US$299.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GBZ32519.2-2016: 1 000 MW class hydro-generators -- Part 2: Testing and inspecting guide Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/Z 32519.2-2016 | English | 299 |
Add to Cart
|
3 days [Need to translate]
|
1 000 MW class hydro-generators -- Part 2: Testing and inspecting guide
| Valid |
GB/Z 32519.2-2016
|
PDF similar to GBZ32519.2-2016
Basic data | Standard ID | GB/Z 32519.2-2016 (GB/Z32519.2-2016) | | Description (Translated English) | 1 000 MW class hydro-generators -- Part 2: Testing and inspecting guide | | Sector / Industry | National Standard | | Classification of Chinese Standard | K21 | | Classification of International Standard | 29.160.20 | | Word Count Estimation | 15,160 | | Date of Issue | 2016-02-24 | | Date of Implementation | 2016-09-01 | | Regulation (derived from) | National Standard Announcement No | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China |
GBZ32519.2-2016: 1 000 MW class hydro-generators -- Part 2: Testing and inspecting guide---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
1 000 MW class hydro-generators - Part 2. Testing and inspecting guide
ICS 29.160.20
K21
People's Republic of China national standardization of technical guidance documents
1000MW water turbine generator
Part 2. Tests, Tests and Guidelines
Part 2.Testingandinspectingguide
2016-02-24 Published
2016-09-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Preface Ⅰ
Introduction Ⅱ
1 Scope 1
2 Normative references 1
3 Terms and definitions 2
4 factory inspection test 2
5 transfer test on the scene 6
6 start test run test 8
7 Performance Test 9
8 type test 10
Foreword
GB /Z 32519 "1000MW-class hydro-generator" is divided into the following three parts.
--- Part 1. Technical guidelines;
--- Part 2. Tests, test guidelines;
--- Part 3. Installation of quality inspection guidelines.
This section GB /Z 32519 Part 2.
This instructional document has been drafted in accordance with the rules given in GB/T 1.1-2009.
This guidance document is proposed by China Electrical Equipment Industry Association.
This guidance document is organized by the National Large Scale Generator Standardization Technical Committee (SAC/TC511).
The drafting of the guidance of technical documents. Harbin Institute of Electrical Engineers, Dongfang Electric Group Dongfang Electric Co., Ltd., China Electric Construction
Mission East China Institute of Investigation and Design Co., Ltd., Harbin Electric Works Co., Ltd., China Three Gorges Corporation, China Power Building Group
Beijing Survey and Design Institute Co., Ltd., China Hydropower Engineering Consulting Group Co., Ltd., Yangtze River Design Company, China Electrical Equipment Industry Association.
The main drafters of this technical guidance document. Fu Lixin, Sun Yutian, Tang Min, Li Yuzhen, Gou Zhide, pay Changhong, Zou Zu Bing, Wan Feng Xia,
Li Dingzhong, Wang Shuqing, Chen Hao.
Introduction
Hydropower construction in China's energy development has an important strategic position, plays an important role in the national economy. With the market for power generation
The requirements for the development of high capacity, high parameters, high efficiency and low consumption, safety and environmental protection are continually increasing, and the requirements of the state in the "12th Five-Year Plan"
Indeed proposed to vigorously develop hydropower, China will have a group of 1000MW super-large hydropower unit design and manufacture. To this end has prepared the following series
Standard. "1000MW-class hydro-generator", for hydro-generator, there are GB/T 7894 "hydro-generator basic technical conditions"
GB/T 8564 "Technical Specifications for Installation of Hydro-generating Sets", GB/T 1029 "Three-phase synchronous motor test methods" and related manufacturing, testing, etc.
Standards and norms, but these standards and norms are aimed at the general large and medium-sized hydro-generating units. When the generator stand-alone capacity increased to
At 1000MW level, the operating conditions, performance parameters, overall structure and material application of hydroelectric units will all change greatly. by
The size of the unit, operating conditions, performance parameters have undergone major changes in these existing hydropower national test, the test will not be able to end
All applicable. Therefore, it is necessary to make corresponding researches on the special characteristics of 1000MW generators on the basis of the existing standards and specifications,
And to develop suitable for 1000MW hydropower unit test, inspection standards and norms.
This guidance document is based on the research results and summary of the 1000MW giant vertical hydro-generator in recent years
700MW large-scale vertical hydro-generator test, inspection experience compiled.
The technical specifications not specified in these technical documents shall comply with GB/T 755 "Rotating Electrical Machines, Quotations and Performances", GB/T 7894
"Hydro-generator basic technical conditions" and GB/T 1029 "three-phase synchronous motor test method." If there are special requirements, users and manufacturers can
Specified in a special technical agreement.
1000MW water turbine generator
Part 2. Tests, Tests and Guidelines
1 Scope
The guidance of technical documents on the 1000MW three-phase salient pole synchronous generator (hereinafter referred to hydroelectric generator) test, test applicable
Factory inspection test, on-site handover test, start-up test, performance test and type test.
This Guidance Document is applicable to hydroelectric generators of 800 MW and above.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB 755 Rotating electrical machinery quota and performance (GB 755-2008, IEC 60034-1.2004, IDT)
GB/T 1029 three-phase synchronous motor test method
GB/T 2521 cold-rolled oriented and non-oriented electrical steel strip (film)
GB/T 2900.25 Electrotechnical terminology rotary motor (GB/T 2900.25-2008, IEC 60050-411.1996, IDT)
GB/T 5321 calorimeter determination of large AC motor loss and efficiency
GB/T 5843 flange coupling
GB/T 6075.5 Measurement and evaluation of mechanical vibration of a unit on non-rotating parts - Part 5 Hydraulic power plant and pumping station unit
GB/T 7894 hydroelectric generator basic technical conditions
GB/T 8564 turbine generator installation technical specifications
GB/T 10069.1 rotary motor noise measurement methods and limits - Part 1. Rotor electrical noise measurement method (GB/T 10069.1-
2006, ISO 1680.1999, MOD)
GB/T 11348.5 Rotating Machinery - Measurement and Evaluation of Radial Vibration of Shafts - Part 5. Hydroelectric Power Plants and Pumping Station Units
GB/T 13394 Electrotechnical rotary motors with letter symbols symbols
GB/T 14298 indexable spiral end mill
GB/T 20160 rotating motor insulation resistance test
GB/T 20833 generator stator bars and windings off-line partial discharge measurement methods and evaluation guidelines
GB/T 20835 generator stator core magnetization test guidelines
GB 50150 electrical installations installation of electrical equipment handover test standards
GB/T 32519.1 1000MW turbine generator Part 1. Technical Guidance
DL/T 298 Generator stator winding end corona detection and evaluation guidelines
DL/T 330 Water conservancy and hydropower projects metal structures and equipment welded joints diffraction time difference method ultrasonic testing
DL/T 507 hydro-generator set to start the test procedures
DL/T 1067 evaporative cooling hydro-generator (power generation/motor) basic technical conditions
JB/T 3334.1 Hydro-generator brakes - Part 1. Vertical brakes for hydroelectric generators
JB/T 6204 large high voltage AC motor stator insulation voltage withstand test specification
JB/T 7356 tube oil cooler
JB/T 7608 high voltage AC motor winding dielectric loss tangent test methods and limits
NB/T 42003 high voltage motor core punching insulation test method
NB/T 42004 high voltage AC stator stator coil insulation aging test method
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GBZ32519.2-2016_English be delivered?Answer: Upon your order, we will start to translate GBZ32519.2-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GBZ32519.2-2016_English with my colleagues?Answer: Yes. The purchased PDF of GBZ32519.2-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|