|
US$279.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 37580-2019: Requirements for buried polyethylene (PE) gas pipeline corrosion control engineering life cycle Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 37580-2019 | English | 279 |
Add to Cart
|
3 days [Need to translate]
|
Requirements for buried polyethylene (PE) gas pipeline corrosion control engineering life cycle
| Valid |
GB/T 37580-2019
|
PDF similar to GB/T 37580-2019
Basic data | Standard ID | GB/T 37580-2019 (GB/T37580-2019) | | Description (Translated English) | Requirements for buried polyethylene (PE) gas pipeline corrosion control engineering life cycle | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | A01 | | Classification of International Standard | 03.100.99 | | Word Count Estimation | 14,167 | | Date of Issue | 2019-06-04 | | Date of Implementation | 2020-05-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 37580-2019: Requirements for buried polyethylene (PE) gas pipeline corrosion control engineering life cycle ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Requirements for buried polyethylene (PE)gas pipeline corrosion control engineering life cycle
ICS 03.100.99
A01
National Standards of People's Republic of China
Polyethylene (PE) buried gas pipeline corrosion
Control engineering life cycle requirements
Published on.2019-06-04
2020-05-01 implementation
State market supervision and administration
China National Standardization Administration issued
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard was proposed by the China Petroleum and Chemical Industry Federation.
This standard is under the jurisdiction of the National Anti-corrosion Standardization Technical Committee (SAC/TC381).
This standard was drafted. Ningbo Yuhua Electric Co., Ltd., Anhui Jielante New Material Co., Ltd., China Environmental Protection Corrosion Control Engineering
Technology Research Institute (Beijing) Co., Ltd., Gaoke Building Materials (Xianyang) Pipeline Technology Co., Ltd., Zhejiang Xinda Plastic Pipe Fitting Co., Ltd., Zhejiang Sound
Boguan Valve Industry Co., Ltd., Zhangzhou Xintai Pipe Industry Co., Ltd., Ningbo Lianda Plastic Pipe Fittings Co., Ltd., Zhejiang Yutong Anticorrosion Equipment Co., Ltd.
Division, Zhejiang Jinyu Maple Leaf Pipe Co., Ltd., Ningbo Oulu Pipeline Industry Co., Ltd., Zhuotong Pipeline System (Zhongshan) Co., Ltd., Shanghai Rigo
Technology Group Co., Ltd., Shenyang Zhongke Corrosion Control Engineering Technology Co., Ltd., China Industrial Anti-Corrosion Technology Association.
The main drafters of this standard. Chen Jianqiang, Liu Junfeng, Liu Weiyu, Wang Guang, Wang Guiming, Liu Xinshe, Sun Junhui, Shao Jinxing, Wang Zhongyu,
Tong Zengyao, Ye Yitong, Fu Fangmei, Gu Fanghe, Liu Kaiwei, Ye Fenghui, Wang Xiaogang, Yu Yu, Sun Bin.
Polyethylene (PE) buried gas pipeline corrosion
Control engineering life cycle requirements
1 Scope
This standard specifies the general rules, objectives, corrosion sources, materials, and techniques during the whole life cycle of polyethylene (PE) buried gas pipeline corrosion control engineering.
Technology, development, design, manufacturing, construction and installation, loading and unloading storage and transportation, commissioning, acceptance, test and inspection, maintenance, repair, life extension, resources
Retirement and post-event green environmental protection early warning, documentation and records, assessment of the requirements of the various elements to be controlled.
This standard applies to the management of activities related to the corrosion life control process of polyethylene (PE) buried gas pipelines.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 15558.1 Gas-filled polyethylene (PE) piping systems - Part 1. Pipe
GB/T 15558.2 Gas-filled polyethylene (PE) piping systems - Part 2. Pipe fittings
GB/T 15558.3 Gas-filled polyethylene (PE) piping systems - Part 3. Valves
GB/T 26255.1 Mechanical piping for polyethylene piping systems - Part 1 . Pipes with a nominal outside diameter not exceeding 63 mm
Steel-plastic conversion pipe fittings
GB/T 26255.2 Mechanical piping for polyethylene piping systems - Part 2. Steels for pipes with a nominal outside diameter of more than 63 mm
Plastic conversion pipe fittings
GB/T 29639 Production and business unit production safety accident emergency plan preparation guidelines
GB/T 33314-2016 Corrosion control engineering life cycle general requirements
Technical specification for CJJ63 polyethylene gas pipeline engineering
TSGD2002 Gas Pipeline Welding Technology Rules for Gas
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Polyethylene (PE) buried gas pipeline corrosion control engineering life cycle buriedpolyethylene (PE) gaspipeline
Corrosioncontrolengineeringlifecycle
Corrosion-resistant polyethylene (PE) buried gas pipelines are based on materials and initial surveys, operating conditions, product design and manufacturing, piping design to
Construction, acceptance, operation, maintenance, ambient temperature, service life assessment, scrapping and post-event green environmental treatment of the entire application control process.
3.2
Corrosion source corrosionsource
A general term for various factors that cause or cause corrosion of polyethylene (PE) buried gas pipelines.
4 General
4.1 Polyethylene (PE) buried gas pipeline (hereinafter referred to as pipeline) full life cycle requirements should be throughout the entire life cycle of the pipeline system
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 37580-2019_English be delivered?Answer: Upon your order, we will start to translate GB/T 37580-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 37580-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 37580-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|