HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (25 Oct 2025)

GB/T 9224-2025 English PDF

US$289.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 9224-2025: DC periodmeters
Status: Valid

GB/T 9224: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 9224-2025English289 Add to Cart 3 days [Need to translate] DC periodmeters Valid GB/T 9224-2025
GB/T 9224-1998English349 Add to Cart 3 days [Need to translate] D.C.Periodmeters   GB/T 9224-1998
GB/T 9224-1988EnglishRFQ ASK 3 days [Need to translate] D. C. periodmeters-characteristics and test methods Obsolete GB/T 9224-1988

PDF similar to GB/T 9224-2025


Standard similar to GB/T 9224-2025

GB/T 13286   NB/T 20149   NB/T 20019   GB/T 13627   GB/T 15474   

Basic data

Standard ID GB/T 9224-2025 (GB/T9224-2025)
Description (Translated English) DC periodmeters
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F82
Classification of International Standard 27.120.20
Word Count Estimation 14,177
Date of Issue 2025-08-01
Date of Implementation 2026-02-01
Older Standard (superseded by this standard) GB/T 9224-1998
Issuing agency(ies) State Administration for Market Regulation, Standardization Administration of China

GB/T 9224-2025: DC periodmeters

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT9224-2025
ICS 27.120.20 CCSF82 National Standard of the People's Republic of China Replaces GB/T 9224-1998 DC period meter Released on August 1, 2025 Implementation on February 1, 2026 State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Technical Requirements 1 4.1 Appearance and mechanical characteristics 1 4.2 Measuring range 2 4.3 Measurement Error 2 4.4 Response Time 2 4.5 “Zero Point” (Corresponding to Period ∞) Swing 2 4.6 Environmental Adaptability 2 4.7 Stability 3 4.8 Electrical Safety 3 4.9 Electromagnetic Compatibility 3 5 Test Method 3 5.1 General provisions of the test 3 5.2 Appearance and mechanical properties 4 5.3 Measuring range and measurement error 4 5.4 Response Time 4 5.5 “Zero Point” (Corresponding to Period ∞) Swing 4 5.6 Environmental adaptability 5 5.7 Stability 6 5.8 Electrical Safety 6 5.9 Electromagnetic Compatibility 6 6 Inspection Rules 6 6.1 Factory Inspection 6 6.2 Type inspection 6 7 Marking, packaging, transportation, storage 7 7.1 Signs 7 7.2 Packaging 8 7.3 Transportation and storage 8 References 9 Preface This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document replaces GB/T 9224-1998 “DC periodometer”. Compared with GB/T 9224-1998, except for structural adjustments and editorial changes, In addition to the dynamic, the main technical changes are as follows. --- Added the terms and definitions of full-scale value (see 3.3); --- Changed the measuring range (see 4.2, 4.3.1 of the.1998 edition); --- Changed the description of the error (see 4.3, 4.3.2 of the.1998 edition); --- Deleted the adaptability requirements for power supply changes (see 4.4.4 and 4.4.5 of the.1998 edition); --- Changed the range of relative humidity (see 4.6.1, 5.5.3 of the.1998 edition); --- Deleted the extreme operating temperature requirements (see 4.1, 4.4.1.2, 4.4.2.2, 5.5.1.2, 5.5.2.2 of the.1998 edition); --- Added transportation requirements (see 4.6.2, 5.6.2); --- Changed the stability requirements (see 4.7, 4.5 of the.1998 edition); --- Changed the electrical safety requirements (see 4.8, 4.6 of the.1998 edition); --- Deleted the packaging technical requirements (see 4.8 of the.1998 edition); --- Added standard test conditions (see 5.1.1); --- Changed the measurement error test method (see 5.3, 5.4.1 of the.1998 edition); --- Changed the environmental adaptability test method (see 5.6, 5.5 of the.1998 edition); --- Changed the stability test method (see 5.7, 5.6 of the.1998 edition); --- Changed the electrical safety test method (see 5.8, 5.7 of the.1998 edition); --- Replaced the industry standard with the normative reference GB/T 191 (see Chapter 7, 4.8 and Chapter 7 of the.1998 edition). Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document is proposed and coordinated by the National Technical Committee for Standardization of Nuclear Instruments (SAC/TC30). This document was drafted by. China National Nuclear Corporation Control System Engineering Co., Ltd., China National Nuclear Corporation Strategic Planning Research Institute Co., Ltd., China Nuclear Power Research Institute Design Institute, Tsinghua University, China Nuclear Power Engineering Co., Ltd., CNNC Zhangzhou Energy Co., Ltd., and Chengdu University of Technology. The main drafters of this document are. Guo Guanglei, Zhang Weijun, Zhang Dong, Li Baocheng, Li Tiezhu, Gao Zhiyu, Yang Kang, Gong Hui, Lu Weiwei, Cheng Yi, Li Han, Sun Qi, Zheng Hao, Cai Wen, Jing Yang, Wang Mingzhu, Wu Cengceng, and Tong Yansong. The previous versions of this document and the documents it replaces are as follows. --- First issued as GB/T 9224-1988 in 1988, first revised in.1998; ---This is the second revision. DC period meter 1 Scope This document specifies the technical requirements, inspection rules, marking, packaging, transportation and storage requirements for DC cycle meters for nuclear reactors. The corresponding test methods. This document applies to the production, inspection and sales of DC periodometers for nuclear reactor measurements. 2 Normative references The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 191 Pictorial markings for packaging, storage and transportation GB/T 2423.56 Environmental testing Part 2.Test methods Test Fh. Broadband random vibration and guidance GB/T 8993 Environmental conditions and test methods for nuclear instruments GB/T 11684 Electromagnetic environmental conditions and test methods for nuclear instruments GB/T 13306 Signage GB/T 13384 General technical requirements for packaging of electromechanical products GB/T 19661.1 Safety requirements for nuclear instruments and systems Part 1.General requirements 3 Terms and Definitions The following terms and definitions apply to this document. 3.1 DC period meter A device that measures the time constant of an exponentially varying DC current. Note. The output signal is a voltage signal, proportional to the inverse of the time constant (hereinafter referred to as the period). The proportional relationship is specified by the manufacturer. 3.2 response time The time required for the output signal to reach 90% of its final value for the first time after an exponentially changing DC current is input. 3.3 Full scale value The output voltage signal corresponding to the reciprocal of the absolute value of the shortest period within the measurement range. 4 Technical Requirements 4.1 Appearance and mechanical properties The exterior and mechanics include the following features. a) The surface coating of the instrument should be firm and smooth, without defects such as rust, cracks, and peeling; b) The writing on the nameplate and panel should be clear;

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 9224-2025_English be delivered?

Answer: Upon your order, we will start to translate GB/T 9224-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 9224-2025_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 9224-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 9224-2025?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 9224-2025 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.