HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 31960.2-2015 English PDF

US$319.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 31960.2-2015: Technical specification of power energy efficiency monitoring system -- Part 2: Function specification of master station
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 31960.2-2015English319 Add to Cart 3 days [Need to translate] Technical specification of power energy efficiency monitoring system -- Part 2: Function specification of master station Valid GB/T 31960.2-2015

PDF similar to GB/T 31960.2-2015


Standard similar to GB/T 31960.2-2015

GB/T 36050   GB/T 36278   GB/T 33592   GB/T 31960.11   GB/T 31960.9   GB/T 31960.10   

Basic data

Standard ID GB/T 31960.2-2015 (GB/T31960.2-2015)
Description (Translated English) Technical specification of power energy efficiency monitoring system -- Part 2: Function specification of master station
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F20
Classification of International Standard 27.010
Word Count Estimation 15,179
Date of Issue 2015-09-11
Date of Implementation 2016-04-01
Quoted Standard GB/T 18020-1999; GB/T 15316-2009; GB/T 31960.8
Regulation (derived from) National Standard Announcement 2015 No.25
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard specifies the general requirements, functions and technical requirements of the national master station and provincial and municipal master stations. This standard is applicable to the design, development, construction, operation and management of the national master station and provincial and municipal master stations.

GB/T 31960.2-2015: Technical specification of power energy efficiency monitoring system -- Part 2: Function specification of master station


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification of power energy efficiency monitoring system - Part 2. Function specification of master station ICS 27.010 F20 National Standards of People's Republic of China Electricity Energy Efficiency Monitoring System Technical Specifications Part 2. Specification master function Part 2. Functionspecificationofmasterstation Issued on. 2015-09-11 2016-04-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅲ 1 Scope 1 2 Normative references 1 3 1 Functional Architecture 2 4 Functional requirements 5 Technical requirements 9

Foreword

GB/T 31960 "Energy Efficiency Power Monitoring System technical specifications" is divided into 13 parts. --- Part 1. General; --- Part 2. Master the functional specification; --- Part 3. communication protocols; --- Part 4. sub-station functional design specifications; --- Part 5. master design guidelines; --- Part 6. Power and energy-efficient centralized information exchange terminal technical conditions; --- Part 7. Energy Efficiency Power monitoring terminal technical conditions; --- Part 8. Security specification; --- Part 9. system test specification; --- Part 10. Power of energy efficiency monitoring terminal test specifications; --- Part 11. Power and energy-efficient centralized information exchange terminal test specifications; --- Part 12. Construction specification; --- Part 13. Field handheld device specifications. This section GB/T Part of 231,960. This section drafted in accordance with GB/T 1.1-2009 given rules. Please note that some of the content of this document may involve patents. Release mechanism of the present document does not assume responsibility for the identification of these patents. This section is proposed and managed by the China Electricity Council. This part of the main drafting units. China Electric Power Research Institute, Nanjing NARI Group Corporation Communications and Technology Branch of electricity, the Chinese people National Development and Reform Commission of the Republic, the State Grid Corporation, China Southern Power Grid Corporation, State Grid Power Company in Gansu Province. The main drafters of this section. Guo Bingqing, Zhong, Feng Bao Cai, Xin Xia, HE Sheng, Zhang Jun, Wang He, Li Jie, Zhang Jianhua, Miao Chang Hai, Wang Hao. Electricity Energy Efficiency Monitoring System Technical Specifications Part 2. Specification master function

1 Scope

GB/T 31960 provisions of this part of the national and provincial master, master of the municipal general requirements, functional and technical requirements. This section applies to a national design master station and the provincial and municipal master, development, construction, operation and management.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 18020-1999 Information technology application level firewall security technology requirements GB/T 15316-2009 General principles for monitoring energy efficiency GB/T 31960.8 electricity monitoring system energy efficiency Technical specifications - Part 8. Security Specification

3 Functional Architecture

Master Master is divided into national, provincial and municipal master. National master data collection and analysis of provincial, municipal master for countries DSM target responsibility assessment to provide evidence And policy makers to provide decision support. Provincial, municipal master is responsible for the implementation and management of services related to energy efficiency under the jurisdiction of the regional electricity consumption, bringing together power users the power of energy efficiency information Etc., are analyzed for intra-regional demand side management target responsibility assessment provide the basis for policy development and decision support. Simultaneously, Provide application services for the power user, energy services and other objects. Provincial, municipal master all kinds of electrical quantities of electricity users, non-electrical quantities and other relevant parameters for automatic acquisition or manual entry while The aggregated data is uploaded to a national master, forming massive data resources the system. System function architecture shown in Figure 1.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 31960.2-2015_English be delivered?

Answer: Upon your order, we will start to translate GB/T 31960.2-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 31960.2-2015_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 31960.2-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.