HJ 552-2010 English PDF

HJ 552-2010_English: PDF (HJ552-2010)
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
HJ 552-2010English659 Add to Cart 5 days [Need to translate] Technical guidelines for environmental protection in highway projects for check and accept of completed construction project Valid HJ 552-2010


BASIC DATA
Standard ID HJ 552-2010 (HJ552-2010)
Description (Translated English) Technical guidelines for environmental protection in highway projects for check and accept of completed construction project
Sector / Industry Environmental Protection Industry Standard
Classification of Chinese Standard Z00
Classification of International Standard 13.020
Word Count Estimation 25,276
Date of Issue 2010-01-06
Date of Implementation 2010-04-01
Quoted Standard GB 3095; GB 3096; GB 5468; GB 16297; GB 13271; HJ/T 2.1; HJ 2.2; HJ/T 2.3; HJ/T 2.4; HJ/T 19; HJ/T 90; HJ/T 91; HJ/T 394
Drafting Organization Ministry of Transportation Highway Research Institute
Administrative Organization Ministry of Environment Protection
Regulation (derived from) Department of Environmental Protection Notice 2010 No. 3
Summary This standard specifies the highway and acceptance of completed construction projects investigating the overall requirements, implementation plans and report preparation requirements. This standard applies to the required preparation of " acceptance of completed construction projects report" highway construction projects Environmental Protection Acceptance Check investigation. Need to fill out the " acceptance of completed construction projects questionnaire" highway construction project can be implemented by reference.

Standards related to: HJ 552-2010

HJ 552-2010
Technical guidelines for environmental protection in highway projects for check and accept of completed construction project
People's Republic of China National Environmental Protection Standards
Issued on.2010-01-06
2010-04-01 implementation
Issued by the Ministry of Environmental Protection
People's Republic of China Ministry of Environmental Protection
announcement
No. 3 2010
To implement the "People's Republic of China Environmental Protection Law" and "People's Republic of China Environmental Impact Assessment Law," to protect the environment, norms and
Guidance acceptance of completed construction projects, which are now approved "Construction Project Environmental Protection acceptance of technical specifications road" for the country ring
Environmental protection standards and to publish.
Standard name, numbered as follows.
The standard since April 1, 2010 implementation, published by the China Environmental Science Press, standard content in website of the Ministry of Environmental Protection
Special announcement.
January 6, 2010
Table of Contents
Preface ..iv
1. Scope ..1
2 Normative references ..1
3 Terms and Definitions .1
4 .2 General
5 Acceptance preparation stage technical requirements .. 3
6 Acceptance Survey Technical Requirements .4
7 Completion of Environmental site inspection .11
Format and content of Appendix A (normative) embodiments .12
Appendix B (normative) investigation report format and content of .15
Format and content of Appendix C (informative) public opinion survey table ..19
iv
Foreword
For the implementation of the "People's Republic of China Environmental Protection Law", "People's Republic of China on Environmental Impact Assessment", "construction project environmental protection
Protection regulations, "the implementation of" acceptance of completed construction projects management approach "to regulate the Highway Construction Project Environmental Protection acceptance,
Development of this standard.
The Standard Appendix A, Appendix B is normative appendix, Appendix C is informative appendix.
This standard is the first release.
This standard is developed by the Ministry of Environmental Protection Science, Technology organization.
This standard was drafted. Ministry of Communications Highway Research Institute.
This standard MEP January 6, 2010 for approval.
This standard since April 1, 2010 implementation.
The standard explanation by the Ministry of Environmental Protection.
Construction Project Environmental Protection Acceptance of Highway
1 Scope
This standard specifies the Highway Construction Project Environmental Protection acceptance of the general requirements of the investigation, the preparation of the program and requires the implementation of the investigation report.
This standard applies to the completion of the preparation of environmental protection according to the provisions "of completed construction projects and acceptance report" highway construction project
Acceptance investigation. Need to fill out the "acceptance of completed construction projects questionnaire" road construction project can be implemented by reference.
2 Normative references
This standard references the following documents or the terms. For undated references, the effective version applies to this standard.
