|
US$229.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 39660-2020: Parameters requirements of logistics facilities and equipment Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 39660-2020 | English | 229 |
Add to Cart
|
3 days [Need to translate]
|
Parameters requirements of logistics facilities and equipment
| Valid |
GB/T 39660-2020
|
PDF similar to GB/T 39660-2020
Basic data | Standard ID | GB/T 39660-2020 (GB/T39660-2020) | | Description (Translated English) | Parameters requirements of logistics facilities and equipment | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | A80 | | Classification of International Standard | 55.180.01 | | Word Count Estimation | 12,115 | | Date of Issue | 2020-12-14 | | Date of Implementation | 2021-07-01 | | Quoted Standard | GB 1589; GB/T 7179; GB/T 8487; GB/T 14405; GB/T 18354 | | Regulation (derived from) | National Standard Announcement No. 28 of 2020 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration | | Summary | This standard specifies the overall requirements for the selection parameters of general logistics facilities and equipment, as well as the parameter requirements for roads, railway loading and unloading lines, storage yards, warehouses, racks, cranes, forklifts, transportation vehicles and loading and unloading platforms. This standard applies to the planning, design and selection of common logistics facilities and equipment that are connected to each other in logistics activities. |
GB/T 39660-2020: Parameters requirements of logistics facilities and equipment---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Parameter requirements for selection of logistics facilities and equipment)
ICS 55:180:01
A80
National Standards of People's Republic of China
Parameter requirements for selection of logistics facilities and equipment
2020-12-14 release
2021-07-01 implementation
State Administration for Market Regulation
Issued by the National Standardization Management Committee
Table of contents
Preface Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 General requirements 2
5 Road 3
6 Railway loading and unloading line 3
7 Yard 4
8 Warehouse 4
9 Shelves 5
10 Crane 5
11 Forklift 6
12 Transport vehicles 6
13 Loading and unloading platform 6
Reference 9
Foreword
This standard was drafted in accordance with the rules given in GB/T 1:1-2009:
This standard was proposed and managed by the National Logistics Standardization Technical Committee (SAC/TC269):
This standard was drafted by: Beijing Jiaotong University, China Federation of Logistics and Purchasing, Beijing Trend Zhongke Logistics Technology Research Institute Co:, Ltd:
The main drafters of this standard: Zhang Xiaodong, Jiang Chaofeng, He Dengcai, Huang Ping, Chen Kai, Yang Hongyan, Ren Yuxuan, Xu Zhongjian, Hu Yiyou, Zeng Rubing,
Lang Maoxiang, Wang Pei, Deng Bin, Zhu Xiaoning, Yu Xuejiao, Lu Yang, He Qingbao, Gong Shibo:
Parameter requirements for selection of logistics facilities and equipment
1 Scope
This standard specifies the overall requirements for the selection parameters of general logistics facilities and equipment, as well as roads, railway loading and unloading lines, storage yards, warehouses, shelves,
Parameter requirements for heavy machinery, forklifts, transport vehicles and loading and unloading platforms:
This standard applies to the planning, design and selection of common logistics facilities and equipment that are connected to each other in logistics activities:
2 Normative references
The following documents are indispensable for the application of this document: For dated reference documents, only the dated version applies to this article
Pieces: For undated references, the latest version (including all amendments) applies to this document:
GB 1589 External dimensions, axle load and mass limits of automobiles, trailers and automobile trains
GB/T 7179 Railway Freight Terminology
GB/T 8487 Port handling terminology
GB/T 14405 General purpose bridge crane
GB/T 18354 Logistics Terminology
3 Terms and definitions
The following terms and definitions defined in GB/T 18354, GB/T 7179, and GB/T 8487 apply to this document:
3:1
Logisticsfacilities
Used for non-movable buildings and structures necessary for logistics activities:
3:2
Logisticsequipment
Equipment and appliances required for logistics activities:
3:3
Logisticsnode
Places used for goods transfer, collection and storage, loading and unloading, handling, packaging, circulation processing and information processing activities:
3:4
Loadingandunloadingrailwaytrack
Railway lines used for various cargo loading and unloading operations:
3:5
Groupofrailwaytracks
The railway operation area is divided into line groups with the same number of lines and the same bundle shape in principle:
3:6
Effective length of railway loading and unloading line effectivelengthofloadingandunloadingrailwaytrack
The length of the railway loading and unloading line that can actually be used for loading and unloading vehicles:
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 39660-2020_English be delivered?Answer: Upon your order, we will start to translate GB/T 39660-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 39660-2020_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 39660-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|