HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (25 Oct 2025)

GB/T 36467-2018 English PDF

US$494.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 36467-2018: Reliability growth -- Stress testing for early failures in unique complex systems
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 36467-2018English494 Add to Cart 3 days [Need to translate] Reliability growth -- Stress testing for early failures in unique complex systems Valid GB/T 36467-2018

PDF similar to GB/T 36467-2018


Standard similar to GB/T 36467-2018

GB/T 37283   GB/Z 37150   GB/T 34986   GB/T 43038   GB/T 43037   

Basic data

Standard ID GB/T 36467-2018 (GB/T36467-2018)
Description (Translated English) Reliability growth -- Stress testing for early failures in unique complex systems
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard L05
Classification of International Standard 03.120.01; 03.120.99
Word Count Estimation 26,276
Date of Issue 2018-06-07
Date of Implementation 2019-01-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 36467-2018: Reliability growth -- Stress testing for early failures in unique complex systems


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Reliability growth--Stress testing for early failures in unique complex systems ICS 03.120.01, 03.120.99 L05 National Standards of People's Republic of China Reliability growth Early failure stress tests for specific complex systems (IEC 62429.2007, IDT) Published on.2018-06-07 2019-01-01 Implementation National Market Supervision Administration China National Standardization Administration released Directory Preface I 1 Scope 1 2 Normative references 1 3 Terms, definitions, abbreviations and symbols 2 3.1 Terms and Definitions 2 3.2 Abbreviations 4 3.3 Symbol 4 4 General 5 5 Planning and Implementation of Reliability Growth Tests 6 5.1 Step 1. Determine whether to perform a reliability increase test 6 5.2 Step 2. Failure Criteria and Data Collection 7 5.3 Step 3. Stress Level 7 5.4 Step 4. Failure Analysis and Failure Classification 8 5.5 Step 5. Stop criterion 9 5.6 Step 6. Verification of Repair and Reliability Growth 16 5.7 Step 7. Reports and Feedback 16 Appendix A (Informative) Method 3 - Application Example of Success Rate Test 18 Appendix B (Informative) Method 5 - Application Example of Contrast Permissible Instantaneous Failure Intensity 19 Appendix C (Informative) Method 6 - Application Example for Estimating Residual Potential Failure 21 Reference 22

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard uses the translation method equivalent to using IEC 62429.2007 "Early failure stress test for certain complex systems with increased reliability". The Chinese documents that have a consistent correspondence with the normatively cited international documents in this standard are as follows. ---GB/T 5080.1-2012 Reliability test Part 1. Test conditions and principles of statistical inspection (IEC 60300-3-5. 2001, IDT) ---GB/T 5080.2-2012 Reliability Test Part 2. Test Cycle Design (IEC 60605-2.1994, IDT) Please note that some of the contents of this document may involve patents. The issuing agency of this document does not assume responsibility for identifying these patents. This standard was proposed by the Ministry of Industry and Information Technology of the People's Republic of China. This standard is under the jurisdiction of the National Technical Committee for Reliability and Maintainability of Electrical and Electronic Products (SAC/TC24). This standard was drafted by. Hisense Group Co., Ltd., and the Institute of Electronics and Information Technology Fifth Institute. The main drafters of this standard. Jiang Yuling, Xu Min, Liu Changzhen, clock, Huang Maosheng, Xu Jianping, Wang Wei, Liang Jinyun. Reliability growth Early failure stress tests for specific complex systems

1 Scope

This standard gives guidance on the reliability growth of the final test and acceptance test for a particular complex system, and gives the final test and acceptance. Accelerated test conditions and termination guidelines for testing. "Specific" means there is no relevant information for similar systems, and a small amount of production means The information generated by these tests will have limited effect on future products. This standard applies to the growth of the reliability of repairable complex systems consisting of hardware embedded software and is used to describe the procedures for acceptance testing. The commissioning ensures that the reliability of the delivered system will not be reduced due to coding errors, process errors or manufacturing errors. This standard applies only to the Department The early life cycle of the life cycle does not apply to accidental failures, nor does it apply to loss-of-use failures. This standard can also be used by manufacturers in Prototypes, single systems, or small batch productions are optimized for the duration of the internal production test. This standard applies to large hardware/software systems, but does not include large-scale network systems such as telecommunications and electricity networks because these systems The new parts cannot usually be isolated during the test. This standard does not apply to independent software testing, but its method can be used when embedded software is used to simulate workloads on hardware systems. The test. This standard applies to the reliability of the system before the delivery or delivery of the growth test, the test can be in the manufacturer's or user's site get on. If users use the improved hardware and newer versions of software to perform reliability growth, this standard can be used to guide this growth process. This standard applies to a wide range of fields, but it does not apply to health or safety systems. This standard does not apply to systems covered by IEC 62279 [38].

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article Pieces. For undated references, the latest version (including all amendments) applies to this document. GB/T 2900.13-2008 Electrotechnic terms reliability and quality of service (IEC 60050-191..1990, IDT) IEC 60300-3-5 Reliability Management Part 3-5. Application Guidelines Reliability Test Conditions and Statistical Test Principles (Depend- abilitymanagement-Part 3-5. Applicationguide-Reliabilitytestconditionsandstatisticaltestprinci- Ples) IEC 60605-2 Equipment reliability test - Part 2. Design of test cycle (Equipment reliability test-Part 2. Designoftestcycles) IEC 61163-1.2006 Reliability Stress Screening Part 1. Batch Reworkable Products (Reliabilitystress) screening-Part 1. Repairableassembliesmanufacturedinlots) IEC 61163-2 Reliability Stress Screening Part 2. Electronic Components (Reliabilitystressscreening-Part 2.Elec- Tronic components IEC 61164 Reliability growth statistical test and assessment method (Reliability growth-Statistical testand Estimationmethods) IEC 61710 power function model goodness of fit test and estimation method (Powerlawmodel-Goodness-of-fitandesti- Mationmethods)

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 36467-2018_English be delivered?

Answer: Upon your order, we will start to translate GB/T 36467-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 36467-2018_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 36467-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.