US$799.00 · In stock Delivery: <= 9 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 8117.4-2017: Rules for steam turbine thermal acceptance test -- Part 4: Method D -- Simplified performance test rules for steam turbine and its thermal cycle Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 8117.4-2017 | English | 799 |
Add to Cart
|
9 days [Need to translate]
|
Rules for steam turbine thermal acceptance test -- Part 4: Method D -- Simplified performance test rules for steam turbine and its thermal cycle
| Valid |
GB/T 8117.4-2017
|
PDF similar to GB/T 8117.4-2017
Basic data Standard ID | GB/T 8117.4-2017 (GB/T8117.4-2017) | Description (Translated English) | Rules for steam turbine thermal acceptance test -- Part 4: Method D -- Simplified performance test rules for steam turbine and its thermal cycle | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | K54 | Classification of International Standard | 27.040 | Word Count Estimation | 40,488 | Date of Issue | 2017-11-01 | Date of Implementation | 2018-05-01 | Regulation (derived from) | National Standard Announcement 2017 No. 29 | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 8117.4-2017: Rules for steam turbine thermal acceptance test -- Part 4: Method D -- Simplified performance test rules for steam turbine and its thermal cycle ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Rules for steam turbine thermal acceptance test-Part 4. Method D-Simplified performance test rules for steam turbine and its thermal cycle
ICS 27.040
K54
National Standards of People's Republic of China
Turbine thermal performance acceptance test procedures
Part 4. Method D Turbine and its heat
Loop simplified performance test
Part 4.MethodD-Simplified performancetestrulesforsteam
Posted.2017-11-01
2018-05-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Foreword Ⅲ
1 Scope and purpose 1
1.1 Scope 1
1.2 Purpose 1
2 Normative references 1
3 Terms and definitions, symbols and definitions 2
3.1 Terms and definitions 2
3.2 Symbols and definitions 3
4 guidelines 4
4.1 The establishment of the thermal system boundary 4
4.2 Type of thermal performance test 5
4.3 Uncertainty Analysis 8
4.4 Pre-test plan 8
4.5 Test Outline 9
4.6 Test time 9
4.7 Preparation before testing 9
4.8 Preliminary test 12
4.9 Test Tuning 13
4.10 Test conditions 13
5 Measurement Technology and Measuring Instruments 15
5.1 General 15
5.2 Power Measurement 15
5.3 Traffic Measurement 16
5.4 Pressure Measurement 18
5.5 Temperature Measurement 19
5.6 Steam quality measurement 20
5.7 Speed Measurement 20
5.8 Time Measurement 20
6 Calculation of test results 21
6.1 Preparation before calculation 21
6.2 Calculation of the results 21
7 Correction of test results and comparison with benchmark performance or guaranteed value 23
7.1 Benchmark Performance 23
7.2 Guaranteed value and guaranteed conditions 23
7.3 Main Steam Flow Correction 23
7.4 maximum output correction 23
7.5 Thermal efficiency and thermodynamic efficiency of the amendment 23
7.6 Definition and Application of Correction Values 25
7.7 Amendment 25
7.8 amendments to be considered parameters 25
7.9 Test tolerance 25
7.10 Turbine Performance Aging 26
7.11 Guaranteed value comparison 26
Appendix A (informative) steam turbine and its thermodynamic simplified basic performance testing 27
Appendix B (informative) Guidance for the choice of test type 28
Appendix C (Informative) Example of Multiple Measures 33
Foreword
GB/T 8117 "Steam turbine thermal performance acceptance test procedures" is divided into the following sections.
--- Part 1. Method A large condensing steam turbine high accuracy test;
--- Part 2. Method B Wide-accuracy test of turbines of various types and capacities;
--- Part 3. Method C to retrofit steam turbine thermal performance verification test;
--- Part 4. Method D steam turbine and its thermal cycling simplified performance test.
This section GB/T 8117 Part 4.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This part is proposed by China Electrical Equipment Industry Association.
This part of the National Steam Turbine Standardization Technical Committee (SAC/TC172) centralized.
This section drafting unit. Shanghai Power Equipment Institute, Xi'an Thermal Research Institute Co., Ltd. and Shanghai Ming Wah Electric Power Engineering
Cheng Co., Ltd. and so on.
The main drafters of this section. Liu Xiang Min, Shi Yan Chau, Ye Fen, Yang Tianhai, Fu Chang, Zhu Youjun, Liu Wei, Zhao Wen, Chen Xin.
Turbine thermal performance acceptance test procedures
Part 4. Method D Turbine and its heat
Loop simplified performance test
1 Scope and purpose
1.1 Scope
This part of GB/T 8117 applies to wide-area steam turbine performance test running in superheated steam zone or saturated steam zone, applicable
Turbines for various types, capacity classes and uses.
This section is mainly used for turbine performance monitoring test can be used before and after the turbine overhaul test can also be used in accordance with the implementation of this section small
Turbine's guaranteed value verification, but not for large-scale steam turbine thermal performance acceptance test.
This section includes all types of thermal performance test is as follows.
a) The whole machine cycle thermal efficiency or heat rate;
b) the maximum output or output under the specified conditions;
c) steam consumption rate;
d) cylinder efficiency;
e) pressure and temperature characteristics;
f) the relationship between power and steam flow;
g) Flow capacity;
h) Feedwater heater performance monitoring;
i) Condenser Performance Monitoring (etc).
This section does not include an analysis of the uncertainty of steam quality measurements.
1.2 purpose
The purpose of this section is to give simple and practical test methods with different accuracies to provide the required tests for performance monitoring and diagnosis
result.
If you take some of the measures highlighted in this section can also be used to verify the manufacturer's warranty value.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 8117.1-2008 Steam turbine thermal performance acceptance test procedures - Part 1. Method A Large condensing steam turbine high
Accuracy test
GB/T 8117.2-2008 Steam turbine thermal performance acceptance test procedures - Part 2. Method B Steam turbine of various types and capacities
Machine width accuracy test
GB/T 8117.3-2014 Steam turbine thermal performance acceptance test procedures - Part C. Method C steam turbine thermal performance test
Card test
Power station boiler performance test code
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 8117.4-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 8117.4-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 9 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 8117.4-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 8117.4-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|