US$519.00 · In stock Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 34925-2017: On-site inspections method of a.c. circuit systems for 110 kV substations on plateau Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 34925-2017 | English | 519 |
Add to Cart
|
6 days [Need to translate]
|
On-site inspections method of a.c. circuit systems for 110 kV substations on plateau
| Valid |
GB/T 34925-2017
|
PDF similar to GB/T 34925-2017
Basic data | Standard ID | GB/T 34925-2017 (GB/T34925-2017) | | Description (Translated English) | On-site inspections method of a.c. circuit systems for 110 kV substations on plateau | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | K04 | | Classification of International Standard | 29.020 | | Word Count Estimation | 26,284 | | Date of Issue | 2017-11-01 | | Date of Implementation | 2018-05-01 | | Regulation (derived from) | National Standard Announcement 2017 No. 29 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 34925-2017: On-site inspections method of a.c. circuit systems for 110 kV substations on plateau ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
On-site inspections method of accircuit systems for 110 kV substations on plateau
ICS 29.020
K04
National Standards of People's Republic of China
Plateau 110kV substation
AC loop system on-site inspection methods
Posted.2017-11-01
2018-05-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Preface Ⅰ
Introduction Ⅱ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 test conditions 2
4.1 Test environmental conditions 2
4.2 Test power supply benchmark conditions and tolerances 2
4.3 Substation AC circuit test conditions 2
4.4 The main test equipment 2
5 pilot project and test sequence 3
5.1 Test Project 3
5.2 Test sequence 3
6 test methods 3
6.1 General 3
6.2 a circuit check 3
6.3 secondary circuit inspection 4
6.4 AC current loop of the system test 5
6.5 AC voltage loop system test 7
6.6 Inspection Process Requirements 7
Appendix A (informative) DC current loop resistance test record table 8
Appendix B (informative) voltage secondary circuit DC resistance test record 9
Appendix C (Normative) Transformer short-circuit impedance estimation method 10
Appendix D (Normative) AC circuit inspection diagram 13
Appendix E (informative) AC current loop system test record table 16
Appendix F (Normative) AC current loop verification current conversion method 17
Appendix G (informative) AC voltage loop system test records Table 19
Appendix H (Normative) AC voltage loop test secondary voltage conversion method 20
Appendix I (Normative) Substation AC circuit system inspection process 21
References 22
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard proposed by the China Electrical Equipment Industry Association.
This standard by the National Highland Electrical Products Environmental Technology Standardization Technical Committee (SAC/TC330) centralized.
This standard was drafted unit. Yunnan Power Grid Co., Ltd., Kunming Electric Institute of Science and Technology, Anhui Senyuan Electric Co., Ltd., Yunnan Province
Substation Engineering Company, Yunnan Electric Power Research Institute (Group) Co., Ltd., Yunnan Power Grid Co., Ltd. Electric Power Research Institute, Hunan Power
Detector Co., Ltd., Xi'an High Voltage Apparatus Research Institute Co., Ltd., Chongqing University, State Grid Sichuan Electric Power Company Electric Power Research
Hospital, Guangdong Yuanguang Cable Industrial Co., Ltd., Beijing Career Distribution Automation Co., Ltd., Beijing Tianyuan Branch wind power technology limited liability
Company, Wuhan Branch of China Electric Power Research Institute, State Grid Qinghai Electric Power Company Electric Power Research Institute, Shanghai Jiao Tong University, China Yangtze River Tri
Gap Group Corporation, Chuan Kai Electric Co., Ltd., Hunan Hunan Electric Power Industry Co., Ltd. to power, Changsha City, Yue Tai Technology Development Co., Ltd., cloud
Nannengtou Natural Gas Industry Development Co., Ltd., Yunnan Nengteisi Visech Co., Ltd., Xuchang Cape Detecting Technology Co., Ltd., Yunnan
Electrical and Mechanical Vocational and Technical College, Shenzhen Electrical Science and Technology Institute.
The main drafters of this standard.Chen Yong, Tian Enwen, Li Hong, Jin Weiping, Chen Ying, fruit ceremony, Sun Shuangcheng, Wu Xiqiu, Cheng Ying, Lee Ben-yu,
Yang Jizhu, Xue Zhengshan, Jiang Xingliang, Liang Shibin, Ma Yi, Wang Ke, Zhang Zhijin, Fan Songhai, Gan Degang, Ye Zubiao, Cai Zhongguang, Jiang Lu Si, Yang Juan,
Yang Zhihong, Tu Hailong, Zhang Xueli, Chen Guoping, Bai Yubao, Ning Qiaozhen, Wang Zhixin, Xu Tao, Wang Benjin, Kang Jun, Li Quanxi, wave, horsepower,
Ji Guanghui, Li Guozhong, Liu Wengen, Yi Liang, Zhang Zhanjun, Xiao Minying, Chen Xinmei.
Introduction
This standard to test the plateau 110kV substation current transformer and voltage transformer primary circuit, secondary circuit wiring, and meter
Volume, measurement, protection and other AC circuits for the purpose of the correctness of each other. To regulate the plateau 110kV substation AC loop test
Method to avoid the system during operation and during operation due to polarity and ratio error caused by incorrect protection relay action, which brought to the grid
Safe operation of the risk and improve the safe and stable substation operation, specially formulated this standard.
Plateau 110kV substation
AC loop system on-site inspection methods
1 Scope
This standard specifies the content, methods and requirements of on-site inspection of AC circuit of 110kV substation in high altitude area.
This standard applies to the altitude of 1000m ~ 5000m area, new or renovation of conventional substation project, guide the exchange before the operation of the circuit
On-site inspection Digital substation project can be used for reference.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 16927.1 high voltage test techniques - Part 1. General definitions and test requirements
GB/T 16927.2 high voltage test techniques - Part 2. Measurement system
GB/T 20626.1 special environmental conditions Highland Electrical and Electronic Products Part 1. General technical requirements
GB/T 20645 Special environmental conditions Low voltage electrical equipment for use on the plateau
GB 50150 electrical installations installation of electrical equipment handover test standards
DL/T 474 (all parts) site insulation test implementation guidelines
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
AC circuit accircuit
Substation AC current loop and AC voltage loop.
3.2
AC current loop accurrentcircuit
Substation AC current loop and AC secondary current loop.
AC primary current circuit refers to the main transformer, circuit breakers, disconnectors, bus, current transformer primary winding and other equipment and circuit order
Connection combination.
AC secondary current circuit refers to the current transformer secondary winding, secondary cable, terminal box, screen cabinet terminal block, cable, gateway measurement, following
Electrical protection and monitoring devices such as secondary equipment and loop the orderly connection portfolio.
3.3
AC voltage circuit acvoltagecircuit
Substation AC primary voltage and AC secondary voltage circuits.
Exchange a voltage circuit refers to the main transformer, circuit breakers, disconnectors, bus, voltage transformer primary winding and other equipment and circuits are
Sequence connection combination.
AC secondary voltage circuit refers to the voltage transformer secondary winding, secondary cable, terminal box, cabinet terminal block, cable, relay protection
And monitoring devices such as secondary equipment and loop the orderly connection combination.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 34925-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 34925-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 34925-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 34925-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|