HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 30966.1-2022 English PDF

US$514.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 30966.1-2022: Wind energy generation systems - Communications for monitoring and control of wind power plants - Part 1: Overall description of principles and models
Status: Valid

GB/T 30966.1: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 30966.1-2022English514 Add to Cart 4 days [Need to translate] Wind energy generation systems - Communications for monitoring and control of wind power plants - Part 1: Overall description of principles and models Valid GB/T 30966.1-2022
GB/T 30966.1-2014EnglishRFQ ASK 5 days [Need to translate] Wind turbines -- Communications for monitoring and control of wind power plants -- Part 1: Overall description of principles and models Obsolete GB/T 30966.1-2014

PDF similar to GB/T 30966.1-2022


Standard similar to GB/T 30966.1-2022

GB/T 25388.1   GB/T 25387.1   GB/T 25389.2   GB/T 30966.4   GB/T 30966.3   GB/T 30966.5   

Basic data

Standard ID GB/T 30966.1-2022 (GB/T30966.1-2022)
Description (Translated English) Wind energy generation systems - Communications for monitoring and control of wind power plants - Part 1: Overall description of principles and models
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F11
Classification of International Standard 27.180
Word Count Estimation 30,310
Date of Issue 2022-10-14
Date of Implementation 2022-10-12
Older Standard (superseded by this standard) GB/T 30966.1-2014
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 30966.1-2022: Wind energy generation systems - Communications for monitoring and control of wind power plants - Part 1: Overall description of principles and models


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Wind energy generation systems -- Communications for monitoring and control of wind power plants -- Part 1.Overall description of principles and models ICS 27.180 CCSF11 National Standards of People's Republic of China Replacing GB/T 30966.1-2014 Wind Turbine Wind Farm Monitoring System Communication Part 1.Principles and Models 2022-10-12 Released 2022-10-12 Implementation State Administration for Market Regulation Released by the National Standardization Administration directory Preface III Introduction IV 1 Scope 1 2 Normative references 2 3 Terms and Definitions 3 4 Abbreviations7 5 General requirements7 5.1 General provisions7 5.2 Wind farm overview8 5.3 General requirements for communication9 5.4 Communication Model 11 6 Wind farm information model 13 6.1 General provisions 13 6.2 Information Modeling Methods 13 7 Wind farm information exchange model 17 7.1 General provisions 17 7.2 Information Exchange Modeling Methods 17 8 maps to communication protocol 22 8.1 General provisions 22 8.2 Mapped Architecture 23 8.3 Mapping of wind farm information model 24 Reference 25 Figure 1 Communication model concept of IEC 61400-25 series 2 Figure 2 Server-side data processing (conceptual level) 11 Figure 3 Modeling approach (conceptual level) 12 Figure 4 Structure of wind farm information model 15 Figure 5 The role of the Common Data Class (CDC) in the wind farm (WPP) information model15 Figure 6 Client and server roles 18 Figure 7 IEM Service Model 18 Figure 8 Conceptual model of wind farm information exchange19 Figure 9 IEM service model example 21 Figure 10 Sequence diagram 22 Figure 11 ACSI mapping to communication stack/protocol 23 Figure 12 Communication Protocol 24 Table 1 Running functions 10 Table 2 Management functions10 Table 3 Types of wind farm information13 Table 4 General table structure of logical node (LN) 16 Table 5 Data class attributes of logical nodes 16 Table 6 Service Table 21

foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" drafted. This document is part 1 of GB/T 30966 "Wind Power Plant Monitoring System Communication for Wind Turbines". GB/T 30966 has Post the following sections. --- Part 1.Principles and models; --- Part 2.Information model; --- Part 3.Information exchange model; --- Part 4.Mapping to communication protocols; --- Part 5.Conformance testing; --- Part 6.Logical node classes and data classes for state monitoring. This document replaces GB/T 30966.1-2014 "Wind Turbine Wind Farm Monitoring System Communication Part 1.Principles and Model", compared with GB/T 30966.1-2014, in addition to structural adjustment and editorial changes, the main technical changes are as follows. a) Modified some normative references (see Chapter 2, Chapter 2 of the.2014 edition); b) Some terms and definitions have been changed (see Chapter 3, Chapter 3 of the.2014 edition); c) Added Condition Monitoring System (CMS) (see 5.2.2); d) Added Figure 5 "Role of Common Data Class (CDC) in Wind Power Plant (WPP) Information Model" (see 6.2.2); e) Changed text and overview model to harmonize with other parts of the IEC 61400-25 series (see 5.4, 6.2, 7.2, 8.3,.2014 version 5.4, 6.2, 7.2, 8.3). This document is equivalent to IEC 61400-25-1.2017 "Wind Turbine Part 25-1.Communication of Wind Farm Monitoring System" Principles and Models. The following editorial changes have been made to this document. --- Change the standard name to "Wind Turbine Wind Farm Monitoring System Communication Part 1.Principles and Models". Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents. This document is proposed by China Machinery Industry Federation. This document is under the jurisdiction of the National Wind Power Standardization Technical Committee (SAC/TC50). This document is drafted by. Jiangsu Guoke Intelligent Electric Co., Ltd., China Huaneng Group Clean Energy Technology Research Institute Co., Ltd., Beijing Goldwind Huineng Technology Co., Ltd., Shanghai Electric Wind Power Group Co., Ltd., Beijing Kenuo Weiye Technology Co., Ltd., Beijing Huizhi Tianhua New Energy Technology Co., Ltd., Kenuo Weiye Wind Energy Equipment (Beijing) Co., Ltd., Institute of Electrical Engineering, Chinese Academy of Sciences, China Classification Society Quantitative Certification Company, State Power Investment Group Guangxi Electric Power Co., Ltd. Guilin Branch, and Guodian United Power Technology Co., Ltd. The main drafters of this document. Chao Dynasty, Ma Shikuan, Li Yuan, Wang Hua, Ding Xuejuan, Gan Shiqiang, Liu Hailiang, Cheng Changsheng, Wu Xin, E Chunliang, Chen Danghui, Zhu Cheng, Wang Lipeng, Gu Haitao, Hu Shuju, Song Bin, Feng Cheng, Fu Cheng, Wang Xiaodong, Zhou Shengbing. The previous versions of this document and its superseded documents are as follows. ---First published in.2014 as GB/T 30966.1-2014, this is the first revision.

