HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 8117.3-2014 English PDF

US$1374.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 8117.3-2014: Rules for steam turbine thermal acceptance tests -- Part 3: Method C -- Turbine thermal performance verification test
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 8117.3-2014English1374 Add to Cart 5 days [Need to translate] Rules for steam turbine thermal acceptance tests -- Part 3: Method C -- Turbine thermal performance verification test Valid GB/T 8117.3-2014

PDF similar to GB/T 8117.3-2014


Standard similar to GB/T 8117.3-2014

GB/T 14478   GB/T 754   GB/T 10969   GB/T 5578   GB/T 8117.4   GB/T 8117.2   

Basic data

Standard ID GB/T 8117.3-2014 (GB/T8117.3-2014)
Description (Translated English) Rules for steam turbine thermal acceptance tests -- Part 3: Method C -- Turbine thermal performance verification test
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard K54
Classification of International Standard 27.040
Word Count Estimation 69,642
Date of Issue 12/12/2014
Date of Implementation 6/1/2015
Adopted Standard IEC 60953-3-2001, IDT
Regulation (derived from) National Standards Bulletin 2014 No. 30
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard specifies the procedures for the transformation of complementary transformation turbine thermal performance verification tests. The provisions of this standard given follow GB /T 8117.2-2008 in the guidelines, but also modify and supplement

GB/T 8117.3-2014: Rules for steam turbine thermal acceptance tests -- Part 3: Method C -- Turbine thermal performance verification test


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Rules for steam turbine thermal acceptance tests Part 3. Method C. Turbine thermal performance verification test ICS 27.040 K54 National Standards of People's Republic of China Turbine Performance acceptance test procedure Thermal transformation method C Turbine. Part 3 Performance Verification Test Rulesforsteamturbinethermalacceptancetest-Part 3. MethodC- (IEC 60953-3.2001, Rulesforsteamturbinethermalacceptancetest- Part 3. Thermalperformanceverificationtestsofretrofittedsteam turbines, IDT) Issued on. 2015-06-01 2014-12-22 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅲ Introduction Ⅳ 1 Scope 1 1.1 Scope 1 1.2 Objective 1 Matters to be Considered 1.3 contract 1 2 Normative references 2 3 units, symbols, terms and definitions 2 3.2.1 The symbols and units used in part 2 3.3.1 This section subscript with superscript 2 Terms and definitions in this section 3.3.2 3 Part 4 3.4.8 Efficiency 3.5 ensure that the value of the selection guide 6 3.5.1 ensure absolute value 6 3.5.2 ensure that performance improvement relative value 7 4 General 8 Preplanning 4.1 Test 8 4.3.1 verification test of time 8 5 measurement techniques and measuring instruments 10 5.1.6 Test before and after the transformation and renovation of consistency test 10 5.2.8 Test before and after the transformation and reconstruction of electric power determination test 10 5.3.1 test 10 to determine the flow rate 5.7.7 retrofit applications using the Tracer 11 6 11 test calculation 6.1 Calculation test preparation 11 6.2.2 Fixed average reading and conversion 11 6.2.4 Thermodynamic properties of water and steam 12 6.2.5 Calculation of test results 12 7 amendments and compare test results with guaranteed values \u200b\u200bof 14 7.1.1 ensure that the value and the transformation of the specific guarantee conditions 14 7.8 Comparison of guaranteed value of 14 Performance degradation 7.9.1 Reconstruction member (aging) 15 Annex H (normative) Test results measurement uncertainty --- retrofit applications 16 Performance improvement value Annex I (informative) Calculation --- Transformation example (thermal power and nuclear power) 20 Appendix J (informative) uncertainty calculation examples --- (thermal power and nuclear power) 42 Annex K (normative) tracer techniques --- retrofit applications 55 Annex L (informative) temperature difference method 58

Foreword

GB/T 8117 "steam turbine thermal acceptance tests" is divided into three parts. --- Part 1. Method A large condensing steam turbine with high accuracy test; --- Part 2. Method B types and sizes of turbines Wide range of accuracy; --- Part 3. Method C transformation turbine thermal performance verification tests. This section GB/T 8117 Part 3. This section drafted in accordance with GB/T 1.1-2009 given rules. This section uses the translation method is equivalent to using IEC 60953-3.2001 "steam turbine thermal acceptance tests - Part 3. Transformation of Steam Turbine Thermal performance verification test. " This part made the following editorial changes. --- Consistent with the existing standard series, the standard name will be changed to "procedures turbine thermal acceptance tests - Part 3. Method C Thermal Performance transformation Turbine verification tests. " This part is proposed by the China Electrical Equipment Industrial Association. This part of the National Standardization Technical Committee turbine (SAC/TC172) centralized. This section is drafted. Shanghai Power Equipment Research Institute, Xi'an Thermal Power Research Institute Co., Ltd. The main drafters of this section. Liuxiang Min, Shi Yanzhou, Zhuyou Jun, Zhao Yi, Ye Fen, Yang Shoumin, Zhang Huamin, in the novel, Liu Chen and Zhu Litong, Yangrui Fu, Yao Xiaolin.

