|
US$519.00 · In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 8423.5-2017: Petroleum and natural gas industries terminology -- Part 5: Equipment and material Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 8423.5-2017 | English | 519 |
Add to Cart
|
5 days [Need to translate]
|
Petroleum and natural gas industries terminology -- Part 5: Equipment and material
| Valid |
GB/T 8423.5-2017
|
PDF similar to GB/T 8423.5-2017
Basic data | Standard ID | GB/T 8423.5-2017 (GB/T8423.5-2017) | | Description (Translated English) | Petroleum and natural gas industries terminology -- Part 5: Equipment and material | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | E90 | | Classification of International Standard | 75.180.01 | | Word Count Estimation | 26,243 | | Date of Issue | 2017-07-12 | | Date of Implementation | 2018-02-01 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 8423.5-2017: Petroleum and natural gas industries terminology -- Part 5: Equipment and material ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Petroleum and natural gas industries terminology - Part 5. Equipment and material
ICS 75.180.01
E90
National Standards of People's Republic of China
Replacing GB/T 8423-2008
Oil and gas industry terminology
Part 5. Equipment and materials
Petroleumand naturalgasindustriesterminology-
Part 5.Equipmentandmaterial
2017-07-12 Posted
2018-02-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Foreword Ⅲ
1 Scope 1
2 drilling and workover equipment 1
3 cementing and completion equipment 5
4 oil recovery equipment 5
5 marine operations equipment 8
6 drilling tools 9
7 oil pipe 12
Oil Equipment 13
Index 15
Foreword
GB/T 8423 "oil and gas industry terminology" is divided into six parts.
--- Part 1. Exploration and development;
--- Part 2. Engineering Technology;
--- Part 3. Oil and gas ground engineering;
--- Part 4. Oil and gas measurement and analysis;
--- Part 5. Equipment and materials;
--- Part 6. Safety, environmental protection and energy saving.
This section GB/T 8423 Part 5.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This Part replaces GB/T 8423-2008 "oil drilling equipment and special pipe vocabulary." This section and GB/T 8423-2008 phase
Than, in addition to editorial changes outside the main technical changes are as follows.
--- Each chapter has a new term additions and deletions;
--- Modify some chapter title;
--- Removed the "drilling fluid solid-phase control system" chapter, it will be incorporated into "drilling fluid circulation system" (see.2008 edition Chapter 8);
--- Removed "from the oil well equipment" chapter (see.2008 edition Chapter 13);
--- Removed "enhanced oil recovery equipment" chapter (see.2008 edition Chapter 18);
--- Removed the "test tool" chapter (see.2008 edition Chapter 21);
--- Removed the "drilling automation equipment and systems" chapter (see.2008 edition Chapter 22);
--- Removed "oil production automation equipment and systems" chapter (see.2008 edition Chapter 23);
--- Remove the "pneumatic systems and components" chapter (see.2008 edition Chapter 24);
--- Added "control system" (see 2.7);
--- Added "column automation device" (see 2.8);
--- Added "marine equipment" chapter (see Chapter 5);
--- Added "cementing tools" (see 6.2);
--- Added "workover tools" (see 6.4);
--- Added "Petroleum Instrument" chapter (see Chapter 8).
This part of the National Petroleum Drilling Equipment and Tools Standardization Technical Committee (SAC/TC96) proposed and managed.
This part of the drafting unit. Petroleum Industry Standardization Institute, China Petroleum Pipeline Engineering Research Institute, Baoji Petroleum Machinery has
Limited liability company, Nanyang Erji Petroleum Equipment Group Co., Ltd., China National Petroleum Corporation Jinan Diesel Engine Plant, China National Petroleum Chuanqing drilling
Exploration Engineering Co., Ltd., China Petroleum & Chemical Corporation Petroleum Engineering Technology Research Institute, Daqing Oilfield Equipment Manufacturing Group, PetroChina
Group Drilling Engineering Research Institute, the Sinopec Petroleum Engineering Machinery Co., Ltd. Fourth Machinery Plant, China National Petroleum Corporation Oriental Geophysical Exploration
Limited Liability Company, Xi'an Shiyou University.
The main drafters of this section. Gao Shengping, Zhang Yu, Cao Jianping, Chen Junfeng, Nie Hongfang, Ge Mingjun, Sun Juan, Caucasus, Wen Zhi Xiong, Wu Jihao,
Wang Jiangong, Yu Xiaoyan, Fan Yamin, Fang Wei, Shi Jiaming, Wu Wenzhen, Wu Hanchuan, Han Chengcai, Zhang Xianglai, Yin Yugang.
This part replaces the standards previously issued as.
--- GB/T 8423-1987, GB/T 8423-1997, GB/T 8423-2008.
Oil and gas industry terminology
Part 5. Equipment and materials
1 Scope
GB/T 8423 This section defines the oil and gas industry with drilling equipment, oil production equipment, marine equipment, drilling tools, stone
Tubing and oil instruments and other fields of terminology.
This section applies to oil and gas exploration and development projects, drilling engineering, oil production engineering, petroleum pipe engineering and oil instrumentation and other applications
field.
2 drilling and workover equipment
2.1 rig and the main parameters
2.1.1
Drilling rig drilingrig
Oil and gas exploration and development complete drilling operations complete sets of equipment. Mainly include the power system, transmission system, upgrade system
(2.5.1), rotating system, circulatory system, base (2.2.2), control system and auxiliary system are mainly divided into mechanical transmission drilling rig, electric driven drill
Machine, hydraulic drive rig and so on.
2.1.2
Maximum hook loadhookload
According to the derrick (2.2.1), the bearing unit and other material strength and the specified safety factor to determine the maximum load the equipment can withstand, the drilling rig
(2.1.1) or workover rig (2.10.2) Maximum load that a hook (2.5.5) can raise under the maximum number of ropes, including static and dynamic loads
section.
2.1.3
Nominal drilling deep nominaldrilingdepth
Drilling rig (2.1.1) can achieve the drilling depth at the specified number of drilling ropes using the specified drill string.
2.2 derrick and base
2.2.1
Derricks; masts
Placed on the base (2.2.2) above, for the placement of Crane (2.5.3), suspension travel (2.5.4), hooks (2.5.5) and other equipment,
Store drill pipe (7.1.1), casing (7.1.9) and other steel structures.
2.2.2
Base substructure
Place derrick (2.2.1), winch (2.5.2), turntable (2.4.1), stand and drilling tools, drilling operation site and wellhead
Installation (4.1.1), blowout preventer (2.9.2) Installation space steel structure.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 8423.5-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 8423.5-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 8423.5-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 8423.5-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|