GB 3095 Ambient Air Quality Standard
GB 3096 acoustic environment quality standards
GB 5468 boiler soot test methods
GB 16297 Air Pollutant Emission Standards
GB 13271 boiler air pollutant emission standards
HJ/T 2.1 Environmental Impact Assessment Technology Guidelines Master
HJ 2.2 Technical Guidelines for Environmental Impact Assessment of Atmospheric Environment
HJ/T 2.3 Environmental Impact Assessment Technology Guidelines surface water
HJ/T 2.4 Environmental Impact Assessment Technology Guidelines make a sound environment
HJ/T 19 Environmental Impact Assessment Technology Guidelines non-polluting ecological impact
HJ/T 90 sound barriers acoustic design and measurement specifications
HJ/T 91 surface water and wastewater monitoring technical specifications
HJ/T 394 Construction Project Environmental Protection acceptance for ecological impact category
3 Terms and Definitions
The following terms and definitions apply to this standard.
3.1 acoustic environment sensitive points environmental sensitive sites
Along both sides of the road refers to a range of hospitals, schools, institutions, research institutes, residential, nursing homes need to keep quiet field
The.
3.2 environmentally sensitive sections of the environmental sensitive sections
Refers Highway crossing acoustic environment sensitive points are concentrated, ecologically sensitive area of the road, including water source protection areas, scenic spots, natural
Protected areas, forest parks, etc., require special protection areas, including natural wetland habitats of rare or special habitats, natural forests,
Ecologically sensitive and fragile area, including a tropical rain forest, including densely populated areas such as culture and education, including the area of social concern.
3.3 Vehicle Classification vehicle classify
Cars usually divided according to the total mass of small, medium and large are three small cars mean total vehicle mass 2 t or less (including 2 t) or seat
Less than 7 (including 7) cars, midsize cars means the total mass of 2 ~ 5 t (including 5 t) or 8 to 19 seats (with eight) cars,
Large car means a total vehicle mass greater than 5 t or more than 19 seats (including 19) vehicles, including container trucks, trailers, construction vehicles and the like.
4 General
Basic requirements 4.1 Acceptance investigation
4.1.1 to prepare an environmental impact report on the road construction project should be prepared and acceptance of completed construction projects Survey.
4.1.2 the preparation of environmental impact statement for highway construction projects should be prepared and acceptance of completed construction projects questionnaire.
4.1.3 Highway Construction Project Environmental Protection acceptance survey shall comply with this standard, it should also meet the current national mandatory standards
Provisions.
Highway Construction Project 4.1.4 Acceptance of the investigation according to the actual traffic investigation, indicate the actual traffic volume. It does not reach 75% of the volume of traffic forecast
When the deal with the medium-term forecast traffic volume to be checked, according to the medium-term forecast traffic check on the main environmental protection measures be reviewed. In commissioning
Camp of the environmental protection measures taken according to monitoring results, and reserve management budget.
4.1.5 staging construction and operational stages of road construction projects should be carried out in stages acceptance investigation.
4.2 Acceptance investigation procedures
Highway construction project acceptance procedures with reference to the investigation of HJ/T 394 work in program execution.
4.3 Acceptance period and scope of the investigation
4.3.1 According to the characteristics of highway construction projects, acceptance into the design of the survey period, the construction period, the trial operation of the three periods.
4.3.2 Acceptance of the scope of investigation in principle consistent with the scope of the evaluation of environmental impact assessment documents; when the actual project construction content changes or ring
When the environmental impact assessment document failed to fully reflect the actual ecological impacts of project construction and other environmental impacts, the project should be based on actual and real change
Inter environmental impact, combined with on-site reconnaissance survey on appropriate adjustments.
4.4 Acceptance investigation focused
4.4.1 Design of
a) verification of the actual project content, design programs to change the situation of environmental protection facilities and programs designed to change the situation.
b) Change in environmental impact assessment document comparison construction projects, survey acoustic environment sensitive points change and other environmental sensitive targets.
c) Change contrast construction project engineering design and content, the survey acoustic environment sensitive points change and other environmental sensitive targets
To change the situation.
d) whether the works clearly significant engineering changes, compliance with environmental protection acceptance criteria.
4.4.2 Construction Period
a) environmental impact assessment system and other relevant environmental protection laws and regulations implementation.
b) reference to the construction project environmental impact assessment documents related to the prediction of environmental impact, environmental impact survey of the construction actually produced, indeed
Given the extent of the impact and scope.
c) investigate the environmental impact assessment documents and environmental impacts of the implementation of security and approval documents submitted with the requirements on environmental protection facilities
Protection effect.
d) relates to nature reserves, scenic spots, drinking water source protection areas, cultural relics protection units and other environmentally sensitive targets, should be investigated
The implementation of the relevant administrative departments for the protection requirements.
e) investigation unit construction environmental management conditions, environmental monitoring systems and environmental supervision of the implementation of the requirements.
f) environmental protection project investment.
