HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189760 (7 Dec 2024)

GB/T 40102-2021 PDF in English


GB/T 40102-2021 (GB/T40102-2021, GBT 40102-2021, GBT40102-2021)
Standard IDContents [version]USDSTEP2[PDF] delivered inName of Chinese StandardStatus
GB/T 40102-2021English165 Add to Cart 0-9 seconds. Auto-delivery. Test code of connecting to power system for solar thermal power plants Valid
Standards related to (historical): GB/T 40102-2021
PDF Preview

GB/T 40102-2021: PDF in English (GBT 40102-2021)

GB/T 40102-2021 GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 27.160 CCS F 12 Test Code of Connecting to Power System for Solar Thermal Power Plants ISSUED ON: MAY 21, 2021 IMPLEMENTED ON: DECEMBER 1, 2021 Issued by: State Administration for Market Regulation; Standardization Administration of the People’s Republic of China. Table of Contents Foreword ... 3  1 Scope ... 4  2 Normative References ... 4  3 Terms and Definitions ... 4  4 Basic Rules ... 5  5 Measuring Instruments ... 5  6 Start-up and Shutdown Tests ... 5  7 Excitation System Parameter Test ... 6  8 PSS Parameter Setting Test ... 6  9 Speed Control System Parameter Test ... 6  10 Generator Leading Phase Test ... 6  11 Primary Frequency Modulation Test ... 7  12 AGC System Test ... 8  13 AVC System Test ... 9  Test Code of Connecting to Power System for Solar Thermal Power Plants 1 Scope This Standard specifies the methods for the start-up and shutdown test, excitation system parameter test, power system stabilizer parameter setting test, speed control system parameter test, generator leading phase test, primary frequency modulation test, automatic power generation control system test and automatic voltage control system test of connecting to power system for solar thermal power plants. This Standard is applicable to thermal storage type of solar thermal power plants using steam turbine generator set. 2 Normative References The content of the following documents constitutes indispensable clauses of this document through normative references in the text. In terms of references with a specified date, only versions with a specified date are applicable to this document. In terms of references without a specified date, the latest version (including all the modifications) is applicable to this document. GB/T 20840.2 Instrument Transformers - Part 2: Additional Requirements for Current Transformers GB/T 20840.3 Instrument Transformers - Part 3: Additional Requirements for Inductive Voltage Transformers GB/T 40103 Technical Requirement of Connecting to Power System for Solar Thermal Power Station DL/T 1167 Guide for Modeling Generator Excitation System DL/T 1231 Guide for Setting Test of Power System Stabilizer DL/T 1235 Guide for Modeling and Testing of Generator’s Prime Mover and Governor DL/T 1523 Guide on Leading Power Factor Operation Test of Synchronous Generator 3 Terms and Definitions The terms and definitions defined in GB/T 40103 are applicable to this document. a) Set the generator set to enter the start-up procedure; b) Actuate the data acquisition device; c) Set the load; on the outlet side of the generator set, continuously measure and record the active power of the entire start-up process; d) Calculate the time for the load to rise to the set value. 6.2 Shutdown Test The test shall be carried out in accordance with the following steps: a) Start the normal shutdown procedure; b) Actuate the data acquisition device; c) On the outlet side of the generator set, continuously measure and record the active power of the entire shutdown process; d) Calculate the load reduction rate. 7 Excitation System Parameter Test The method for the excitation system parameter test of the solar thermal generator set shall comply with the stipulations of DL/T 1167. 8 PSS Parameter Setting Test The method for the PSS parameter setting test of the solar thermal generator set shall comply with the stipulations of DL/T 1231. 9 Speed Control System Parameter Test The method for the speed control system parameter test of the solar thermal generator set shall comply with the stipulations of DL/T 1235. The test conditions should be 30%PN, 65%PN and 90%PN. NOTE: PN is the rated power of the generator set. 10 Generator Leading Phase Test The method for the leading phase test of the solar thermal generator set shall comply with the stipulations of DL/T 1523. The test conditions should be 30%PN, 65%PN and 90%PN. 12 AGC System Test 12.1 Test Conditions Before AGC system performance test, the system shall satisfy the following conditions: a) The error of the load command signal between the grid dispatching and the generator set shall be within ± 0.2%; the transmission of other communication signals shall be normal; b) The logic of the AGC auxiliary control of the generator set shall be correct; c) The main control systems of the generator set shall be operated in an automatic mode. During the test, the primary frequency modulation function of the generator set should be disenabled. 12.2 Stable Load Performance Test The test shall be conducted in accordance with the following steps: a) The stable load performance test shall respectively be carried out within two load ranges: 70%PN ~ 100%PN and 20%PN ~ 40%PN; b) It shall be ensured that within the period of 20 min before the test, and during the test, there shall be no obvious internal and external disturbances in the main control systems of the generator set; c) Actuate the data acquisition device; record the output active power of the generator set; d) Maintain the AGC load command or the generator set’s load command unchanged; the time length of the test shall not be less than 1 h; e) Calculate the steady-state error of the load. 12.3 Variable load performance test The test shall be conducted in accordance with the following steps: a) It shall be ensured that within the period of 20 min before the test, and within the period of 20 min after the end of the test, there shall be no obvious internal and external disturbances in the main control systems (excluding the load command) of the generator set; b) The amplitude of the AGC command change shall be selected between 5%PN ~ 20%PN; c) Actuate the data acquisition device; record the output active power of the ......
 
Source: Above contents are excerpted from the PDF -- translated/reviewed by: www.chinesestandard.net / Wayne Zheng et al.