US$904.00 ยท In stock Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 30966.5-2022: Wind energy generation systems - Communications for monitoring and control of wind power plants - Part 5: Compliance testing Status: Valid GB/T 30966.5: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 30966.5-2022 | English | 904 |
Add to Cart
|
7 days [Need to translate]
|
Wind energy generation systems - Communications for monitoring and control of wind power plants - Part 5: Compliance testing
| Valid |
GB/T 30966.5-2022
|
GB/T 30966.5-2015 | English | 1714 |
Add to Cart
|
5 days [Need to translate]
|
Wind turbines -- Communications for monitoring and control of wind power plants -- Part 5: Conformance testing
| Obsolete |
GB/T 30966.5-2015
|
PDF similar to GB/T 30966.5-2022
Basic data Standard ID | GB/T 30966.5-2022 (GB/T30966.5-2022) | Description (Translated English) | Wind energy generation systems - Communications for monitoring and control of wind power plants - Part 5: Compliance testing | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | F11 | Classification of International Standard | 27.180 | Word Count Estimation | 50,527 | Date of Issue | 2022-10-12 | Date of Implementation | 2022-10-12 | Older Standard (superseded by this standard) | GB/T 30966.5-2015 | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 30966.5-2022: Wind energy generation systems - Communications for monitoring and control of wind power plants - Part 5: Compliance testing ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Wind energy generation systems - Communications for monitoring and control of wind power plants - Part 5.Compliance testing
ICS 27.180
CCSF11
National Standards of People's Republic of China
Replacing GB/T 30966.5-2015
Wind Turbine Wind Farm Monitoring System Communication
Part 5.Conformance testing
windpowerplants-Part 5.Compliance testing
Compliance testing, IDT)
2022-10-12 release 2022-10-12 implementation
State Administration for Market Regulation
Released by the National Standardization Management Committee
table of contents
Preface III
Introduction IV
1 Scope 1
2 Normative references 1
3 Terms and Definitions 2
4 Abbreviations4
5 Introduction to Conformance Testing 5
5.1 Overview 5
5.2 Conformance test procedure 5
5.3 Quality assurance and testing 5
5.3.1 Overview 5
5.3.2 Quality plan 6
5.4 Test 6
5.4.1 General 6
5.4.2 Equipment Test 7
5.5 Conformance test report file 8
6 Conformance testing of equipment 8
6.1 Test method 8
6.2 Conformance test procedure 8
6.2.1 Overview 8
6.2.2 Test procedure requirements 9
6.2.3 Test structure 10
6.2.4 Server device test case 10
6.2.5 Test cases for client devices 27
6.2.6 Acceptance criteria 40
7 Performance testing 41
7.1 Overview 41
7.2 Introduction to communication delay-transmission time test 41
7.3 Time Synchronization and Accuracy 42
7.3.1 Introduction to Time Synchronization Test 42
7.3.2 Time Synchronization Test Method 42
7.3.3 The time of the time synchronization protocol 43
Appendix A (Informative) Test Process Template Example 44
foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules for Standardization Documents"
drafting.
This document is part 5 of GB/T 30966 "Wind Turbine Wind Farm Monitoring System Communication". GB/T 30966 has
The following parts have been published.
--- Part 1.Principles and models;
--- Part 2.Information model;
--- Part 3.Information exchange model;
--- Part 4.Mapping to communication protocol;
--- Part 5.Conformance testing;
--- Part 6.Logical node classes and data classes for status monitoring.
This document replaces GB/T 30966.5-2015 "Wind Turbine Wind Farm Monitoring System Communication Part 5.Consistency
Test", compared with GB/T 30966.5-2015, except for structural adjustments and editorial changes, the main technical changes are as follows.
---Changed part of the term content (see Chapter 3, Chapter 3 of the.2015 edition);
--- Added some abbreviations (see Chapter 4);
--- Added the review required by the client (see 5.3.2.3);
--- Changed the conformance test of the relevant equipment (see Chapter 6, Chapter 6 of the.2015 edition).
This document is equivalent to IEC 61400-25-5.2017 "Wind Turbine Generating Sets Part 25-5.Communication of Wind Farm Monitoring System -
Consistency Test".
The following minimal editorial changes have been made to this document.
--- In order to coordinate with existing standards, change the name of the standard to "Wind Turbine Wind Farm Monitoring System Communication Part 5.
