|
US$319.00 ยท In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 36160.2-2018: Technical specification for distributed energy system of combined cooling, heating and power -- Part 2: Power subsystem Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 36160.2-2018 | English | 319 |
Add to Cart
|
4 days [Need to translate]
|
Technical specification for distributed energy system of combined cooling, heating and power -- Part 2: Power subsystem
| Valid |
GB/T 36160.2-2018
|
PDF similar to GB/T 36160.2-2018
Basic data | Standard ID | GB/T 36160.2-2018 (GB/T36160.2-2018) | | Description (Translated English) | Technical specification for distributed energy system of combined cooling, heating and power -- Part 2: Power subsystem | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F01 | | Classification of International Standard | 27.010 | | Word Count Estimation | 16,185 | | Date of Issue | 2018-05-14 | | Date of Implementation | 2018-12-01 | | Regulation (derived from) | National Standards Announcement No. 6 of 2018 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 36160.2-2018: Technical specification for distributed energy system of combined cooling, heating and power -- Part 2: Power subsystem ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Technical conditions for distributed cold and hot electricity energy systems Part 2. Power units)
ICS 27.010
F01
National Standards of People's Republic of China
Distributed cold and heat energy system technical conditions
Part 2. Power unit
Combinedcooling,heatingandpower-Part 2.Powersubsystem
Published on.2018-05-14
2018-12-01 implementation
State market supervision and administration
China National Standardization Administration issued
Foreword
GB/T 36160 "Technical Conditions for Distributed Cooling and Heating Energy System" is divided into the following three parts.
--- Part 1. Refrigeration and heating units;
--- Part 2. Power unit;
--- Part 3. Energy storage unit.
This part is the second part of GB/T 36160.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
This part is proposed and managed by the National Energy System Standardization Technical Committee (SAC/TC459).
This section drafted by. China National Institute of Standardization, China City Gas Association Distributed Energy Professional Committee, Chinese Academy of Sciences Engineering
Institute of Thermal Physics, General Electric (China) Co., Ltd., Shanghai Aerospace Energy Co., Ltd., Huadian Electric Power Research Institute, Shanghai Transportation
the University.
The main drafters of this section. Liu Meng, Cheng Jianhong, Huang Wei, Tang Fang, Zhang Yang, Wang Song, Ma Mingming, Han Wei, Liu Ren, Chen Lili, Song Zhigang,
Fan Wei, Shi Lei.
Distributed cold and heat energy system technical conditions
Part 2. Power unit
1 Scope
This part of GB/T 36160 specifies the classification of power units for distributed cold and heat energy systems based on gas or liquid fuels.
Composition, selection design, operation and management.
This section is applicable to the selection and design of power units of distributed cold and heat energy systems using gas or liquid fuel as the motive force.
And operational management.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 1883.1 Reciprocating internal combustion engines - Vocabulary Part 1. Engine design and operational terms
GB/T 2820.1 Reciprocating internal combustion engine driven alternators - Part 1.
GB/T 2900.46 electrician terminology steam turbine
GB/T 2900.48 electrician terminology boiler
GB/T 15135 gas turbine vocabulary
Energy saving rate of GB/T 33757.1 distributed thermal power systems - Part 1. Fossil energy drive systems
GB 50049-2011 Small thermal power plant design specification
GB/T 36160.1-2018 Technical requirements for distributed thermal energy systems - Part 1 . Refrigeration and heating units
Technical specification for design of DL5000-2000 thermal power plant
DL/T 5174 Gas-Steam Combined Cycle Power Plant Design Regulations
3 Terms and definitions
GB/T 2820.1, GB/T 2900.46, GB/T 2900.48, GB/T 1883.1, GB/T 15135, GB/T 33757.1
And the following terms and definitions apply to this document.
3.1
Gas turbine generator set gasturbinepowergenerationset
This includes gas turbine power units, generators, and auxiliary equipment to ensure that the system can perform its set functions.
3.2
Micro gas turbine generator set microturbinepowergenerationset
This includes microturbines, generators, and auxiliary equipment to ensure that the system can perform its set functions.
3.3
Steam turbine generator set steamturbinepowergenerationset
This includes steam turbines, generators, and auxiliary equipment to ensure that the system can perform its set functions.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 36160.2-2018_English be delivered?Answer: Upon your order, we will start to translate GB/T 36160.2-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 36160.2-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 36160.2-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|