|
US$559.00 · In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 39997-2021: Thermoplastic pipework for underground installation at petrol filling stations Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 39997-2021 | English | 559 |
Add to Cart
|
5 days [Need to translate]
|
Thermoplastic pipework for underground installation at petrol filling stations
| Valid |
GB/T 39997-2021
|
PDF similar to GB/T 39997-2021
Basic data | Standard ID | GB/T 39997-2021 (GB/T39997-2021) | | Description (Translated English) | Thermoplastic pipework for underground installation at petrol filling stations | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | G33 | | Word Count Estimation | 30,362 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 39997-2021: Thermoplastic pipework for underground installation at petrol filling stations---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Thermoplastic pipework for underground installation at petrol filling stations
ICS 83.140.30
CCSG33
National Standards of People's Republic of China
Thermoplastic composite pipe system for buried gas station
Released on 2021-04-30
2021-11-01 implementation
State Administration of Market Supervision and Administration
Issued by the National Standardization Management Committee
Table of contents
Foreword Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 2
4 Material 3
5 Category 3
6 Pipeline design requirements 4
7 Requirements 5
8 Test method 11
9 Inspection rules 20
10 Sign 22
11 Packaging, transportation and storage 23
References 24
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
Drafting.
Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying patents.
This document was proposed by the China National Light Industry Council.
This document is under the jurisdiction of the National Plastics Standardization Technical Committee (SAC/TC48).
Drafting organizations of this document. Shandong Juxing Plastic Industry Co., Ltd., Beijing Research Institute of Chemical Industry of China Petroleum and Chemical Corporation, Ubit Stone
Oil Equipment (Suzhou) Co., Ltd., Jiangsu Faliwo Environmental Technology Co., Ltd., Chinaust Plastic Products Co., Ltd., Shenyang Xinfeiyu Rubber Products
Co., Ltd., Zhejiang Xinda Plastic Pipe Fitting Co., Ltd., Ningbo Yuhua Electric Co., Ltd., Franklin Gas Station General Equipment (Beijing) Co., Ltd.
Company, Kuraray International Trading (Shanghai) Co., Ltd., Borouge Trading (Shanghai) Co., Ltd., Xi'an Sulong Welding Equipment Co., Ltd.
The main drafters of this document. Wu Zhijun, Yang Huijian, Jing Guoqing, Zou Xiaohui, Li Yu, Yang Baosheng, Wang Lijun, Chen Jianqiang, Li Yuanzheng, Song Yuan,
Yu Xinwen, Zhao Feng, Li Yu'e.
Thermoplastic composite pipe system for buried gas station
1 Scope
This document specifies the terms and definitions, materials, classification, working pressure and life,
Requirements, test methods, inspection rules, marking and packaging, transportation and storage.
This document is applicable to thermoplastic plastics and their reinforced/composite pipes, fittings or systems that transport liquid fuel oil and its oil and gas at gas stations
include.
---The positive pressure refueling pipeline from the oil storage tank to the fuel dispenser (using submersible pump pressure) and the negative pressure refueling pipeline (using self-priming tanker);
---The unloading pipeline from the unloading port to the oil storage tank;
---Ventilation and oil and gas recovery pipelines;
---Impermeable jacket pipe.
This document does not apply to liquefied petroleum gas pipelines.
2 Normative references
The content of the following documents constitutes an indispensable clause of this document through normative references in the text. Among them, dated quotations
Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to
This document.
GB/T 1408.2 Insulating material electric strength test method Part 2.Additional requirements for applied DC voltage test
GB/T 2790 Adhesive 180° peel strength test method Flexible material vs. rigid material
GB/T 2791 Adhesive T peel strength test method flexible material vs. flexible material
GB/T 2828.1 Sampling inspection procedure by attributes Part 1.Batch inspection sampling plan retrieved by acceptance quality limit (AQL)
GB/T 2918 Standard environment for condition adjustment and testing of plastic samples
GB/T 5776 Corrosion of metals and alloys. Guidelines for the exposure and assessment of metals and alloys in surface seawater
GB/T 6111 Thermoplastic piping system for fluid transportation-Determination of internal pressure resistance
GB/T 7306.1 55° Sealed Pipe Thread Part 1.Cylindrical Internal Thread and Conical External Thread
GB/T 7306.2 55° Sealed Pipe Thread Part 2.Conical Internal Thread and Conical External Thread
GB/T 8806 Plastic piping system plastic parts size determination
GB/T 9572 Determination of resistance and conductivity of rubber and plastic hoses and hose assemblies
GB/T 16422.2-2014 Plastic laboratory light source exposure test method Part 2.Xenon arc lamp
GB/T 19278-2018 General terms and definitions for thermoplastic pipes, fittings and valves
GB/T 30040.1 Double-layer tank leakage detection system Part 1.General rules
GB/T 30040.2 Double-layer tank leakage detection system Part 2.Pressure and vacuum system
GB/T 30040.7 Double-layer tank leakage detection system Part 7.General requirements for double-layer gaps, anti-leakage linings and anti-leakage jackets
Summation test method
ISO 11922-1 Dimensions and tolerances of thermoplastic pipes for conveying liquids-Part 1.Metric series (Thermoplastics
pipesfortheconveyanceoffluids-Dimensionsandtolerances-Part 1.Metricseries)
ISO 13056 Plastic piping system cold and hot water pressure system vacuum tightness test method (Plasticspipingsystems.
Pressuresystemsforhotandcoldwater-Testmethodforleaktightnessundervacuum)
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 39997-2021_English be delivered?Answer: Upon your order, we will start to translate GB/T 39997-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 39997-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 39997-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|