Introduction

This document was developed to provide a unified communication basis for wind farm monitoring. GB/T 30966 "Wind turbine wind farm Monitoring System Communication" defines the information model and information exchange model for wind farm monitoring, so that different customers can communicate with different manufacturers and suppliers. The access between the supplier's servers is universal. GB/T 30966 is mainly based on IEC 61400-25, which defines the specific information for wind farms. information, information exchange mechanisms, and mapping of communication protocols. In this regard, IEC 61400-25 specifies the Detailed requirements for the exchange of available information for wind farm components. These requirements are defined in IEC 61400-25 or refer to other standards. The wind farm information model and the information exchange model work together to create a visual interface for the interaction between the client and the server. as an access wind An interpretation framework for farm data, the wind farm information model provides a unified, component-based view of wind farm data to the client through the server. The information exchange model reflects the full effective functionality of the server. IEC 61400-25 supports clients from different manufacturers and suppliers A connection between a heterogeneous mix of servers. GB/T 30966 (all parts) currently consists of the following 6 parts. --- Part 1.Principles and models. The purpose is to study the general communication between the SCADA system of the wind farm and the wind turbine. sexual requirements. --- Part 2.Information model. The purpose is to specify the summary description of the logical node class, the wind farm logical node class to the common logical node class definition and requirements. --- Part 3.Information exchange model. The purpose is to specify the information exchange model that can be used by clients and servers to access The content and structure of the wind farm information model defined in GB/T 30996.2. --- Part 4.Mapping to the communication protocol. The purpose is to specify a specific mapping for the protocol stack between the client and the remote server. The information exchange provides the required information encoding. --- Part 5.Conformance testing. The purpose is to specify the components (such as wind turbines) and participants (such as wind turbines) in the wind farm General requirements for communication between SCADA systems), detailing standard techniques for implementing conformance testing, and deterministic A specific measurement technique to be applied when a parameter can be used. --- Part 6.Logical node classes and data classes for state monitoring. It is intended for wind turbine or wind farm components or structures Observing parts for a period of time, evaluating the state and state changes of parts or structural parts, so as to find potential failures. Early signs. Wind Turbine Wind Farm Monitoring System Communication Part 1.Principles and Models

1 Scope

IEC 61400-25 (all parts) is concerned with the components (e.g. wind turbines) and actors (e.g. SCADA) in wind farms General requirements for communication between systems). The internal communication of each part of the wind farm itself is not within the scope of application. IEC 61400-25 (all parts) designed the communication environment supported by the client-server model, which defines the following three aspects. content, and modeled separately to ensure the scalability of the implementation. a) wind farm information model; b) information exchange model; c) Information models and information exchange models are mapped to standard communication protocols. The wind farm information model and the information exchange model form an interface between the client and the server. as access to wind farm data Interpretation framework, wind farm information model provides unified, component-oriented wind farm data to the client through the server side. information exchange model Reflects all available functionality on the server side. IEC 61400-25 (all parts) enables different clients with different manufacturers and suppliers Access between servers is universal. As shown in Figure 1, the server side defined by IEC 61400-25 (all parts) includes the following aspects. --- Information provided by wind farm components, such as "wind turbine rotor speed" or "total power generation within a certain period of time", these Information is modeled and can be accessed efficiently. Modelling information in IEC 61400-25 (all parts) in IEC 61400-25-2 and as defined in IEC 61400-25-6. --- Exchange services for modeled information values, as defined in IEC 61400-25-3. --- Map to the communication protocol, providing a protocol stack to obtain exchange values from modeled information (IEC 61400-25-4). IEC 61400-25 (all parts) only defines how information is modeled, exchanged and mapped to specific communication protocols, not including How and where to implement communication interfaces, application programming interfaces, and recommendations for implementation. However, the purpose of IEC 61400-25 (all parts) is to The information related to a single wind farm component (eg wind turbine) is acquired through the corresponding logic device. This document specifies general provisions for the principles and models of use of IEC 61400-25 (all parts). NOTE. IEC 61400-25 (all parts) is concerned with general, non-vendor specific information. Information for which vendor-specific implementations vary widely Items may be specified in bilateral agreements, user groups or amendments to IEC 61400-25 (all parts).

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 30966.1-2022_English be delivered?

Answer: Upon your order, we will start to translate GB/T 30966.1-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 30966.1-2022_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 30966.1-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 30966.1-2022?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 30966.1-2022 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.