4.4.3 trial operation period
a) the effect of the implementation of environmental protection measures and investigation based on the actual environmental impact of the construction unit and taken to investigate the trial operation of environmental risk source,
Environmental risk prevention and the implementation of emergency measures.
b) investigate the actual trial operation of environmental problems, reflecting the strong public and environmental issues need to be further improved, the quality of the environment
Protection.
4.5 Acceptance standard investigation
Adopted by the administrative department of environmental protection of highway construction project environmental impact assessment document submitted to confirm the principle of environmental protection marked 4.5.1
Quasi-acceptance of the amendments have been enacted new environmental standards after acceptance shall make recommendations to the new standard compliance assessment.
4.5.2 Acceptance investigation to determine the standard principles
a) environmental impact assessment documents for approval and environmental impact of its provisions in the document are clearly defined as acceptance criteria.
b) environmental impact assessment documents and approval of the environmental impact document did not clearly defined, according to the current whereabouts of actual emissions of pollutants
Environmental standards as acceptance criteria; existing environmental standards not included in the index, refer to industry standards or other relevant standards for
The acceptance criteria.
c) the existing environmental standards and other standards are not included in the index, according to the actual investigation shows the results.
4.6 Acceptance of the principles and methods of investigation
4.6.1 Acceptance of the general principles of investigation
a) investigation, monitoring methods shall comply with relevant national regulatory requirements.
b) make full use of existing data, and with field reconnaissance, site investigation, monitoring of the status quo combined.
c) the design phase, construction phase, the trial operation of the whole process of the investigation, according to the characteristics of the project, focused, both in general.
4.6.2 Acceptance Survey Methods
Should adopt research data, field survey and monitoring of the status quo combination of approaches, and make full use of advanced technological means and methods, reference may be
HJ/T 2.1, HJ 2.2, HJ/T 2.3, HJ/T 2.4, HJ/T 19, HJ/T 90, HJ/T 394 and other relevant standards.
5 Acceptance technical requirements preparation phase
5.1 Data Collection
5.1.1 Environmental Impact Assessment and approval documents
a) construction project environmental impact assessment document.
b) the administrative department of environmental protection impact assessment document approval of the views of the construction project environment; industry department in charge of construction projects, environmental
Pre-trial opinion environmental impact assessment documents; construction project site environmental protection administrative department review comments on the environmental impact assessment document.
5.1.2 Engineering information and approval documents
a) the project feasibility study, preliminary design and other related design documents.
b) the implementation of the project environmental supervision program, soil and water conservation programs, heritage reconnaissance reports.
Begins the report c) projects.
Construction Supervision report or related transcript d) project.
Post e) project (Jun) workers acceptance summary information.
f) projects relating to the contract, the compensation agreement as farmland, ecological restoration project contracts, commission processing related waste water, emissions, noise
Documents and contracts.
g) the project has been the construction and trial operation of on-site monitoring data (including environmental quality monitoring and water and soil conservation monitoring data, etc.).
h) project environmental management agencies, personnel, establishment and implementation of system information.
i) the status quo since road traffic since trial operation.
j) transport of dangerous goods emergency response system.
k) relevant regulatory requirements, such as the relevant planning.
l) and various other basic information for approval documents. Project approval, preliminary design approval, permission to start the file, Soil and Water Conservation approval documents
Etc; content protection environment function zoning, scenic spots, nature reserves, monuments and other environmentally sensitive targets, and the appropriate level of protection
Allows management through license files; construction projects and environmental protection facilities design and construction changes and their respective approval procedures
And approval document; all kinds of maps related information.
5.2 site visit
5.2.1 The purpose of the site visit
Through the construction project and its main project supporting the construction of environmental protection facilities and the environmental protection measures in the field of verification, knot
Closing the investigation focused on the development of targeted acceptance surveys and monitoring programs.
5.2.2 content site visit
a) verification of engineering and technical documents, accuracy of information, including the completion of the main project and change the situation.
b) On the basis of the collection, research and access to the data on construction projects for the construction of the content, the measures of environmental protection facilities and on-site adjustment
check. The implementation of environmental protection facilities and measures to verify the environmental impact assessment document approval and documentation requirements, circumstances change, such as sound barrier, separated
Acoustic window position, boiler pollution control measures, waste water treatment facilities, distribution and quantity of dangerous goods and emergency treatment measures.
