|
US$359.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 37663.3-2019: Outdoor empirical test requirements for distributed photovoltaic in warm damp climate -- Part 3: Grid-connection photovoltaic system Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 37663.3-2019 | English | 359 |
Add to Cart
|
4 days [Need to translate]
|
Outdoor empirical test requirements for distributed photovoltaic in warm damp climate -- Part 3: Grid-connection photovoltaic system
| Valid |
GB/T 37663.3-2019
|
PDF similar to GB/T 37663.3-2019
Basic data | Standard ID | GB/T 37663.3-2019 (GB/T37663.3-2019) | | Description (Translated English) | Outdoor empirical test requirements for distributed photovoltaic in warm damp climate -- Part 3: Grid-connection photovoltaic system | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | K04 | | Classification of International Standard | 27.160 | | Word Count Estimation | 18,135 | | Date of Issue | 2019-06-04 | | Date of Implementation | 2020-01-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 37663.3-2019: Outdoor empirical test requirements for distributed photovoltaic in warm damp climate -- Part 3: Grid-connection photovoltaic system ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Outdoor empirical test requirements for distributed photovoltaic in warm damp climate--Part 3. Grid-connection photovoltaic system
ICS 27.160
K04
National Standards of People's Republic of China
Wet tropical distributed photovoltaic outdoor empirical test requirements
Part 3. Grid-connected photovoltaic systems
climate-Part 3. Grid-connectionphotovoltaicsystem
Published on.2019-06-04
2020-01-01 implementation
State market supervision and administration
China National Standardization Administration issued
Content
Foreword I
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 sample requirements 2
5 Test cycle, project and equipment requirements 2
6 Solar Energy Empirical Test 4
7 Power generation efficiency empirical test 5
8 Power generation operation empirical test 9
9 Grid performance test 10
10 Test report 11
Appendix A (Normative Appendix) Distributed Grid-Connected Photovoltaic System Information Statistics Table 12
Foreword
GB/T 37663 "Damp Tropical Distributed Photovoltaic Outdoor Test Requirements" is currently divided into three parts.
--- Part 1. Photovoltaic modules;
--- Part 2. Photovoltaic backsheet;
--- Part 3. Grid-connected photovoltaic systems.
This part is the third part of GB/T 37663.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
This part is proposed and managed by the National Technical Committee for Environmental Conditions and Environmental Testing Standardization of Electrical and Electronic Products (SAC/TC8).
This section drafted by. China Electric Apparatus Research Institute Co., Ltd., China Electric Power Research Institute Co., Ltd., Shenzhen City Measurement Quality
Testing Institute, China Quality Certification Center, Longji Leye Photovoltaic Technology Co., Ltd., China Southern Inspection Group Electronic Products Testing (Shenzhen)
Co., Ltd., Hainan Power Grid Co., Ltd. Electric Power Research Institute, Zhuhai Zhongjian Xingye Green Building Design and Research Institute Co., Ltd., Hehai
University, Guangdong Yongguang New Energy Design Consulting Company, Kunming Electrical Apparatus Research Institute, Jiangsu Huilun Solar Energy Technology Co., Ltd., Guangdong Huamao Inspection
Testing Technology Co., Ltd., Shunde Sun Yat-sen University Solar Energy Research Institute, Nanjing Rito Photovoltaic Technology Co., Ltd., Guangdong Zhongguang Energy Investment Co., Ltd.
the company.
The main drafters of this section. Qin Hanjun, Zhang Junjun, Jie Ganxin, Cai Chun, Li Haipeng, Zhu Qiangzhong, Kang Qinyi, Zhao Hailong, Zhang Ling, Ding Mingchang,
Zhang Wei, Sun Yunlin, Zeng Xiang'an, Li Hong, Sun Jianhua, Chen Siming, Huang Kaiyun, Dong Wei, Lu Zhonglin, Li Hongtao, He Yani, Liu Xin, Wang Jianquan, Pang Songling,
Yu Guobao, Zhao Jie, Zhou Qiongfang, Chen Rongrong.
Wet tropical distributed photovoltaic outdoor empirical test requirements
Part 3. Grid-connected photovoltaic systems
1 Scope
This part of GB/T 37663 specifies the outdoor empirical test requirements for distributed grid-connected photovoltaic systems, including the basic requirements for empirical testing.
Seeking and testing methods for solar energy empirical tests, empirical tests for power generation efficiency, empirical tests for power generation operations, and empirical tests for grid-connected performance.
This section applies to the "damp heat" climate zone specified in GB/T 4797.1, which is connected to the grid through the AC380V voltage level, and
The AC10(6)kV voltage level is connected to the user side to build, rebuild and expand the distributed grid-connected photovoltaic system. It is not applicable to the concentrating photovoltaic module group.
A distributed grid-connected photovoltaic system. Large-scale ground-based photovoltaic power plants, as well as grid-connected photovoltaic systems in the “sub-humid tropics” climate zone, can also refer to
carried out.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 4797.1 Classification of environmental conditions Natural environmental conditions Temperature and humidity
GB/T 12326 power quality voltage fluctuations and flicker
GB/T 13126 General technical conditions for wet tropical protective packaging for electromechanical products
GB/T 14549 power quality utility grid harmonics
GB/T 15543 power quality three-phase voltage imbalance
GB/T 17215.322 Particular requirements for measuring equipment - Part 22. Static active energy meters (0.2 S class and 0.5 S
level)
GB/T 20840.2 Transformers - Part 2. Supplementary technical requirements for current transformers
GB/T 20840.3 Transformers - Part 3. Supplementary technical requirements for electromagnetic voltage transformers
GB/T 24337 Power Quality Utility Grid Interharmonics
GB/T 29319 photovoltaic power generation system access to distribution network technical regulations
GB/T 30152 Photovoltaic power generation system access distribution network testing procedures
GB 50343 lightning protection technical specification for building electronic information systems
Temperature and irradiance correction method for measured I-V characteristics of IEC 60891 photovoltaic devices (Photovoltaicdevices-
ProceduresfortemperatureandirradiancecorrectionstomeasuredI-Vcharacteristics)
Photovoltaic devices - Part 1. Measurement of photovoltaic current-voltage characteristics (Photovoltaicdevices - Part 1.
Measurementofphotovoltaiccurrent-voltagecharacteristics)
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
System efficiency
The ratio of the total power generated by a distributed grid-connected photovoltaic system to the total amount of radiation absorbed by the inclined surface of the photovoltaic module during a certain period of time.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 37663.3-2019_English be delivered?Answer: Upon your order, we will start to translate GB/T 37663.3-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 37663.3-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 37663.3-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|