|
US$279.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 34029-2017: Boiler furnace maintenance elevating platform Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 34029-2017 | English | 279 |
Add to Cart
|
3 days [Need to translate]
|
Boiler furnace maintenance elevating platform
| Valid |
GB/T 34029-2017
|
PDF similar to GB/T 34029-2017
Basic data | Standard ID | GB/T 34029-2017 (GB/T34029-2017) | | Description (Translated English) | Boiler furnace maintenance elevating platform | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | J80 | | Classification of International Standard | 53.020.99 | | Word Count Estimation | 14,199 | | Date of Issue | 2017-07-12 | | Date of Implementation | 2018-02-01 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 34029-2017: Boiler furnace maintenance elevating platform---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Boiler furnace maintenance elevating platform
ICS 53.020.99
J80
National Standards of People's Republic of China
Boiler furnace lifting platform
2017-07-12 Posted
2018-02-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 classification and model 2
5 technical requirements 4
6 test methods 7
7 inspection rules 8
8 logo, packaging, transportation, storage 9
Appendix A (informative) maintenance platform test record table 10
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard is proposed by the China Machinery Industry Federation.
This standard by the National Working Platform Standardization Technical Committee (SAC/TC335) centralized.
This standard was drafted unit. Nanjing Chenguang Group Co., Ltd., Nanjing Special Equipment Safety Supervision and Inspection Institute, in the United States (North
Beijing) Science and Technology Co., Ltd., Beijing Research and Development Machinery Technology Co., Ltd., Jiangsu Nian Jian Electrical and Mechanical Industry Group Co., Ltd., Wuxi Xiong Yu Group hanging
Blue Machinery Manufacturing Co., Ltd., Tin Machinery Co., Ltd., Sekaar (Beijing) Industrial Technology Co., Ltd., high-altitude mechanical engineering and Technology Research Institute
Co., Ltd., Beijing Institute of Construction Machinery, China Construction Education Association Construction Machinery Vocational Education Committee.
The main drafters of this standard.Zhao Yibao, Feng Yuegui, Liu Zhixin, Zhang Jiping, Hu Sen, Xie family, Wu Jie, Wang Haifeng, Yu Hui industry, Gao Xinzhong,
Wu Xiangsheng, Liu Yafeng, Wang Dugen, Yin Wenjing, Liu Chenghuan, Lu Weitao.
Boiler furnace lifting platform
1 Scope
This standard specifies the boiler furnace lifting platform (hereinafter referred to as "maintenance platform") classification, type, technical requirements, test methods, seized
Inspection rules, signs, packaging, transportation and storage.
This standard applies to boiler furnace lifting platform.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
Safety code for tower cranes GB 5144-2006
GB/T 5972 crane rope maintenance, maintenance, installation, inspection and scrap
GB/T 8918 important purpose wire rope
GB/T 13306 signs
GB/T 13384 mechanical and electrical product packaging General technical conditions
GB/T 19155-2017 high-altitude operation basket
GB/T 21974 YZRW series of lifting and metallurgical eddy current brake winding rotor three-phase asynchronous motor technical conditions
GB/T 26557 cage with a vertical orientation of the dual-use construction and lifts
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Suspension device erected on the top of the boiler, powered by the boiler along the vertical wall up and down the operation for the boiler furnace overhaul operation is very
Equipment.
3.2
Furnace platform platforminfurnace
Raise and descend in the interior of the boiler hearth, with guardrails in the periphery for boiler operators to carry workers, tools and materials for furnace repairs
Work platform.
3.3
Suspension suspensionrigs
A device used to suspend the furnace platform as part of the equipment.
3.4
Working wire rope suspensionrope
Suspension wire rope
Bear rope suspension load.
3.5
Safety ropes secondaryrope
Backup wire rope
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 34029-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 34029-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 34029-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 34029-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|