US$599.00 ยท In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 45310-2025: Specification for main control system of solar power tower plant Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 45310-2025 | English | 599 |
Add to Cart
|
5 days [Need to translate]
|
Specification for main control system of solar power tower plant
| Valid |
GB/T 45310-2025
|
PDF similar to GB/T 45310-2025
Basic data Standard ID | GB/T 45310-2025 (GB/T45310-2025) | Description (Translated English) | Specification for main control system of solar power tower plant | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | F12 | Classification of International Standard | 27.160 | Word Count Estimation | 30,349 | Date of Issue | 2025-02-28 | Date of Implementation | 2025-09-01 | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 45310-2025: Specification for main control system of solar power tower plant---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
GB/T 45310-2025 English version. Specification for main control system of solar power tower plant
ICS 27.160
CCSF12
National Standard of the People's Republic of China
Main control system of tower solar thermal power station
Technical conditions
Released on 2025-02-28
2025-09-01 Implementation
State Administration for Market Regulation
The National Standardization Administration issued
Table of Contents
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Abbreviations 2
5 General Requirements 2
6 System Architecture 2
7 Application Functions 4
8 System Requirements14
9 Technical Documents18
10 Packaging and storage requirements 19
11 Factory Function Test 19
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed by the China Electricity Council.
This document is under the jurisdiction of the National Solar Thermal Power Generation Standardization Technical Committee (SAC/TC565).
This document was drafted by. China Energy Engineering Group Technology Development Co., Ltd., China Energy Engineering Group Co., Ltd. Engineering Research Institute,
China Electric Power Engineering Consulting Group Northwest Electric Power Design Institute Co., Ltd., Zhejiang University, and China Power Construction Engineering Consulting Co., Ltd.
The main drafters of this document are. Xu Jigang, Liu Xinlong, Xiao Gang, Xu Zhiqiang, Zhang Wentao, Wu Feng, Qiu Tao, Xiao Haojin, Tian Yao, Liu Tianying, Zhang Jiaquan,
Liu Tao, Chen Yongan, Kou Zhibo, Wang Wei, Gao Song, Zhu Peiwang, Lu Guangyu, Qi Cheng.
Main control system of tower solar thermal power station
Technical conditions
1 Scope
This document specifies the system architecture, application functions, system equipment requirements, technical documents,
Packaging and storage requirements, describes the factory functional test method.
This document is applicable to the main control of new, expanded and rebuilt molten salt working fluid tower solar thermal power stations using steam turbine generator sets.
Design, manufacture, testing, operation and maintenance of the system.
2 Normative references
The contents of the following documents constitute essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to
This document.
GB/T 2421 Environmental testing overview and guidelines
GB/T 4208 Enclosure protection grade (IP code)
GB/T 13384 General technical requirements for packaging of electromechanical products
GB/T 17626.2 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test
GB/T 17626.3 Electromagnetic compatibility test and measurement technology Part 3.Radio frequency electromagnetic field radiation immunity test
GB/T 17626.4 Electromagnetic compatibility test and measurement technology Electrical fast transient pulse group immunity test
GB/T 17626.5 Electromagnetic compatibility test and measurement technology Surge (impact) immunity test
GB/T 17626.8 Electromagnetic compatibility test and measurement technology Power frequency magnetic field immunity test
GB/T 17626.11 Electromagnetic compatibility test and measurement technology Part 11.For each phase input current less than or equal to 16A
Voltage dips, short interruptions and voltage variations immunity test for equipment
GB/T 18271.3 General performance evaluation methods and procedures for process measurement and control devices Part 3.Tests for the influence of influencing quantities
GB/T 33009.1 Industrial automation and control system network security Distributed control system (DCS) Part 1.Protection requirements
GB/T 40104 Terminology for Solar Thermal Power Stations
3 Terms and definitions
The terms and definitions defined in GB/T 40104 and the following apply to this document.
3.1
Main control system main control system
Data collection, processing, control and protection of the main production processes of tower solar thermal power stations, including heat collection, heat storage, heat exchange and power generation
computer system.
3.2
coordinated control
Perform overall load balance control on steam generator and steam turbine generator set, and maintain the active power and main steam pressure of the set
Automatic control of main parameters within the allowable range.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 45310-2025_English be delivered?Answer: Upon your order, we will start to translate GB/T 45310-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 45310-2025_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 45310-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|