Introduction

Transformation active steam turbines often include performance improvements. Part 1 and Part 2 provides a new steam turbine power plant Force performance acceptance testing procedures, but still can not meet all the requirements of specific renovation projects, and therefore the need for a supplementary test procedures, as Reconstruction turbine thermal acceptance test guidelines. However, the first part and a lot of terms and recommended requirements of Part 2 still apply to test reconstruction project, therefore, in order to avoid content Repetition and excessive length, in this section appears only transform unit unique supplement and amendment. This section should be read in conjunction with Part 2, and with the "verification test" instead of "acceptance tests", and Part 2 as a reference standard to make use. Structure and terms of the number of the section in line with Section 2, sub-clause in this section instead of part 2 of all the corresponding sub-clause. As long as there is this part of what is new, increased sub-clause number, the number sequentially extended, Part 2 without amendment of sub-clause is not in this section Repeat. Since Part 2 is more common and more suitable for renovation projects, so the use of Part 2 of this section as a reference standard, rather than Part 1 Minute. Although this section applies to the transformation of large condensing steam turbine, but can also be applied to other types and sizes of turbines, as relevant It was agreed that the basis of specific test schedules. Part 2 takes precedence over Part 1 as a reference standard does not mean reduced accuracy, but for renovation projects and related guaranteed , The former provisions can get suitable test accuracy. In some cases, the need to use Part 1 of more stringent rules in order to achieve The aim of these projects shall be specified in the present section. Given the provisions of this section apply to the transformation of turbine equipment for all hardware components. But for other devices (such as boilers, water heating Etc.) transformation test is not included in this section, even though these changes may affect the performance of the thermodynamic cycle. The purpose of this section is to verify the impact of the transformation of plant efficiency turbine performance guarantee value. Many different revamping encounter, Such as replacement of the steam valve, part of the turbine blades, rotor, replacement of the whole module. Ensure that the value will depend on the specific circumstances of the transformation to And the parties to the contract agreed upon protocol. According to this section, the parties can determine the most appropriate parameter values \u200b\u200bas a guarantee in order to evaluate the performance after the transformation. The main difficulty is the choice of the transformation project guaranteed values. Although the original manufacturer are usually willing to adopt improved relative performance guarantee value, but for Do not need to understand the transformation of the original equipment supplier for all other details in terms of absolute performance may be willing to use the device after transformation guaranteed. This section Given the choice of guaranteed guidance. Once the guaranteed value, you may need to test performance by the transformation of the former recalculate the guaranteed value. this These provisions also provide a partial guarantee for value verification. This appendix section gives several detailed application examples, this section is difficult to fully cover all situations transformation project. Part and Part 2 of the main differences in the main terms are as follows. --- Scope and purpose This part in particular made some new guarantee value is defined. So that it may transform a typical indicator device (such as cylinder efficiency, the valve chamber Chamber pressure drop, etc.) that guarantee. Absolute guarantee that the value specified in Section 2 is not suitable for determining the transformation between the rear original equipment and devices Improved results, so this part of the introduction of relatively guaranteed. Because there are a variety of different transformation case, a contractual warranty terms vary, so this part of the requirements of the terms of the contract review. in When determining the guaranteed value, that is written in the contract stage before the performance verification tests will depend on the terms of the contract agreement the parties agreed. --- Units, symbols, terms and definitions All units, symbols, terms and definitions applicable to Part 2 of this section. However, the present situation and the transformation section contains relevant new Concepts and new terminology, especially the proposed new definition of the second supplement or replace the guaranteed portion. This section has a guide table for each relevant Elects to adapt the project to ensure value. Guaranteed manufacturers can provide are. ● ensure absolute value --- Heat efficiency or heat consumption rate of the steam turbine; Steam flow --- a predetermined condition, thermodynamic efficiency of the steam turbine or steam consumption rate or output power; --- Main steam flow capacity and/or the maximum power output; --- Internal efficiency of the turbine of each cylinder. ● ensure relative value --- Steam turbine thermal efficiency or improved heat rate; --- Thermodynamic efficiency or steam consumption rate or improved output power; --- Main steam flow capacity and/or improved maximum output power; --- Steam Turbine cylinder efficiency improvements. --- General General Part 2 is also most useful in retrofit situations. Amended or supplemented in this chapter include. Note when the transformation of the former, after the test Precautions, as well as when making performance improvements to ensure that the required reference value. Pay special attention to the system to isolate the problem and can cause tolerance measurements a significant impact on the test results. --- Measurement technology and instrumentation In the renovation project, we can not set firm guidelines on measurement techniques and instrumentation. Select the instrument should be able to meet the desired installation and inspection It requires permits guaranteed values. Appendix J gives the accuracy of individual measurements to ensure that the value of sensitivity coefficient, able to make the most appropriate instrument s Choice. As traffic is one of the most important measurement, so this part of the need to respect the installation of flow measurement devices gives guidance. Push Recommended allows simultaneous measurement and comparison of the main flow method. The situation is difficult to remove the flow meter for routine check, using a diagram given in Appendix K Track measuring flow as a suitable alternative. --- Test Calculation This section gives the rules applicable to the calculation of guaranteed value of the renovation project. For retrofit applications of unknown leak, also gives special Provisions. --- Amendments and compare test results with guaranteed values Correction method specified in Section 2 also apply to this section, but there is no guarantee for new types of value of special provisions. For deferred Test, gives guidance on aging issues. This chapter also includes the effectiveness of the performance values, these values \u200b\u200bare used to determine the reference base to ensure performance improvement value. When the transformation of the former test table Ming will be the transformation of the actual state of the predetermined condition of the turbine are different, more acceptable to the original guaranteed value to be modified. Reconstruction turbine or its components may affect other devices (feedwater heaters, condensers, boilers) operating conditions. If the transformation Movies It rang beyond the boundary conditions, may be required to the manufacturer's instructions on the transformation of neighboring devices. --- Measurement Uncertainty For special cases encountered in the transformation project, this section of Appendices I and J of Part 2 of the relevant provisions of the supplement. Due to a variety of circumstances, it is recommended that the transformation was carried out as early as possible before the uncertainty calculation to determine the required test instrumentation. Attached Recorded examples for reference. ---appendix After this section in Part 2 of Annex 7 already (Appendix A ~ Appendix G) adds five new appendix (Appendix H ~ Appendix L). Appendix H deals with the uncertainty retrofit applications, and improve the information given in Part 2 of Appendix F. Appendices I and J show examples of performance calculation and uncertainty in the thermal power station and nuclear power plant retrofit applications of computing. Appendix K describes the particular method of reconstruction projects Tracer techniques to measure the flow. Examples are given in Appendix L of a "temperature difference method" to determine the high and medium pressure steam seal co-cylinder steam flow methods and recommendations. Turbine Performance acceptance test procedure Thermal transformation method C Turbine. Part 3 Performance Verification Test

