HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (12 Oct 2025)

GB/T 6115.1-2008 English PDF

US$929.00 · In stock
Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 6115.1-2008: Series capacitors for power systems -- Part 1: General
Status: Valid

GB/T 6115.1: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 6115.1-2008English929 Add to Cart 7 days [Need to translate] Series capacitors for power systems -- Part 1: General Valid GB/T 6115.1-2008
GB/T 6115.1-1998EnglishRFQ ASK 6 days [Need to translate] Series capacitors for power systems. Part 1: General--Performance, testing and rating--Safety requirements--Guide for installation Obsolete GB/T 6115.1-1998
GB/T 6115-1985EnglishRFQ ASK 3 days [Need to translate] Series capacitors Obsolete GB/T 6115-1985

PDF similar to GB/T 6115.1-2008


Standard similar to GB/T 6115.1-2008

GB/T 11024.4   GB/T 11024.2   GB/T 8286   GB/T 4787.1   GB/T 6115.2   GB/T 3667.1   

Basic data

Standard ID GB/T 6115.1-2008 (GB/T6115.1-2008)
Description (Translated English) Series capacitors for power systems -- Part 1: General
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard K42
Classification of International Standard 31.060.70
Word Count Estimation 42,49
Date of Issue 2008-06-30
Date of Implementation 2009-04-01
Older Standard (superseded by this standard) GB/T 6115.1-1998
Adopted Standard IEC 60143-1-2004, MOD
Regulation (derived from) Announcement of Newly Approved National Standards No. 11 of 2008 (No. 124 overall)
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard applies to the transmission. Series capacitor units and capacitor banks are usually intended for access to high-voltage power systems. This standard applies to the entire voltage range. This standard does not apply to self-healing metallized dielectric types of capacitors.

GB/T 6115.1-2008: Series capacitors for power systems -- Part 1: General

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Series capacitors for power systems Part 1. General ICS 31.060.70 K42 National Standards of People's Republic of China Replacing GB/T 6115.1-1998 Series capacitors for power systems Part 1. General (IEC 60143-1.2004, MOD) Posted 2008-06-30 2009-04-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Preface Ⅰ 1 Scope and purpose 1 2 Normative references 1 3 Terms and definitions 2 Conditions 4 6 5 Quality requirements and tests 7 6 insulation level 14 7 overload, over-voltage and load cycle 20 8 Security Requirements 21 9 signs and instructions 21 10 rating selection, installation and operation are 23 Testing requirements in Appendix A (normative) External fuses and fuse breaking by an external capacitor cells and the use of guidelines 31 Annex B (informative) series capacitor banks to estimate economic losses 33 Annex C (informative) capacitor bank fuse technology and capacitor cell configuration 34 Annex D (informative) transmission lines in a large series capacitor means typical wiring legend 36 Precautions PCB-contaminated environment Appendix E (normative) to prevent 37 References 38

