HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (25 Oct 2025)

GB/T 31310-2014 English PDF

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 31310-2014English285 Add to Cart 0--9 seconds. Auto-delivery Metallic material -- Determination of residual stress -- Hole drilling strain-gauge method Valid GB/T 31310-2014

PDF similar to GB/T 31310-2014


Standard similar to GB/T 31310-2014

GB/T 34487   GB/T 31930   GB/T 29459.1   GB/T 45597   GB/T 33820   GB/T 45169   

Basic data

Standard ID GB/T 31310-2014 (GB/T31310-2014)
Description (Translated English) Metallic material -- Determination of residual stress -- Hole drilling strain-gauge method
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard H22
Classification of International Standard 77.040.10
Word Count Estimation 42,471
Date of Issue 12/5/2014
Date of Implementation 9/1/2015
Quoted Standard JJG 623
Regulation (derived from) Announcement of Newly Approved National Standards 2014 No. 27
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This Standard specifies Test Overview elastic material near the surface of the metal material isotropic linear residual stress using drilling method, measuring equipment, measurement procedures, stress calculations constant calibration, measurement error

GB/T 31310-2014: Metallic material -- Determination of residual stress -- Hole drilling strain-gauge method


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Metallic material. Determination of residual stress. Hole drilling strain-gauge method ICS 77.040.10 H22 National Standards of People's Republic of China Metallic material residual stress measurement method of borehole strain Issued on. 2014-12-05 2015-09-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅲ Introduction Ⅳ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 Symbols and 2 5 3 Test Overview 6 7 Part Ready 7 rosette and measuring instruments 8 8 Test procedure 9 9 Calculation of Residual Stress 12 10 26 Test Report 11 Precision and Bias 26 Appendix A (normative) Calibration test low-speed drill and Formulas 29 Annex B (informative) Uncertainty drilling method of analysis 32 Results Appendix C (Informative Appendix) X-ray diffraction and drilling measurement of residual stresses than 35 References 36

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules. The standard proposed by China Iron and Steel Association. This standard by the National Steel Standardization Technical Committee (SAC/TC183) centralized. This standard was drafted. Wuhan Iron and Steel (Group) Corporation, Institute of Metal Research, Shanghai Entry-Exit Inspection and Quarantine Bureau, Wuhan the University. The main drafters of this standard. IRON Chen Huaining, Wu Yiwen, coating should macros, Yu Li, Zhu Lihong, Qiubao Wen, Liu Dong, Xue Huan, Imperial Concubines Wang selected country, Hou mass.

Introduction

Residual stress exists in almost all materials, are likely to produce residual stress in the workpiece during the manufacturing process or service. Especially for Those artifacts alternating loads or corrosive environments in service, if there is no consideration or accounting residual stress in the design process, it turns One of the important factors that cause material failure. Residual stress may also be useful, e.g., compressive stress generated by shot peening. Drilling Strain (under Referred to as the drilling method) is a method for determining residual stresses. Drilling method for measuring residual stress in an isotropic linear elastic material near the surface. Comprising the steps of. the strain put on the surface of the object Flowers, then take the strain drilling, and then measure the object surface released strain. The measured strain can be substituted into a series of formulas Calculate the material has been removed portion where the residual stresses. Drilling method of destruction caused by the workpiece is limited to a smaller area, for thicker materials, not usually into Positive Often use a serious impact, so called "semi-destructive" testing. In contrast, most other mechanical residual stress measurement methods will Causing serious damage to the workpiece. Due to the number of drilling method will cause some damage to the workpiece, the method only for drilling on the workpiece Hole (or after drilling through welding Buxiu mill) does not seriously affect its function under the case. There are two different ways of measuring residual stress. a) high-speed drilling residual stress measurement method, that method A. Finite element analysis of stress due to the high-speed drill machining strain is small, residual stress measurement can be entirely in accordance with the formula obtained by Cauchy Calibration constants are calculated. b) low-speed drill residual stress measurement method, that method B. Due to the low-speed drill work strain is relatively large, can not be ignored, the measurement of residual stress through stress comprehensive calibration tests obtained Calibration constants calculated. Theoretically, if the isotropic (isometric) residual stress exceeds 50% of the yield strength of the material, or in either direction shear stress exceeds the yield 25% of the strength of the service, may be due to the surrounding borehole stress concentration and localized yielding. But in practice there are reliable data show that the residual stress of not More than 60% of the material yield strength of this standard can still use (this limit is only determined for non-square test calibration calibration constant stress Method, Method A method of determining the. If the residual stress measurement of high material yield point, such as welding stress, at this time need a special set of Test calibration techniques, such as the calibration method B) [2]. Metallic material residual stress measurement method of borehole strain

1 Scope

This standard specifies the test outlined determination of the elastic material near the surface of a metallic material isotropic linear residual stress using the drilling method, measurement devices Equipment, measurement procedures, calibration constant stress calculation, measurement error correction and the like. Drilling method for measuring the inner surface of the metal material stress gradient less stress state, the residual stress in this state may be in the depth direction No change, approximately constant (uniform stress), there may be significant changes (non-uniform stress) in the depth direction. As a result of drilling only mode Plane residual stress can be measured near the surface of the material, and therefore the size of the drilling method can only be measured by drilling holes in the inner boundary of the local residual stresses.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. JJG623 resistance strain gauges

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 Stress calibration constants calibrationconstantforstresses Information residual stress and strain release scale factor. In borehole strain method, the resistance strain gauge geometry, pasting position, the hole The shape and size. 3.2 Strain Release relievedstrain The structural member having a stress field drilling, the amount of change before and after its drilling strain. 3.3 Thin workpieces thinworkpiece The thickness of the circular diameter smaller than the bore diameter of the workpiece or strain to spend. 3.4 Thick workpiece thickworkpiece Many artifacts than the thickness of the large diameter drilling. 3.5 Medium thickness of the workpiece intermediatethicknessworkpiece Thick and thin workpiece workpiece workpiece in between. 3.6 High-speed drilling high-speedhole-driling Speed \u200b\u200binto the hole in the tens of thousands of revolutions per minute or more, cutting a small amount of processing methods. 3.7 Low-speed drill low-speedhole-driling Pore-forming speed of thousands of revolutions per minute, especially a hand drill processing methods.