US$509.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 9109.3-2014: Dynamic measurement of petroleum and liquid petroleum products -- Part 3: Technical requirements of installation for pipe prover Status: Valid GB/T 9109.3: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 9109.3-2014 | English | 509 |
Add to Cart
|
4 days [Need to translate]
|
Dynamic measurement of petroleum and liquid petroleum products -- Part 3: Technical requirements of installation for pipe prover
| Valid |
GB/T 9109.3-2014
|
| GB/T 9109.3-1988 | English | 479 |
Add to Cart
|
4 days [Need to translate]
|
Dynamic measurement of crude oil--The technical stipulations of installation for fixed pipe provers
| Obsolete |
GB/T 9109.3-1988
|
PDF similar to GB/T 9109.3-2014
Basic data | Standard ID | GB/T 9109.3-2014 (GB/T9109.3-2014) | | Description (Translated English) | Dynamic measurement of petroleum and liquid petroleum products -- Part 3: Technical requirements of installation for pipe prover | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | E98 | | Classification of International Standard | 75.180.30 | | Word Count Estimation | 22,298 | | Date of Issue | 2/19/2014 | | Date of Implementation | 6/1/2014 | | Older Standard (superseded by this standard) | GB/T 9109.3-1988 | | Quoted Standard | GB/T 9109.1; GB/T 17286.2; GB 50093; GB 50231; GB 50235; GB 50253; GB 50275 | | Regulation (derived from) | National Standard Announcement 2014 No. 2 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This Standard specifies the design of oil and liquid petroleum products dynamic measurement volume pipe system design, installation, construction and acceptance of technical requirements. This Standard applies to the volume of the tube to the oil and liqu |
GB/T 9109.3-2014: Dynamic measurement of petroleum and liquid petroleum products -- Part 3: Technical requirements of installation for pipe prover ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Dynamic measurement of petroleum and liquid petroleum products Part 3. Technical requirements of installation for pipe prover
ICS 75.180.30
E98
National Standards of People's Republic of China
Replacing GB/T 9109.3-1988
Petroleum and liquid petroleum products - Dynamic measurement
Part 3. Volume tube mounting technical requirements
Part 3. Technicalrequirementsofinstalationforpipeprover
Issued on. 2014-02-19
2014-06-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 General requirements 1
4 System 1
4.1 Prover Selection 1
Design 4.2 Volume 2 pipe system
4.3 Design of water flooding method Verification System 4
4.4 Auxiliary system design 5
5 Installation 6
5.1 Preparation before installation volume tube 6
5.2 Installation of the volume of the tube body 8
5.3 volume of hydraulic pipe system installation 8
5.4 water flooding method verification system, auxiliary system installation 8
5.5 instrumentation and control system installation 8
5.6 Pressure Test 8
5.7 purging and cleaning 8
6 Commissioning 8
Appendix A (normative) prover range selection 10
Appendix B (informative) ultrasonic flowmeter test tube volume value volume recommended 12
Annex C (informative) volume tube mounting Step 13
Foreword
GB/T 9109 is divided into four parts.
--- GB/T 9109.1 Dynamic measurement of crude oil general principles;
--- GB/T 9109.2 Oil and dynamic measurement of liquid petroleum products - Part 2. flowmeter installation technical requirements;
--- GB/T 9109.3 dynamic measurement of oil and liquid petroleum products - Part 3. Volume tube mounting technical requirements;
--- GB/T 9109.5 Petroleum and liquid petroleum products - Calculation of oil dynamic measurement.
This part of GB/T 9109 Part 3.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This Part replaces GB/T 9109.3-1988 "Dynamic measurement of crude oil fixed standard volume tube mounting technical requirements." This portion
GB/T 9109.3-1988 compared to the main changes in the technical content is as follows.
--- The standard name changed to "oil and liquid petroleum products dynamic measurement - Part 3. Volume tube mounting technical requirements";
--- Modify the scope, increase in oil and liquid petroleum products;
--- Modify the standard structure, an increase in Chapter 3;
--- Increasing the density meter tube import volume requirements to install filters;
--- Increase the requirements for the import and export volume of the tube temperature, pressure meter accuracy and installation position;
--- Increasing the volume of the tube outlet is calculated minimum backpressure;
--- Selection requirements increased volume of the tube;
--- Increasing the volume of one-way and two-way volume of tube pipe installation procedures;
--- Remove the imported contents of the installation of a small volume prover.
This part of the National Oil and Gas Standardization Technical Committee (SAC/TC355) and focal points.
This section is drafted. a large national oil and gas flow metering stations.
The main drafters of this section. An Shumin, Zhang Jingang, Gao Jun, Sun Ce, Gao Zhenhua, Zhao Chenghai.
This part of the standard replaces the previous editions are.
--- GB/T 9109.3-1988.
Petroleum and liquid petroleum products - Dynamic measurement
Part 3. Volume tube mounting technical requirements
1 Scope
GB/T 9109 provisions of this part of the design of oil and liquid petroleum products dynamic volume metering pipe system design, installation, construction and acceptance
skills requirement.
This section applies to petroleum and liquid petroleum products as the working medium volume line pipe fixed installation, the central station test tube volume, shift
Acting prover can refer to use.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 9109.1 Dynamic measurement of crude oil general principles
GB/T 17286.2 Liquid hydrocarbons - Dynamic measurement systems for volumetric meters - Part 2. Volume tube
GB 50093 Automation Instrumentation Construction and Quality Acceptance
GB 50231 mechanical equipment installation construction and acceptance of universal norms
GB 50235 industrial metal pipeline construction norms
GB 50253 pipeline engineering design
GB 50275 compressor ﹑ ﹑ fan pump installation engineering construction and acceptance
3 General requirements
3.1 by volume as a standard metered tube station construction should follow the principle of GB/T 9109.1 given requirements.
Basic Skills 3.2 volume pipe and auxiliary equipment requirements for the implementation of GB/T 17286.2 of the relevant provisions.
3.3 meters - for the transfer test tube volume, the repeatability should be better than 0.02%.
3.4 volume pipe system design should be based on the selected flowmeter type, nominal diameter, number of units and other factors to consider, at an affordable original
Choose fixed installation or mobile prover volume tube.
3.5 and meet the technical requirements under the premise of the overall arrangement, the volume of pipe installation system should ensure a stable flow pattern, the volume of pipe system layout,
Fire safety should be consistent with the relevant provisions.
3.6 volume pipe system design, including design of the installation process, the water flooding method verification systems and auxiliary systems.
3.7 volume tube design system should meet the volume of pipe installation, operation, operation and maintenance requirements to ensure stable performance measurement system, accurate and reliable.
3.8 according to the geographical and climatic conditions, determine the volume of the tube is installed indoors or outdoors, and take appropriate measures to maintain the ambient temperature, at full
Foot Prover operating environment requirements. Northern cold areas should be installed indoors; in the south can be installed outdoors, but avoid direct sunlight. body
Plot of control system should be set up in the control room of the explosion and fire.
3.9 volume tube should be used to sled the whole supply, the factory certified by; split supply disassembly should be qualified and then boxed in factory test.
4 System Design
4.1 Prover Selection
4.1.1 ball prover should adopt fixed installation, DN150 following ball prover can be mobile; piston prover (or small capacity
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 9109.3-2014_English be delivered?Answer: Upon your order, we will start to translate GB/T 9109.3-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 9109.3-2014_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 9109.3-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 9109.3-2014?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 9109.3-2014 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|