HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 31960.9-2016 English PDF

US$539.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 31960.9-2016: Technical specification of power energy efficiency monitoring system -- Part 9: System testing specification
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 31960.9-2016English539 Add to Cart 5 days [Need to translate] Technical specification of power energy efficiency monitoring system -- Part 9: System testing specification Valid GB/T 31960.9-2016

PDF similar to GB/T 31960.9-2016


Standard similar to GB/T 31960.9-2016

GB/T 36050   GB/T 36278   GB/T 33592   GB/T 31960.13   GB/T 31960.12   GB/T 31960.11   

Basic data

Standard ID GB/T 31960.9-2016 (GB/T31960.9-2016)
Description (Translated English) Technical specification of power energy efficiency monitoring system -- Part 9: System testing specification
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F20
Classification of International Standard 27.010
Word Count Estimation 27,258
Date of Issue 2016-04-25
Date of Implementation 2016-11-01
Regulation (derived from) National Standard Announcement No
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 31960.9-2016: Technical specification of power energy efficiency monitoring system -- Part 9: System testing specification


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification of power energy efficiency monitoring system - Part 9. System testing specification ICS 27.010 F20 National Standards of People's Republic of China Technical specification for power efficiency monitoring system Part 9. System inspection specifications Part 9. Systemtestingspecification 2016-04-25 released 2016-11-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released Directory Preface I 1 Scope 1 2 normative reference document 1 3 Test Method 1

4 inspection rules

Foreword

GB/T 31960 "power efficiency monitoring system technical specifications" is divided into 13 parts. - Part 1. General; - Part 2. Master function specification; - Part 3. Communication protocols; - Part 4. Design specifications for sub - station functions; - Part 5. Design guidelines for master stations; - Part 6. Power efficiency information concentration and interactive terminal technical conditions; - Part 7. Technical requirements for power efficiency monitoring terminals; - Part 8. Safety precautions; - Part 9. System inspection specifications; - Part 10. Code for terminal inspection of electrical energy efficiency monitoring; - Part 11. Power efficiency information centering and interactive terminal inspection specification; - Part 12. Code of construction; Part 13. Technical specifications for on - site hand - held devices. This part is part 9 of GB/T 31960. This part is drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of the contents of this document may involve patents. The issuer of this document does not assume responsibility for the identification of these patents. This part of the China Electricity Council and put forward and centralized. This part of the drafting unit. China Electric Power Research Institute, Jiangsu Lianhong Automation Systems Engineering Co., Ltd., Guangdong Yu Yu Technology Co., Ltd. Division, State Grid Corporation, Shanghai Synergy Technology Co., Ltd., Nanjing Linyang Electric Power Technology Co., Ltd., Nanjing Xinlian Energy Technology Co., Ltd. Any company, Shanghai Huaguan electronic equipment limited liability company, Wisheng Group Co., Ltd., Sichuan Venus Shu Da Electric Co., Ltd., Hangzhou Haixing Power Technology Co., Ltd., Suzhou Taigu Electric Power Co., Ltd., Beijing Energy Conservation and Environmental Protection Center. The main drafters of this part. Zhong Ming, Wang Qunjun, Wen Hui, Wang He, Yan Huaguang, Li Jie, Zhang Xinghua, Wen Hui, Zhang Bing, Dong Lijun, Li Li, Geng Yuhong, Li Xianhuai, Lin Bai, Jiang Limin, Chen Song Song, Zhang Xiangcheng, Qin Jianrong, Zhao Zhijun. Technical specification for power efficiency monitoring system Part 9. System inspection specifications

1 Scope

This part of GB/T 31960 specifies the inspection method and inspection rules of the power efficiency monitoring system and does not specify the specific Product for inspection requirements. This part is applicable to the function and performance of main station, sub-station, power efficiency data acquisition subsystem and its communication network of electric energy efficiency monitoring system. test.

2 normative reference documents

The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document. Information security - Technical information systems - Safety level - Basic requirements for protection GB/T 22239-2008 Technical specification for power efficiency monitoring system - Part 1. General principles GB/T 31960.1 GB/T 31960.2 Technical specification for power efficiency monitoring systems - Part 2. Master station specification Technical specification for power efficiency monitoring system - Part 3. Communication protocol GB/T 31960.3 GB/T 31960.4 Technical specification for power efficiency monitoring system - Part 4. Design specification for substation function GB/T 31960.5 Technical specification for power efficiency monitoring system - Part 5. Guidelines for master station design GB/T 31960.8 Technical specification for power efficiency monitoring systems - Part 8. Safety precautions GB/T 31960.11-2016 Technical specification for power efficiency monitoring system - Part 11. Power efficiency information center and interactive terminal Test specification

3 test method

3.1 General provisions 3.1.1 inspection content The system inspection shall include the following. a) national master station function and performance; b) provincial and municipal master station functions and performance; c) sub-station function and performance; d) Power efficiency data acquisition subsystem function and performance. 3.1.2 Inspection system 3.1.2.1 The contents of the system The system should include the following. a) national master station and its communication network;

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 31960.9-2016_English be delivered?

Answer: Upon your order, we will start to translate GB/T 31960.9-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 31960.9-2016_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 31960.9-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.