|
US$759.00 ยท In stock Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 36293-2018: Specification of distributed control system for thermal power plant Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 36293-2018 | English | 759 |
Add to Cart
|
6 days [Need to translate]
|
Specification of distributed control system for thermal power plant
| Valid |
GB/T 36293-2018
|
PDF similar to GB/T 36293-2018
Basic data | Standard ID | GB/T 36293-2018 (GB/T36293-2018) | | Description (Translated English) | Specification of distributed control system for thermal power plant | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | P61 | | Classification of International Standard | 27.100 | | Word Count Estimation | 38,324 | | Date of Issue | 2018-06-07 | | Date of Implementation | 2019-01-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 36293-2018: Specification of distributed control system for thermal power plant---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Specification of distributed control system for thermal power plant
ICS 27.100
P61
National Standards of People's Republic of China
Thermal power plant decentralized control system technical conditions
Published on.2018-06-07
2019-01-01 Implementation
National Market Supervision Administration
China National Standardization Administration released
Directory
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Basic regulations 3
5 Hardware and System Software Requirements 4
5.1 System Structure 4
5.2 General requirements 4
5.3 Communication Network 5
5.4 Power Supply 7
5.5 Control Processor (CP) 8
5.6 Input Output Module (I/O) 9
5.7 Man-Machine Interface 10
5.8 Peripheral Equipment 12
5.9 Fieldbus Communication Equipment 13
5.10 Cabinet and Grounding 14
5.11 Spare Parts and Special Tools 15
6 Application Functions and Software 15
6.1 General Requirements 15
6.2 Data Acquisition and Human-Machine Interfaces 16
6.3 Analog Control 18
6.4 Switching and Sequencing Control 22
6.5 boiler furnace safety monitoring system 25
6.6 Common Equipment Control System 27
6.7 Fieldbus Control System 28
7 Technical Documents 29
7.1 Basic Requirements 29
7.2 Hardware Information 29
7.3 System Software Information 29
7.4 Application Software Files 30
7.5 I/O List and Fieldbus Segment Design Data 30
7.6 Other information 30
8 Packaging and Storage 30
8.1 Packaging Requirements 30
8.2 Storage 30
9 Test 31
9.1 Factory Acceptance (FAT) 31
9.2 Site Acceptance 33
9.3 Assessment and Warranty 33
9.4 Availability Test 33
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard is proposed by the China Electricity Council.
This standard is under the jurisdiction of the National Power Plant Process Monitoring and Information Standardization Technical Committee (SAC/TC376).
This standard was drafted by. Xi'an Thermal Power Research Institute Co., Ltd., Huaneng Power International Co., Ltd., Shanghai Xinhua Control Technology Group
Technology Co., Ltd.
The main drafters of this standard. Xiao Yong, Yang Xinmin, Li Hui, Chen Guangyuan, Chen Feng, Ma Jun, Jia Qiangbang, Wei Xiang, Sun Deliang, Hao Defeng.
Thermal power plant decentralized control system technical conditions
1 Scope
This standard specifies the hardware, system software, application functions, data, packaging, storage and acceptance of the distributed control system (DCS) of thermal power plants.
Technical requirements for testing.
This standard is applicable to the DCS (Distributed Control System) of units with a capacity of 300 MW or more in thermal power plants newly built or expanded or expanded.
The DCS of the unit can be implemented by reference.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 2421.1 Electrical and Electronic Products Environmental Testing Overview and Guidelines
GB/T 4208 enclosure protection (IP code)
GB/T 8117.2 Turbine Thermal Performance Acceptance Test Procedure Part 2. Method B Steam Turbine Span of Various Types and Capacity
Accuracy test
GB/T 10184 Power Station Boiler Performance Test Procedures
GB/T 13384 general technical conditions for mechanical and electrical product packaging
GB/T 17214.1 Industrial process measurement and control device working conditions Part 1. Climatic conditions
GB/T 17626.2 Electromagnetic Compatibility Test and Measurement Technology Electrostatic Discharge Immunity Test
GB/T 17626.3 Electromagnetic compatibility test and measurement technology Radio frequency electromagnetic field radiation immunity test
GB/T 17626.4 Electromagnetic Compatibility Test and Measurement Technology Electrical Fast Transient Burst Immunity Test
GB/T 17626.5 Electromagnetic Compatibility Test and Measurement Technology Surge (Shock) Immunity Test
GB/T 17626.8 Electromagnetic Compatibility Test and Measurement Technology Power Frequency Magnetic Field Immunity Test
GB/T 17626.11 Electromagnetic compatibility test and measurement techniques Voltage dips, short interruptions and voltage variations immunity test
GB 17859 Computer Information System Security Protection Rating Division Guidelines
GB/T 18271.3 Methods and procedures for general performance evaluation of process measurement and control devices. Part 3. Tests for the influence of influences
GB/T 26863-2011 Thermal power plant monitoring system terminology
GB/T 30372 Guidelines for Acceptance of Distributed Control Systems for Thermal Power Plants
GB/T 33009.1 Industrial Automation and Control System Network Security Distributed Control System (DCS) Part 1. Protection Requirements
3 Terms and Definitions
The following terms and definitions as defined in GB/T 26863-2011 apply to this document. For ease of use, the following is repeated
Some terms and definitions in GB/T 26863-2011.
3.1
Distributed control system distributedcontrolsystem;DCS
Adopt computer, communication and screen display technology to realize the data collection, control and protection functions of the production process, using communication technology
Data sharing is now a multi-computer monitoring system. Its main features are decentralized functions, centralized operation and display, and data sharing. According to the specific situation
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 36293-2018_English be delivered?Answer: Upon your order, we will start to translate GB/T 36293-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 36293-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 36293-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|