|
US$339.00 ยท In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 41255-2022: Smart factory - General technical requirements Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 41255-2022 | English | 339 |
Add to Cart
|
4 days [Need to translate]
|
Smart factory - General technical requirements
| Valid |
GB/T 41255-2022
|
PDF similar to GB/T 41255-2022
Basic data | Standard ID | GB/T 41255-2022 (GB/T41255-2022) | | Description (Translated English) | Smart factory - General technical requirements | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | N10 | | Word Count Estimation | 17,170 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 41255-2022: Smart factory - General technical requirements---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Smart factory - General technical requirements
ICS 25.040
CCSN10
National Standards of People's Republic of China
General technical requirements for smart factories
Published on 2022-03-09
2022-10-01 Implementation
State Administration for Market Regulation
Released by the National Standardization Administration
directory
Preface I
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Abbreviations 2
5 General 2
5.1 Overall Framework 2
5.2 Basic elements 3
6 Smart Design 3
6.1 Key elements 3
6.2 Technical requirements5
7 Smart Production 6
7.1 Key elements 6
7.2 Technical requirements7
8 Smart Logistics8
8.1 Key elements 8
8.2 Technical requirements8
9 Smart Management 9
9.1 Key elements 9
9.2 Technical requirements 10
10 System Integration and Optimization 10
10.1 System Integration 10
10.2 Optimization 12
Reference 14
foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
drafted.
Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents.
This document is proposed by China Machinery Industry Federation.
This document is under the jurisdiction of the National Technical Committee on Standardization of Industrial Process Measurement Control and Automation (SAC/TC124).
This document is drafted by. Shanghai Industrial Automation Instrumentation Research Institute Co., Ltd., Nanjing Youbei Electric Technology Co., Ltd., Dongfeng Design and Research Institute
Research Institute Co., Ltd., Electric Power Planning Institute Co., Ltd., Chongqing University of Posts and Telecommunications, Hunan University of Science and Technology, Dongguan Institute of Technology, Machinery Industry Instrumentation
Institute of Comprehensive Technology and Economics, China Electronics Standardization Institute, Shanghai Intelligent Manufacturing Functional Platform Co., Ltd., Shanghai Intelligent Manufacturing
System Innovation Center Co., Ltd., Shenji (Shanghai) Intelligent System R&D Design Co., Ltd., Nanjing University, UFIDA Network Technology Co., Ltd.
Company, Siemens (China) Co., Ltd., Xiamen Yudian Automation Technology Co., Ltd., Zhejiang Zhongtuo Hekong Technology Co., Ltd., Guangzhou Energy Testing
Research Institute, Xinte Energy Co., Ltd., Shanghai Computer Software Technology Development Center, Xi'an Shaangu Power Co., Ltd.
The main drafters of this document. Wang Ying, Wang Jianing, Dong Jian, You Heping, Zhang Jinbin, Huang Qingqing, Wu Lianghong, Zhang Zhaoyun, Wang Chunxi, Wei Sha,
Mei Jun, Chen Tingjiong, Huang Yunying, Chen Chunlin, Lv Xiaofeng, Xu Bin, Su Xiaoli, Chen Haidong, Liu Yajie, Liu Xiong, Wang Ruirong, Zhang Pu, Ma Chuanrong, Zhang Lingyan,
Deng Qinyuan, Wang Chengcheng, He Honghong, Ma Yuanye, Zhang Aisen, Xiao Honglian, Dong Ying.
General technical requirements for smart factories
1 Scope
This document specifies the general principles, intelligent design, intelligent production, intelligent logistics, intelligent management and system integration optimization of smart factories, etc.
content.
This document applies to the operation and management of smart factories in discrete manufacturing.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations
documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to
this document.
GB/T 23331-2020 Energy Management System Requirements and Guidelines for Use
GB/T 24001-2016 Environmental Management System Requirements and Guidelines for Use
GB/T 37393-2019 General technical requirements for digital workshops
GB/T 38129-2019 Smart Factory Security Control Requirements
GB/T 45001-2020 Occupational Health and Safety Management System Requirements and Guidelines for Use
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
smart factory smartfactory
On the basis of the digital factory, use the Internet of Things technology and monitoring technology to strengthen information management and services, improve the controllability of the production process,
Reduce manual intervention on the production line, as well as reasonable planning and scheduling. At the same time, it integrates emerging technologies such as intelligent means and intelligent systems to build efficient,
An energy-saving, green, environmentally friendly and comfortable humanized chemical factory.
[Source. GB/T 38129-2019, 3.1.1]
3.2
Product life cycle productfullifecycle
Including market demand research stage, product development stage, product design stage, product manufacturing stage, sales stage and after-sales service stage
Generic term for the total time of waiting.
[Source. GB/T 18725-2008, 3.206, with modifications]
3.3
equipment managementequipmentmanagement
Taking the equipment as the object, pursuing the overall efficiency of the equipment, applying theories and methods, through technical, economic and organizational measures, to the physical movement of the equipment
Manage the whole process with the value movement.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 41255-2022_English be delivered?Answer: Upon your order, we will start to translate GB/T 41255-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 41255-2022_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 41255-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|