Case c) Survey Project on regional environmental sensitive targets, including the number, type, distribution, and alteration of, protection measures
Its effect is applied. Clearly the relative position of its geographical location, size, and engineering, the environment functional areas and protected content with the environment Movies
Changes and reasons for changes impact assessment document comparison.
d) transport of dangerous goods accident prevention, emergency measures surveys.
e) Social Impact Survey (passengers and for passing along the highway affected public issuance of public participation questionnaire).
f) visited the local environmental protection authorities, forestry authorities and other relevant authorities to understand the impact of verifying whether the presence along the highway
Significant environmental problems, as well as comments on the above-mentioned road sector and other environmental work.
6 Acceptance Survey Technical Requirements
6.1 Engineering Investigation
6.1.1 construction process investigation
Project file checks project feasibility study report and the integrity and approval procedures, approval and project approval authority unit investment regulations
Mold compliance; check whether the construction project in accordance with relevant state regulations were project approval; check project feasibility study stage
No required environmental impact assessment system undertaken an environmental impact assessment.
It should brief description of each project to the construction phase of the trial operation of the whole process. Described the project in time and approval department; project feasibility study,
Prepared preliminary design completion time and approval department, approved the content and approval time; project environmental impact assessment documentation unit,
Completion and approval departments, content approval and approval time; given the comments and industry department Area of the environmental authorities
Pre-trial opinion, the examination and approval department and time; project construction time, completion time, put into trial operation time.
6.1.2 Project Overview Survey
Location clear highway construction projects, project components, project size, engineering, traffic, major economic or technical indicators (should
Environmental impact assessment, design and delivery (Jun) workers acceptance index value comparison explained), environmental protection facilities, the total project investment, real
International environmental protection investment. For renovation and expansion projects, renovation and expansion of the content should be given.
6.1.3 Project Verification
Changes (including environmental protection engineering change) occurs when the construction process, given the actual engineering design and engineering controls, changes
List, explain the specific changes, reasons and circumstances.
6.1.4 Traffic Survey
Description Environmental impact assessment document predicted traffic volume; the actual road traffic survey trial operation period.
6.1.5 provide appropriate proportion of project location map and road engineering to map, process flow diagram of environmental protection facilities, environmental protection facilities
The arrangement of FIG.
6.2 Environmental impact assessment document review and approval documents
6.2.1 review the environmental impact assessment document should clearly explain the main elements of the environmental impact, environmentally sensitive targets, environmental impact prediction results,
Environmental protection measures and recommendations of evaluation findings.
6.2.2 Description of environmental impact assessment document approval and completion time, the environmental impact of the requirements outlined in the document presented for approval.
The implementation of environmental protection measures 6.3 Investigation
Environmental protection measures for the implementation of the environmental impact assessment and approval of documents required to be described in the survey project design,
The effectiveness of environmental protection measures to control ecological impact, pollution and social impact of construction, trial operation stage taken taken necessary
Put forward practical corrective measures.
6.4 Ecological Impact Survey
6.4.1 survey
Ecological environmental impact survey in principle consistent with the scope of the evaluation.
6.4.2 Survey Methods
Ecological environmental impact survey for different periods, different surveys factor or content to take a different survey methods, including financing documents
Material verification (or research), site survey, public opinion surveys, ecological remote sensing survey to assess the theoretical analysis and other technical means and methods.
6.4.3 focus of investigation
a) project covering the case.
Ecological function or b) engineering disturbed land (mainly referring to the temporary land occupation, construction of roads, etc.) recovery.
c) soil and water conservation work.
Protective measures d) Project on the national or local protection, habitat, affecting wildlife and wildlife passage, and take
Protective effect.
Effect e) project on the ecological sensitive targets nature reserves, scenic spots, etc. involved, to take protective measures and protective effect;
Project on wetland hydrological environment.
6.4.4 main ecological survey indicators
a) permanent land. an area including type, area, focusing on farmland, number of forest and grassland.
b) temporary land occupation include. the number of access roads, stations, camps and other construction, rehabilitation measures and recovery effects.
c) to take, spoil (residue) fields include. taking the position spoil (slag) field, covers an area of type, quantity of earth, and the public
Distance road, rehabilitation and recovery measures taken effect; take instructions, spoil (slag) field and the environmental impact assessment document actually set is determined
Take, spoil (slag) field changes and reasonable.
d) engineering and erosion protection. Includes the ma......
...