|
US$359.00 ยท In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 38335-2019: Code of operation for photovoltaic power station Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 38335-2019 | English | 359 |
Add to Cart
|
4 days [Need to translate]
|
Code of operation for photovoltaic power station
| Valid |
GB/T 38335-2019
|
PDF similar to GB/T 38335-2019
Basic data | Standard ID | GB/T 38335-2019 (GB/T38335-2019) | | Description (Translated English) | Code of operation for photovoltaic power station | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F12 | | Classification of International Standard | 27.160 | | Word Count Estimation | 18,112 | | Date of Issue | 2019-12-10 | | Date of Implementation | 2020-07-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 38335-2019: Code of operation for photovoltaic power station---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Code of operation for photovoltaic power station
ICS 27.160
F12
National Standards of People's Republic of China
Photovoltaic Power Station Operation Regulations
2019-12-10 release
2020-07-01 implementation
State Administration of Market Supervision
Published by the National Standardization Management Committee
Contents
Foreword III
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 Basic requirements 2
5 Operation control 3
5.1 General requirements 3
5.2 Operational monitoring 3
5.3 Operation 4
6 Inspection and routine maintenance 4
6.1 General requirements 4
6.2 Inspections 4
6.3 Daily maintenance 5
7 Abnormal operation and troubleshooting 5
7.1 General 5
7.2 Abnormal operation and troubleshooting of equipment 6
Appendix A (Normative Appendix) Periodic inspection and inspection cycle of photovoltaic power station equipment 7
Appendix B (Normative Appendix) Inspection and Inspection Contents of Photovoltaic Power Plants 8
Appendix C (Normative Appendix) Special Situation Inspection and Inspection Instructions10
Appendix D (Normative Appendix) Abnormal operation and processing method 11
Appendix E (Normative Appendix) Fault conditions and treatment methods 13
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that some elements of this document may involve patents. The issuer of this document is not responsible for identifying these patents.
This standard is proposed and managed by the China Electric Power Enterprise Federation.
This standard was drafted. TBEA Xinjiang New Energy Co., Ltd.
The main drafters of this standard. Li Hong, Zhang Shengzhong, Pan Jialong, Liu Jiawei, Wang Tingting, Huang Hua, Gao Kaiqiang, Lu Dan, Mai Fajun, Guo Qing, Liu Jia,
Zheng Zhihua and Zhang Mei.
Photovoltaic Power Station Operation Regulations
1 Scope
This standard specifies technical requirements for operation control, patrol inspection, routine maintenance, abnormal operation, and troubleshooting of photovoltaic power stations.
This standard applies to large and medium-sized photovoltaic power stations.
2 Normative references
The following documents are essential for the application of this document. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB 2894 safety signs and guidelines for their use
GB/T 19964 Technical regulations for access to power systems of photovoltaic power stations
GB 26859 Electric Power Safety Working Code Power Line Section
GB 26860 Electrical safety working code Electrical part of power plants and substations
GB/T 29319 Technical requirements for access to distribution network of photovoltaic power generation system
GB/T 31464 Guidelines for grid operation
GB/T 33599 Code for grid-connected operation control of photovoltaic power stations
GB/T 35694 PV power station safety regulations
GB/T 36567 Photovoltaic module maintenance procedures
GB/T 36568 Photovoltaic square array maintenance procedures
GB 50794 Code for Construction of Photovoltaic Power Stations
GB/T 50796 Acceptance Code for Photovoltaic Power Engineering
GB 50797 design code for photovoltaic power stations
DL/T 516 Electricity Dispatching Automation Operation Management Regulations
DL/T 544 Power Communication Operation Management Regulations
DL/T 559 220kV ~ 750kV Power Grid Relay Protection Device Operation Setting Regulations
DL/T 584 3kV ~ 110kV Grid Relay Protection Device Operation Setting Regulations
DL/T 623 Regulations for Operational Evaluation of Relay Protection and Safety Automatic Devices in Power Systems
DL/T 741 Overhead Transmission Line Operation Regulations
DL/T 969 Guidelines for Substation Operation
DL/T 1253 Power cable line operation regulations
NB/T 32012 Technical specifications for real-time monitoring of solar resources in photovoltaic power stations
NB/T 32025 Technical Specifications for Photovoltaic Power Generation Dispatching
NB/T 32037 Specification for File Archiving and File Arrangement of Photovoltaic Power Generation Construction Projects
3 terms and definitions
The following terms and definitions apply to this document.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 38335-2019_English be delivered?Answer: Upon your order, we will start to translate GB/T 38335-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 38335-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 38335-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|