HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 31897.1-2015 English PDF

US$374.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 31897.1-2015: Luminaire performance -- Part 1: General requirements
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 31897.1-2015English374 Add to Cart 3 days [Need to translate] Luminaire performance -- Part 1: General requirements Valid GB/T 31897.1-2015

PDF similar to GB/T 31897.1-2015


Standard similar to GB/T 31897.1-2015

GB/T 7000.204   GB/T 7000.201   GB/T 9473   GB/T 24461   GB 43472   GB/T 31897.201   

Basic data

Standard ID GB/T 31897.1-2015 (GB/T31897.1-2015)
Description (Translated English) Luminaire performance -- Part 1: General requirements
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard K72
Classification of International Standard 29.140.50
Word Count Estimation 19,119
Date of Issue 2015-09-11
Date of Implementation 2016-04-01
Regulation (derived from) National Standard Announcement 2015 No.25
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 31897.1-2015: Luminaire performance -- Part 1: General requirements

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Luminaire performance - Part 1. General requirements ICS 29.140.50 K72 National Standards of People's Republic of China Lighting performance - Part 1. General requirements (IEC 62722-1.2014, IDT) Issued on. 2015-09-11 2016-04-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅲ Introduction Ⅳ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 2 General requirements 5 lamps and light source part 3 6 3 Photometric data 7 Electrical Parameters Data 3 8 lamp efficacy data 3 Environmental data 9 3 9.1 Material Information 3 Maintenance instructions 4 9.2 Removal instructions 4 9.3 Appendix A (informative) international and regional standards for the use of 5 Measurement methods Appendix B (normative) lamps total power and associated power 6 Maintenance and lamp life during Appendix C (informative) statements ending life symbol recovery step 8 Annex D (normative) luminaire photometric distribution data 9 Reference 12

Foreword

GB/T 31897 "lighting performance" will be part of the general requirements and specific requirements for parts, the part of the Japanese publication, published GB/T 31897 in parts as follows. --- Lighting performance - Part 1. General requirements. This section GB/T Part of 131,897. This section drafted in accordance with GB/T 1.1-2009 given rules. This section uses the translation method is equivalent to using IEC 62722-1.2014 "lighting performance - Part 1. General requirements." Consistency correspondence between this part of international documents and normative references of our files are as follows. --- GB 7000.1-2015 Luminaires - Part 1. General requirements and tests (IEC 60598-1.2014, IDT); (All parts) --- GB 7000 Part 2 Luminaires - Part 2 Particular requirements [IEC 60598-2 (all parts)]; --- GB 7000.2-2008 Luminaires - Part 2-22. Particular requirements for emergency lighting (IEC 60598-2-22.2002, IDT). This part made the following editorial changes. --- Appendix A added CIE international standards used in China, Japan and North America to delete the standard of no use; --- Appendix C increases the pictorial symbols of legend; --- Appendix D, D.3.1 Added Note. Please note that some of the content of this document may involve patents. Release mechanism of the present document does not assume responsibility for the identification of these patents. This part is proposed by the China National Light Industry Council. This part of the National Electric lighting Standardization Technical Committee (SAC/TC224) centralized. This section is drafted. Shanghai era Lighting Appliance Co., detection, National Lighting Fitting Quality Supervision and Inspection Center, the National Electric Light Source Quality Supervision and Inspection Center (Shanghai), Dongguan, Guangdong Province Quality Supervision and Inspection Center, NVC (China) Co., Ltd., Shanghai Yaming Lighting Ltd., Op Lighting Co., Ltd., Huarong Technology Co., Ltd., Zhejiang Sunshine Lighting & Electrical Group Co., Ltd., Rieter Letter Green Lighting Co., Ltd., Jiangsu Hammer Lighting Technology Co., Ltd., Zhongshan City Electric Co., Ltd., Hangzhou Linan star lighting Electric Co., Ltd. The main drafters of this section. Yang Yue, Liu Lei, Xia Qingming, Zhang Lu, Cai Lirong, Xiong Fei, Zhu Huarong, Zhou Ding, Li Miaohua, Lu Jun, Xu Jianxing, Both in light, Chenshao Zhong, Cheng Du, Zhangjun Bin, Wang Ye, Zhao Xu, Shi Xiaohong, Chen Chao in.

Introduction

This section identifies the performance parameters and their way of expression to be provided, the basis of measurement and tolerance can be expected, also includes support for the appropriate environment Use of Information. If you want to propose additional performance requirements for particular types of light fixtures, will be introduced on the basis of Part 2 Part 1 on. Lighting performance - Part 1. General requirements

1 Scope

GB/T 31897 in this section include the use of electric light, power supply voltage not exceeding 1000V lighting performance and environmental requirements. Unless otherwise specified, within the scope of this performance data relates applies to newly manufactured and have completed the initial provision of Aging Process, representative Lamps. This section presents lamps and efficient use of energy at the end of life and reliable environmental management requirements. The purpose of this section is to provide a set of Usually suitable for most types of lighting requirements. It relates to a particular type of light source additional performance requirements in IEC 62722-2 (all parts) in Provisions. The intent of this section is to lamp manufacturers (or responsible vendor) to provide information and data to meet the requirements of this section. Letter of offer Interest under this section provides for assessment to determine eligibility. Data validation according to the requirements of this section will be measured. Half the luminaire are outside the coverage area. For some types of lamps (such as decorative or household), this Part performance parameters may not apply.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 22907-2008 luminaire photometric testing and distribution of photometric (CIE121.1996, IDT) GB/T 23110-2008 Floodlights photometry (CIE43. 1979, IDT) IEC 60598-1 Luminaires - Part 1. General requirements and tests (Luminaires-Part 1. Generalrequirementsand tests) IEC 60598-2 (all parts) Luminaires - Part 2. Particular requirements (Luminaires-Part 2. Particularrequire- ments) IEC 60598-2-22 Luminaires - Part 2-22. Particular requirements for emergency lighting (Luminaires-Part 2-22. Particular requirements-Luminairesforemergencylighting) IEC 62722-2 (all parts) lighting performance - Part 2. Particular requirements (Luminaireperformance-Part 2. Parti- cularrequirements) CIE34. 1977 road lighting and installation of optical data, classification and performance (Roadlightinglanternand instalationdata-Photometrics, classificationandperformance) CIE121-SP1.2009 luminaire photometric distribution and photometric test supplement. Emergency lighting (Thephotometryand goniophotometryofluminaires-Supplement1. Luminairesforemergencylighting) Note. Appendix A provides details of some countries to use regional standards.

3 Terms and Definitions

As defined in IEC 60598-1 and the following terms and definitions apply to this document. 3.1 Input power inputpower Lamps, including all electrical components work when its preset function required on the mains power consumed.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 31897.1-2015_English be delivered?

Answer: Upon your order, we will start to translate GB/T 31897.1-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 31897.1-2015_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 31897.1-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.