Foreword

GB/T 6115 "Series capacitors for power systems" is divided into three parts. --- Part 1. General; --- Part 2. Protective equipment for series capacitor banks; --- Part 3. Internal fuses. This section GB/T 16115 Part of. The partial modification using IEC 60143-1 "Series capacitors for power systems - Part 1. General" (2004, in English). The main difference between this part of IEC 60143-1 are. --- Insulation withstand voltage of the capacitor units and capacitor means and in compliance with the GB 311.1 GB/T 311.2-2002's. This Part replaces GB/T 6115.1-1998 "Series capacitors for power systems - Part 1. General - Performance, testing and rating Safety Requirements Installation Guide. " This section compared with the GB/T 6115.1-1998, the main changes are as follows. --- Increasing the number of terms and definitions, such as the degree of compensation, no-fuse capacitor bank, the level of protection, power frequency withstand voltage, sub-section and so on; --- Inter-terminal test voltage is determined there is a great change, the abolition of the AC voltage test; --- Routine tests added "internal fuses discharge test"; --- Cancel the type approval test "Internal Fuse Test"; --- Added Appendix "series capacitor banks estimated economic loss"; --- Added Appendix "fuse technology and capacitor cell configuration of the capacitor bank"; --- Rating in the selection, installation and operation guidelines, add a lot of content; --- Increasing the typical platform-to-ground insulation level insulator; --- Added creepage distance requirements; --- Increasing the standard lightning impulse withstand relations and standard operating voltage and the minimum distance between the air; --- Increasing the voltage curve between the pitch and the air exchange frequency tolerance. Appendix A of this section is normative appendix, Appendix B, Appendix C, Appendix D and Appendix E is an informative annex. This part is proposed by the China Electrical Equipment Industrial Association. This part of the National Standardization Technical Committee Power capacitor (SAC/TC45) centralized. This section is drafted. Xi'an Institute of Electric Power capacitors ABB Xi'an Power Capacitor Co., Ltd. The main drafters of this section. Li Huaiyu, Liu Jing. This part of the standard replaces the previous editions are. --- GB 6115-1985; --- GB/T 6115.1-1998. Series capacitors for power systems Part 1. General

1 Scope and purpose

This part of GB/T 6115 is intended to apply to AC transmission line connected in series or distribution lines, become frequency Capacitor units and capacitor banks an integral part of the AC power system of 15Hz ~ 60Hz. This section applies to the transmission. Series capacitor units and capacitor banks are usually intended for access to high voltage power system. This section applies to the entire voltage range. This section does not apply to self-healing metallized dielectric type capacitor. Even following a capacitor connected in series with the circuit does not apply to this section. --- Induction heating device with a capacitor (GB/T 3984.1); --- AC motor capacitor (GB/T 3667.1); --- Power electronic capacitors (GB/T 17702); --- Tubular fluorescent and other discharge lamp circuits capacitors (GB 18489 and GB/T 18504). Standard type insulators, switches, transformers, fuses and other external attachments shall comply with the relevant national standards. Note 1. There are additional requirements in the fuse protection and internal capacitor fuse requirements see GB/T 6115.3-2002. Note 2. The external fuse protection for additional requirements for external capacitors and fuses are specified in Annex A. Note 3. The separate standard accessory series capacitor (spark gap and nonlinear resistors, discharge reactors, damping reactors current limiting, damping resistors, circuit breakers, etc.) is GB/T 6115.2-2002. Internal fuses capacitor in series with the standard GB/T 6115.3-2002. The purpose of this section is. --- Formulating performance, testing and rating of the uniform requirements; --- Develop specific safety rules; --- Install and run the Guide.

2 Normative references

The following documents contain provisions by GB/T 6115 this part of the reference in terms of this section. For dated reference documents Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this section. Note. If this part of the standard listed below there is a conflict, places the test in this section shall prevail. GB 311.1 insulation with high-voltage power transmission equipment (GB 311.1-1997, neqIEC 60071-1.1993) GB/T 311.2-2002 Insulation coordination - Part 2. insulated high voltage transmission and distribution equipment used in conjunction with Guideline (eqv IEC 60071-2. 1996) GB/T 6115.2-2002 Series capacitors for power systems - Part 2. Protective equipment for series capacitor banks (IEC 60143-2. 1994, IDT) GB/T 6115.3-2002 Series capacitors for power systems - Part 3. Internal fuses (IEC 60143-3.1998, IDT) GB/T 11024.2-2001 rated voltage above 1kV shunt capacitors for ac power systems - Part 2. Endurance testing (Idt IEC /T S60871-2.1999) GB 15166.5 AC high voltage shunt capacitor fuses for the external protection fuses (GB 15166.5-1994, neqIEC 60549. 1976)

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 6115.1-2008_English be delivered?

Answer: Upon your order, we will start to translate GB/T 6115.1-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 6115.1-2008_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 6115.1-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 6115.1-2008?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 6115.1-2008 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.