|
US$519.00 · In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 38275-2019: Lubrication system - Inspection specification Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 38275-2019 | English | 519 |
Add to Cart
|
5 days [Need to translate]
|
Lubrication system - Inspection specification
| Valid |
GB/T 38275-2019
|
PDF similar to GB/T 38275-2019
Basic data | Standard ID | GB/T 38275-2019 (GB/T38275-2019) | | Description (Translated English) | Lubrication system - Inspection specification | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | J21 | | Classification of International Standard | 21.260 | | Word Count Estimation | 26,267 | | Date of Issue | 2019-12-10 | | Date of Implementation | 2020-07-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 38275-2019: Lubrication system - Inspection specification---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Lubrication system inspection specifications)
ICS 21.260
J21
National Standards of People's Republic of China
Lubrication system inspection specifications
2019-12-10 release
2020-07-01 implementation
State Administration of Market Supervision
Published by the National Standardization Management Committee
Contents
Foreword III
1 Scope 1
2 Normative references 1
3 Technical requirements 1
3.1 General requirements 1
3.2 Technical requirements for thin oil lubrication systems 2
3.3 Technical requirements for dry oil lubrication systems 4
3.4 Technical Requirements for Oil Mist Lubrication System 5
3.5 Technical requirements for oil and gas lubrication systems 5
4 Test methods and inspection rules 5
4.1 General Rule 5
4.2 Thin oil lubrication system test methods and inspection rules 5
4.3 Dry oil lubrication system test methods and inspection rules 7
4.4 Test methods and inspection rules for oil mist lubrication systems 8
4.5 Test methods and inspection rules for oil and gas lubrication systems 8
5 Mark inspection and packaging inspection 9
5.1 Mark inspection 9
5.2 Packaging inspection 9
Appendix A (Informative) Lubrication System Reliability Guidelines 10
Appendix B (Informative) Schematic Diagram of Thin Oil Lubrication System 13
Appendix C (informative) Outline drawing of thin oil lubrication system 14
Appendix D (Informative) Schematic diagram of single-line dry oil lubrication system for manual lubrication pump 15
Appendix E (Informative) Schematic diagram of ring-type double-line dry oil lubrication system for electric lubrication pump
Appendix F (Informative) Schematic diagram of oil mist lubrication system 17
Appendix G (Informative) Schematic Diagram of Oil-Gas Lubrication System 18
Appendix H (informative appendix) Factory inspection test record sheet 19 for thin oil lubrication devices
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard was proposed and managed by the National Metallurgical Equipment Standardization Technical Committee (SAC/TC409).
This standard was drafted. Sichuan Chuanrun Hydraulic Lubrication Equipment Co., Ltd., Qidong Lubrication Equipment Co., Ltd., Anhui Zhongtian Petrochemical Co., Ltd.
Co., Ltd., Taiyuan Tongze Heavy Industry Co., Ltd., China National Heavy Machinery Research Institute Corporation.
The main drafters of this standard. Zhu Qiang, Liu Fulan, Wang Xinyu, Wu Guobin, Gao Xiaomou, Gong Xiangrong, Wang Pengfei, Su Jing, Xia Juan.
Lubrication system inspection specifications
1 Scope
This standard specifies the technical requirements, test methods and inspection rules, marking inspection and packaging inspection of the lubrication system.
This standard applies to the inspection of lubrication systems.
2 Normative references
The following documents are essential for the application of this document. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 191 Packaging, storage and transportation icon
GB/T 3287 malleable cast iron pipe connection
GB/T 5277 Fastener bolt and screw through hole
GB/T 9969 General Instructions for Use of Industrial Products
GB/T 13306 signs
GB/T 14436 General rules for industrial product warranty documents
GB 18613 Limit value and energy efficiency rating of small and medium three-phase asynchronous motors
GB/T 19052 Guidelines for the drafting and presentation of noise emission test specifications for acoustic machines and equipment
GB/T 37400.3 General technical requirements for heavy machinery. Part 3. Weldments
GB/T 37400.10 General technical requirements for heavy machinery Part 10. Assembly
GB/T 37400.11 General technical requirements for heavy machinery Part 11. Piping
GB/T 37400.12 General technical requirements for heavy machinery Part 12. Painting
GB/T 37400.13 General technical requirements for heavy machinery Part 13. Packaging
GB 50093 Code for Construction and Quality Acceptance of Automation Instrumentation Engineering
GB 50171 Code for construction and acceptance of electrical equipment installation engineering panel, cabinet and secondary circuit wiring
NB/T 47004.1 Plate heat exchangers. Part 1. Removable plate heat exchangers
NB/T 47007 Air-cooled heat exchanger
NB/T 47045 Brazed plate heat exchanger
3 Technical requirements
3.1 General requirements
3.1.1 The manufacturing and inspection of the lubrication system shall be performed in accordance with the drawings and technical documents approved by the prescribed procedures. Flow requirements and pressures of lubrication systems
Design criteria shall be specified by or agreed with the buyer.
3.1.2 There should be no leakage or leakage in the lubrication system.
3.1.3 The lubrication system should be able to maintain the oil supply temperature at 40 ° C ± 3 ° C.
3.1.4 The sealing material in the lubrication system shall be compatible with the lubrication medium. Seals containing asbestos-free materials should not be used.
3.1.5 All elements of the lubrication system shall have a certificate of compliance.
3.1.6 Each external interface of the lubrication system shall be provided with a matching flange or pipe joint.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 38275-2019_English be delivered?Answer: Upon your order, we will start to translate GB/T 38275-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 38275-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 38275-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|