|
US$379.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GBZ32519.1-2016: 1 000 MW class hydro-generator -- Part 1: Technical guide Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/Z 32519.1-2016 | English | 379 |
Add to Cart
|
4 days [Need to translate]
|
1 000 MW class hydro-generator -- Part 1: Technical guide
| Valid |
GB/Z 32519.1-2016
|
PDF similar to GBZ32519.1-2016
Basic data | Standard ID | GB/Z 32519.1-2016 (GB/Z32519.1-2016) | | Description (Translated English) | 1 000 MW class hydro-generator -- Part 1: Technical guide | | Sector / Industry | National Standard | | Classification of Chinese Standard | K20 | | Classification of International Standard | 29.160.20 | | Word Count Estimation | 19,181 | | Date of Issue | 2016-02-24 | | Date of Implementation | 2016-09-01 | | Regulation (derived from) | National Standard Announcement No | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China |
GBZ32519.1-2016: 1 000 MW class hydro-generator -- Part 1: Technical guide---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
1 000 MW class hydro-generator - Part 1. Technical guide
ICS 29.160.20
K20
People's Republic of China national standardization of technical guidance documents
1000MW water turbine generator
Part 1. Technical guidelines
2016-02-24 Published
2016-09-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Foreword Ⅲ
Introduction IV
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 use of environmental conditions 1
5 Ratings and parameters 2
6 temperature and temperature 3
7 operating characteristics and electrical connections 3
8 Insulation properties and withstand voltage test 4
Mechanical properties 6
Main structural components allowable stress
Basic requirements of structure 10
Ventilation and cooling system
Braking system
Fire Extinguishing System
Monitoring Systems and Devices and Components 11
16 excitation system 11
17 Scope of delivery 12
18 logo, packaging, transportation and custody 12
19 factory and field test 12
20 trial run and guarantee period 12
Foreword
GB /Z 32519 "1000MW-class hydro-generator" is divided into the following three parts.
--- Part 1. Technical guidelines;
--- Part 2. Tests, test guidelines;
--- Part 3. Installation of quality inspection guidelines.
This section GB /Z 32519 Part 1.
This instructional document has been drafted in accordance with the rules given in GB/T 1.1-2009.
This guidance document is proposed by China Electrical Equipment Industry Association.
This guidance document is organized by the National Large Scale Generator Standardization Technical Committee (SAC/TC511).
The drafting of the guidance of technical documents. Harbin Electric Works Co., Ltd., China Construction Group Beijing Institute of Survey and Design Limited
Company, Harbin Institute of Electrical Engineers, China Hydropower Engineering Consulting Group Co., Ltd., Dongfang Electric Group Dongfang Electric Co., Ltd., State Water
Power Generation Engineering Research Center, the Yangtze River Design Company, China Construction Group East China Survey and Design Institute Co., Ltd., China Electric
Industry Association, China Three Gorges Corporation.
The main drafters of this technical paper, Wang Yanlu, Wan Fengxia, Sun Yutian, Zhou Bo, Li Dingzhong, Zheng Xiaokang, Fu Changhong, Ming Ye,
Wang Shuqing, Li Yuzhen, Liu Yali, Zou Zu Bing.
Introduction
Hydropower construction in China's energy development has an important strategic position, plays an important role in the national economy. With the market for power generation
The requirements for the development of high capacity, high parameters, high efficiency and low consumption, safety and environmental protection are continually increasing, and the requirements of the state in the "12th Five-Year Plan"
Indeed proposed to vigorously develop hydropower, China will have a group of 1000MW super-large hydropower unit design and manufacture. To this end has prepared the following series
Standard. "1000MW-class hydro-generator", for hydro-generator, there are GB/T 7894 "hydro-generator basic technical conditions"
GB/T 8564 "Technical Specifications for Installation of Hydro-generating Sets", GB/T 1029 "Three-phase synchronous motor test methods" and related manufacturing, testing, etc.
Aspects of standards and norms. When the single generator capacity increases to 1000MW, the operating conditions of hydropower units, performance parameters, overall
Structural and material applications will change. Due to the size of the unit, operating conditions, performance parameters have undergone major changes, these are current
Of the hydropower unit national design, manufacture, installation, inspection standards will not be fully applicable. Therefore, based on the existing standards and norms,
1000MW-class generators related to the special characteristics of the corresponding research, and developed for the 1000MW-class hydropower unit design, system
Made, installed, inspection standards and specifications.
This guidance document is based on the research results and summary of the 1000MW giant vertical hydro-generator in recent years
700MW large-scale vertical hydro-generator design, manufacture, installation, inspection, operating experience compiled, is 1000MW-class hydro-generator
Guidance documents related to technical work.
1000MW water turbine generator
Part 1. Technical guidelines
1 Scope
This Guidance Document specifies the main technologies of a 1000 MW three-phase salient pole synchronous hydrogenerator (hereinafter referred to as hydrogenerator)
Surgical parameters and performance requirements, the overall structure design, the main components of the structure, material selection principles, work stress and evaluation criteria.
This Guidance Document is applicable to three-phase salient pole synchronous hydrogenerators of 800 MW and above.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
Rotating electrical machinery quota and performance GB 755-2008
GB/T 1408.1 Insulating material Electrical strength test methods Part 1
GB/T 2900.25 Electrotechnical terminology rotary motor
GB/T 5321 calorimeter Determination of motor loss and efficiency (GB/T 5321-2005, IEC 60034-2A.1974, IDT)
GB/T 7409.3 synchronous motor excitation system Large and medium synchronous generator excitation system technical requirements
Basic technical requirements of hydroelectric generators GB/T 7894-2009
GB/T 13394 Electrotechnical rotary motors with letter symbols symbols
GB/T 28570 turbine generator online monitoring system Technical Guidelines
Turbine generators of 1000 MW class - Part 2. Guidelines for testing and inspection GB/T
Preventive test code for power equipment
DL/T 1067 evaporative cooling hydro-generator (power generation/motor) basic technical conditions
IEEE1043-1996 (R2009) forming rod and coil electrical aging test Recommended Practice (RecommendedPracticefor
Voltage-Endurance Test of form-WoundBars and Coil)
IEEE1310-2012 large rotating electrical machine stator bar and coil thermal cycle test Recommended Practice (Recommended
PracticeforThermalCycleTestingofForm-WoundStatorBarsandCoilforLargeRotatingMa-
chines
IEEE1553-2002 (R2007) hydroelectric generator forming coil and bar electrical aging test standard (StandardforVoltage-En-
duranceTestingofForm-WoundCoilsandBarsforHydrogenerators)
3 Terms and definitions
The terms and definitions used in this guidance document are found in the relevant standards such as GB 755-2008 and GB/T 2900.25. Commonly used things
Quantitative symbols see GB/T 13394.
4 use of environmental conditions
Turbine generator operating conditions should meet the GB/T 7894-2009 Chapter 4 requirements.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GBZ32519.1-2016_English be delivered?Answer: Upon your order, we will start to translate GBZ32519.1-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GBZ32519.1-2016_English with my colleagues?Answer: Yes. The purchased PDF of GBZ32519.1-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|