and commissioning is completed, the system should be set up a test team, by the construction unit, the system total integration, engineering supervision, bearing
Build units, develop test programs, according to the program for network system testing. After the completion of the test, issued by the construction unit measured
Test report, and signed by the test group signed four. See Chapter 6 for details of the test.
5.3 Preliminary acceptance
Construction units in accordance with the provisions of the way to complete the arrival of equipment acceptance and network installation and commissioning, and to achieve stable operation of the construction network
After that, the "Project Preliminary Application Form" can be submitted to the construction unit and the project supervision unit (see Appendix H). Construction units and workers
The supervisor of the project conducts the inspection and evaluation from the aspects of the document, the terms of the contract and the effect of the technology, and the supervisor of the project
Department to submit an assessment opinion. The competent department of the project shall, in accordance with the opinions of the parties, organize the preliminary work of the equipment. Acceptance is based on contract
And the contents of the tender documents.
5.4 completion acceptance
After the initial acceptance is completed, after not less than 3 months of trial operation, the construction unit can be to the construction unit and engineering supervision
("Appendix H") and "Self Test Report". Construction units and engineering supervision units respectively
From the documents, contract terms and technical effects and other aspects of the inspection and assessment, and to submit the assessment of the project authority
see. The competent department of the project shall, in accordance with the opinions of the parties, refer to the hierarchical management mode of the preliminary inspection of the equipment and organize the acceptance work.
5.4.1 Completion acceptance contents and requirements
A) complete the engineering design and contract terms of the content;
B) complete technical file and construction management information;
C) entry and inspection reports of major materials, fittings and equipment for engineering use;
D) have the engineering design, implementation, project supervision and other units signed the quality of qualified documents;
E) The after - sales service and training plan of the construction unit has been completed and the construction unit has paid the construction project according to the contract.
F) all sub-projects fully qualified;
G) all kinds of equipment by the power running state is normal;
H) the construction unit self-test completed and qualified.
5.4.2 Completed technical documentation requirements
A) construction organization design program;
B) technology to deepen the design;
C) construction management documents;
D) Material entry inspection procedures;
E) project implementation quality, safety inspection records;
F) Engineering change procedures;
G) equipment details list;
H) Completion of the project;
I) system commissioning record, report;
J) engineering self-test report;
K) project acceptance report;
L) project summary report;
M) Project completed drawings;
N) training documentation;
O) Project maintenance manual;
P) after - sales service guarantee documents;
Q) engineering instructions;
R) project start report form;
The total number of installed works;
T) installed equipment, bill of materials;
U) engineering design change orders;
V) stop (re) notice;
W) Major quality accident report form;
X) with the inspection records and hidden engineering visa;
Y) delivery (intermediate work) acceptance notice;
Z) acceptance certificate;
Aa) test record;
Bb) Completed drawings;
Cc) equipment, material transfer orders;
Dd) equipment, more than material transfer orders;
Ee) memorandum;
Other information.
5.5 Test documentation
Network System Integration Project The construction unit submits a complete engineering document to the construction unit, including at least the following.
A) equipment list;
B) system structure diagram;
C) network topology;
D) equipment configuration table;
E) equipment configuration information;
F) network system testing tools software and programs;
G) Test results report.
5.6 Acceptance Report
5.6.1 General
By the project construction unit in conjunction with the relevant departments to organize acceptance, and issued acceptance report. Acceptance reports include. project overview and
Construction requirements, design, line wiring table and equipment layout, system parameter setting table, user operation and maintenance manual,
Self-test reports, third-party test reports, commissioning reports, and user reports.
5.6.2 Project Overview and Construction Requirements
Including the project construction unit, design unit, the implementation of the unit, the project size, project functional requirements, project technical indicators to
Waiting for.
5.6.3 design
Including user needs analysis, networking plan, equipment selection, network topology, configuration function description, design change record
Wait.
5.6.4 Line wiring table and equipment layout
Including the integrated wiring system, the network system equipment layout, line port and patch panel description file, line endpoint
Should table.
5.6.5 System parameter setting table
Including IP address allocation table, subnetting table, VLAN partition table, routing table.
5.6.6 User Operation and Maintenance Manual
Including system operating instructions, system installation, recovery, and data backup instructions.
5.6.7 self-test report
Including self-test report of integrated wiring system, self-test report of network system.
5.6.8 Third Party Test Report
Integrated third-party acceptance test report of the cabling system, third-party sampling test report of network equipment.
5.6.9 commissioning report
Including the operation of the network system during the trial run, troubleshooting, hardware and software system adjustment.
5.6.10 User Report
The report issued by the user for the use of the network system.
Acceptance test items
6.1 Wide Area Network Acceptance Test Project
6.1.1 Single point equipment testing
6.1.1.1 General
Interface function of the router device, communication protocol function, packet forwarding function, routing information maintenance, management control function
Safety and performance indicators shall comply with the requirements of YD/T 1096, YD/T 1097 and the product express requirements. The corresponding test
The method shall comply with the provisions of YD/T 1098, YD/T 1156.
6.1.1.2 Aggregation Router
Aggregate Router Test See Appendix C for C.1 WAN Aggregation Router Acceptance Table.
6.1.1.3 Access the router
Access Router Test See Appendix C for C.2 WAN Access Router Acceptance Table.
6.1.1.4 WAN wide network test
WAN network test see Appendix B.1 network interoperability test (router).
