HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

HG/T 20680-2011 English PDF

HG/T 20680: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
HG/T 20680-2011EnglishRFQ ASK 3 days [Need to translate] Code for process calculation of boiler plant design Valid HG/T 20680-2011
HG/T 20680-1990EnglishRFQ ASK 11 days [Need to translate] (Chemical companies boiler room design and calculation requirements) Obsolete HG/T 20680-1990

PDF similar to HG/T 20680-2011


Standard similar to HG/T 20680-2011

GB/T 17519   HG/T 3811   GB/Z 20288   HG/T 20644   HG/T 20272   HG/T 20678   

Basic data

Standard ID HG/T 20680-2011 (HG/T20680-2011)
Description (Translated English) Code for process calculation of boiler plant design
Sector / Industry Chemical Industry Standard (Recommended)
Classification of Chinese Standard G04
Classification of International Standard 71.010
Word Count Estimation 179,178
Date of Issue 2011-05-18
Date of Implementation 2011-08-01
Older Standard (superseded by this standard) HG/T 20680-1990
Regulation (derived from) Ministry of Industry and Information Technology Bulletin No. 13 of 2011
Issuing agency(ies) Ministry of Industry and Information Technology
Summary This standard specifies the boiler room in the process usually involves project design, requirements, basic formulas, methods, and should be based on the information and other related requirements. This requirement applies to the rated boiler steam pressure of not more than 9. 81MPa, rated steam temperature of not more than 540��C of coal, oil, natural gas and coal as fuel for industrial, civil and corporate-owned boiler room and the medium and small power plant (station) in processes associated with the boiler design calculations. For the expansion, renovation and boiler room, a small power plant (station), may refer to the regulations. This provision is based on national regulations and standards, combined with industrial boilers and small boilers with 10 years of practice, for the preparation of operating experience.