HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 36045-2018 English PDF

US$199.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 36045-2018: Supervision specification of unit capacity expansion retrofit for coal-fired power plants
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 36045-2018English199 Add to Cart 3 days [Need to translate] Supervision specification of unit capacity expansion retrofit for coal-fired power plants Valid GB/T 36045-2018

PDF similar to GB/T 36045-2018


Standard similar to GB/T 36045-2018

GB/T 36278   GB/T 36050   GB/T 33592   GB/T 28583   

Basic data

Standard ID GB/T 36045-2018 (GB/T36045-2018)
Description (Translated English) Supervision specification of unit capacity expansion retrofit for coal-fired power plants
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F20
Classification of International Standard 27.100
Word Count Estimation 10,145
Date of Issue 2018-03-15
Date of Implementation 2018-10-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 36045-2018: Supervision specification of unit capacity expansion retrofit for coal-fired power plants


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Supervision specification of unit capacity expansion retrofit for coal-fired power plants ICS 27.100 F20 National Standards of People's Republic of China Coal-fired thermal power plant regulation Published by.2018-03-15 2018-10-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Administration released Directory Preface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Prerequisites for capacity increase of coal-fired thermal power units 2 5 Capacity verification of coal-fired thermal power units after capacity expansion 6 Performance and Operation Requirements after Capacity Expansion of Coal-fired Thermal Power Units 3 7 Declaration and Approval of Capacity-Enhancing Reform of Coal-fired Thermal Power Units 4 Reference 5

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard was proposed by the National Energy Administration. This standard is under the jurisdiction of the National Electric Power Supervision Standardization Technical Committee (SAC/TC296). This standard was drafted by. Hunan Energy Regulatory Office of the National Energy Administration, Changsha University of Science and Technology, and Hunan Branch of China Resources Power Investment Co., Ltd. Hunan Provincial Electric Power Corporation, China Datang Corporation, Datang Huayin Electric Power Co., Ltd., China Datang Corporation Science and Technology Research Institute Limited Huadong Branch of the company, Datang Northeast Electric Power Test Institute Co., Ltd. The main drafters of this standard. Ye Ze, Yan Xiaozhong, Xiao Weiguo, Wang Shuqi, Hou Zhen, Dai Chengwei, Li Yinglong, Zhou Renjun, Zeng Weisheng, Li Jianhua, Zhang Long, Zhang Hui, Chen Shengli, Gui Feng, Yan Shengqi.

Introduction

In recent years, the capacity expansion of coal-fired thermal power units has generally been carried out throughout the country. There are two main motives for power generation companies to implement capacity expansion. First, under the planned system, increasing the capacity of the unit can be used to obtain more power generation plan targets, so as to obtain additional benefits; Capacity transformation, increase power generation output, reduce coal consumption and improve economic efficiency. The motivation is different, and the operation method and the final effect of implementing the capacity expansion reform are not with. Due to the lack of a unified regulatory standard, the increase in capacity of units has emerged in operational procedures, technical indicators, safe operation, and practical results. Problems, such as capacity expansion of some units can only be operated in a short period of time under certain operating conditions, poor economic performance, large life loss, primary frequency modulation capability and phase-in operation The capacity has dropped significantly. In order to ensure the orderly expansion of the scientific and normative regulations for increasing capacity and to ensure the safe and economical operation of the power system, the Based on the relevant technical standards of the electric power industry and the laws and regulations of electric power supervision, the regulatory standards for the expansion of coal-fired thermal power units have been formulated. Coal-fired thermal power plant regulation

1 Scope

This standard stipulates the applicable scope, modification conditions, capacity test and performance requirements and capacity of the capacity-increasing transformation of coal-fired thermal power units. Appraisal of regulatory technical indicators and methods in such areas. This standard applies to the regulation of the expansion of coal-fired thermal power units.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article Pieces. For undated references, the latest version (including all amendments) applies to this document. GB/T 18149 centrifugal pump, mixed flow pump and axial pump hydraulic performance test specification GB/T 30370 Primary frequency modulation test and performance acceptance guide for thermal power generating units GB 50660 Design Specification for Large and Medium-sized Thermal Power Plants Field Performance Test of DL/T 469 Power Station Boiler Fan DL/T 711 Turbine Regulation Control System Test Guidelines DL/T 1166 Field Test Guide for Large Generator Excitation System DL/T 1210 Thermal power plant automatic power generation control performance test acceptance procedures DL/T 1235 synchronous generator prime mover and its regulation system parameters measurement and modeling guidelines DL/L1523 Synchronous Generator Phase Test Guidelines DL/T 5295 Regulations for Acceptance and Evaluation of Commissioning Quality of Units for Thermal Power Generation Construction Engineering

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 Capacity expansion capacityexpansionrefit The power generation enterprises upgrade the coal-fired thermal power units to increase the generating capacity of the units and realize energy conservation and consumption reduction. 3.2 Coal consumption coalconsumptionofpowersupply In the statistical calculation period, the average amount of standard coal consumed by each generating unit to provide 1kWh of electrical energy is calculated according to formula (1). Bg= Ηg×ηgd×ηq×29307×(100-Lfcy) ×1011 (1) In the formula. Bg --- Coal consumption for power supply in grams of standard coal per kilowatt-hour (gce/kWh); Lfcy---power plant electricity rate, expressed as a percentage (%); Ηg --- boiler efficiency, expressed as a percentage (%); Ηq --- turbine efficiency, expressed as a percentage (%); Ηgd --- Pipe efficiency, expressed as a percentage (%).

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 36045-2018_English be delivered?

Answer: Upon your order, we will start to translate GB/T 36045-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 36045-2018_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 36045-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.