6.2 Metropolitan Area Network Acceptance Test Project
6.2.1 Single point equipment testing
6.2.1.1 General
Interface function of the router device, communication protocol function, packet forwarding function, routing information maintenance, management control function
Safety and performance indicators shall comply with the requirements of YD/T 1096, YD/T 1097 and the product express requirements. The corresponding test
The method shall comply with the provisions of YD/T 1098, YD/T 1156.
6.2.1.2 Aggregation Routers
Aggregate router tests are described in Appendix D D.1 Metropolitan Area Network Aggregation Router Acceptance Table.
6.2.1.3 Access the router
The access router test is described in Appendix D, D.2 Metropolitan Area Network Access Router Acceptance Table.
6.2.2 Metro network test
For the whole network test of the metropolitan area network, please refer to Appendix B.1 Interconnection Test (Router).
6.3 Local network system acceptance test project
6.3.1 Transmission media requirements
6.3.1.1 Twisted Pair Wiring System
LAN system transmission media generally use five, super five or six unclassified (shielded) twisted pair cabling system.
Twisted-pair cabling system transmission indicators, transmission performance and test methods should be consistent with GB/T 50311, GB/T 50312, GB/T
18233, IEC 61935..2005 and other standards.
6.3.1.2 Multi-mode, single-mode cable routing system
According to the length of the transmission distance, LAN system can be multi-mode or single-mode fiber cabling system. Transmission of cable routing system
Input indicators and test methods should be consistent with GB/T 50311, GB/T 50312 and other standards.
6.3.2 Single point equipment testing
6.3.2.1 Aggregate switches
The port density of the switch used in the LAN system, the data frame forwarding function, the data frame filtering function, the data frame transfer
Hair and filter information maintenance functions, operation and maintenance functions, network management functions and performance indicators should be consistent with YD/T 1099, YD/T
1255 requirements and product express requirements. The corresponding test method shall comply with the requirements of YD/T 1141, YD/T 1287.
Aggregate Switch Test See Appendix E for E.1 LAN Aggregation Switch Acceptance Table.
6.3.2.2 Access the switch
Refer to E.2 LAN Access Switch Acceptance Table in Appendix E for access switch testing.
6.3.3 LAN network system testing the whole network
LAN network system network test see Appendix B.2 network interoperability test (switch).
6.4 firewall acceptance test items
6.4.1 Single point equipment test
User data protection, identification and authentication, password, security auditing, and performance for firewall devices
The standard shall comply with the provisions of GB/T 18019, GB/T 18020, YD/T 1132 and the product express requirements. The corresponding test method should be
Conforms to GA 372.
Refer to F.1 Firewall Acceptance Table in Appendix F for firewall device testing.
6.4.2 Firewall full network security policy test
For the firewall security policy test, see Appendix F for F.3 Firewall Security Policy Test Acceptance Table.
6.5 network management platform functional requirements
6.5.1 configuration management requirements
6.5.1.1 Network device system configuration
Through the network equipment system configuration, the user can query and modify the system configuration information of the network equipment.
Equipment manufacturer, device software version, device number (ID), device IP address, device name, device network identification, device
Running time and so on.
6.5.1.2 Physical port configuration
Network devices generally have multiple physical ports, users should be able to query and modify the network device physical port configuration,
Including port identifier, port type, port rate, port management status, port working status, and so on.
6.5.1.3 protocol function configuration
Network devices should support the commonly used TCP/IP protocol, including IP, TCP, UDP, ICMP, SNMP and so on. In a
In a more complex LAN system, each network device also supports VLAN, IGMP, STP, NAT, DHCP
And routing protocols and other agreements; users should be able to query and modify the configuration of the various agreements and the operation of these agreements
Status and running results.
6.5.2 Alarm management
6.5.2.1 Configuration of alarm information
The user can enable and disable alarm information, and configure the alarm level and alarm threshold.
6.5.2.2 Alarm information read
Through the network management platform to display the details of the alarm information, including the alarm source, alarm type, alarm level,
Alarm location, alarm time, alarm end time, alarm information description, and so on.
6.5.2.3 Management of alarm information
The alarm information can be saved and backed up; on the preservation of the alarm information should be able to carry out a variety of conditions of the query, the package
Including based on the alarm source, alarm time, alarm level and other inquiries, and the form and graphics can be the way the alarm query
The results are displayed to the user; the saved alarm information should be able to be deleted.
6.5.3 Performance Management
6.5.3.1 Real-time monitoring of performance data
Capable of real-time display of various performance data for transmission, including.
A) the number of Ethernet frames sent and received by each physical port;
B) the number of CRC errors received by each physical port;
C) the number of long frames received by each physical port;
D) the number of packets received by each physical port;
E) the number of bytes sent and received by each physical port.
6.5.3.2 Acquisition of performance data
The ability to collect the transmission performance data, including the selected performance data, set the task acquisition start time and knot
Bundle time, add and delete collection tasks.
6.5.3.3 Management of performance data
The network management platform should be able to save the collected performance data and display it in intuitive form such as text, reports and graphics;
But also a variety of performance data query and analysis, to determine the performance of the system.
6.6 Security Management Center
6.6.1 User Management
Security management center management of the users, including network management systems and application system administrator account, and security equipment
The account of the administrator. Management of the main functions of the user to add, delete users, permissions settings, user information query, modify and
audit.
6.6.2 Log Management
A log is a record of a network device login, a variety of operation commands, and a devic...
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of HJ 725-2014_English be delivered?Answer: Upon your order, we will start to translate HJ 725-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of HJ 725-2014_English with my colleagues?Answer: Yes. The purchased PDF of HJ 725-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|