1 Scope

1.1 Scope This section GB/T 8117, and also known as "transformation rules", developed for the transformation of the supplementary turbine thermal performance verification tests Transformation procedures. Given the provisions of this section follows the GB/T 8117.2-2008 in the guidelines, but also modify and supplement the guaranteed transformation Turbine And to verify the guaranteed value by thermal acceptance tests. This section gives a validation test preparation, implementation, computing, the general principles of comparison and measurement uncertainty and other test results and guaranteed values. This section applies only to certain hardware transformation turbine equipment performance verification tests. This section does not apply to any changes in the circulatory system Or transform into any other power plant equipment (such as boilers, water heaters, etc.). 1.2 Purpose The purpose of this section is to determine the appropriate value of the parameter guarantee, verification and guarantee value to determine the measurement uncertainty. Guaranteed with additional provisions should be complete and express no contradiction (see GB/T 8117.2-2008 in this section 3.4 and 3.4.8, 3.5). Verification tests may also include a measure to ensure the conditions required modifications and test results. 1.3 Contract Matters to be Considered Some items in this section should be considered at an early stage. Before contract, the parties shall determine differences and reach an agreement. These matters package Included in Table 1. Table 1 Contract Matters to be Considered Reg number paragraph Remarks And paragraph 7 of the Introduction, paragraph 5 of the program and ensure that the value Paragraph 21 defines the value of guarantee All paragraphs 3.5 3.5.1.1 paragraph 2 4.1 and paragraph 4, paragraph 1 Paragraph 4 4.2 7.1.1 last paragraph 7.8 - ensure that the comparison value 7.9.1 - Performance degradation Reconstruction member

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 8117.3-2014_English be delivered?

Answer: Upon your order, we will start to translate GB/T 8117.3-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 8117.3-2014_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 8117.3-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.