Conformance Test";
Please note that some contents of this document may refer to patents. The issuing agency of this document assumes no responsibility for identifying patents.
This document is proposed by China Machinery Industry Federation.
This document is under the jurisdiction of the National Wind Power Standardization Technical Committee (SAC/TC50).
This document is drafted by. Shanghai Electric Wind Power Group Co., Ltd., Beijing Goldwind Huineng Technology Co., Ltd., Jiangsu Guoke Smart Power Co., Ltd.
Gas Co., Ltd., Shanghai Electric Wind Power Group Co., Ltd. Engineering Service Branch, Institute of Electrical Engineering, Chinese Academy of Sciences, Jiangsu Guangheng New Energy
Source Co., Ltd., Longyuan Power Group Co., Ltd., Beijing Jianheng Certification Center Co., Ltd.
The main drafters of this document. Hong Wenzhong, Xu Yiqing, Gan Shiqiang, Ma Shikuan, Fang Yun, Ding Xuejuan, Sun Wenguang, Wang Chao, Cao Yu, Hu Shuju,
Deng Ya, Xu Jizhong, Liu Junqi, Zhou Xinliang.
This document was first published in.2015, and this is the first revision.
Introduction
IEC 61400-25 (all parts) addresses wind farm components (such as wind turbines) and other parts involved in generating electricity
(such as SCADA system) interconnection communication problems. IEC 61400-25 (all parts) for communication environments supported by the client-server model
For the design, the following three aspects are defined and modeled separately to ensure the scalability of the implementation.
a) wind farm information model;
b) information exchange model;
c) Map these two models to a standard communication protocol.
The wind farm information model and the information exchange model work together to create a visual interface for the interaction between the client and the server. as a visiting wind
Interpretation framework of power field data, wind farm information model provides a unified, component-based view of wind farm data to the client through the server.
The information exchange model reflects the full functionality of the server. IEC 61400-25 (all parts) support from different manufacturers and suppliers
Connections between heterogeneous combinations of clients and servers. GB/T 30966 (all parts) currently consists of the following 6 parts.
--- Part 1.Principles and models. The purpose is to study the general communication between the wind farm SCADA system and the wind turbine
sexual demands.
--- Part 2.Information Model. The purpose is to specify the summary description of the logical node class, the logical node class of the wind farm to the common logical node class
definitions and requirements.
--- Part 3.Information exchange model. The purpose is to specify an information exchange model that can be used by clients and servers to access
The content and structure of the wind farm information model defined in GB/T 30966.2.
--- Part 4.Mapping to the communication protocol. The purpose is to specify a specific mapping oriented to the protocol stack, and provide a link between the client and the remote server.
Provide the required information encoding for information exchange between them.
--- Part 5.Conformance testing. The purpose is to specify the various components (such as wind turbines) and participants (such as wind turbines) in the wind farm
General requirements for communication between SCADA systems), detailing standard techniques for implementing conformance testing, and deterministic
Specific measurement techniques applied when parameters are available.
--- Part 6.Logical node classes and data classes for status monitoring. Its purpose is to control wind turbine or wind farm components or structures
Observe the components for a period of time, evaluate the state and state changes of the components or structural parts, so as to find potential faults
early signs.
Wind Turbine Wind Farm Monitoring System Communication
Part 5.Conformance testing
1 Scope
This document describes in detail the standard techniques for implementing conformance testing, as well as the specific measurement techniques applied when determining performance parameters. These
The application of technology has improved users' purchase intentions for systems with simple integration, stable operation, and support for customized applications.
As shown in Figure 1, this document defines.
--- Methods and abstract test cases for conformance testing of server and client devices in wind farms.
--- According to the communication requirements specified in IEC 61400-25 (all parts), the device needs to be measured indicators.
NOTE. The role of test equipment in conformance testing and verification of results is beyond the scope of this document.
Figure 1 IEC 61400-25 standard communication model concept
2 Normative references
The contents of the following documents constitute the essential provisions of this document through normative references in the text. Among them, dated references
For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to
this document.
GB/T 30966.1 Communication of wind farm monitoring system for wind turbines - Part 1.Principles and models
(GB/T 30966.1-2022, IEC 61400-25-1.2017, IDT)
GB/T 30966.2-2022 Wind turbine wind farm monitoring system communication Part 2.Information model
(IEC 61400-25-2.2015, IDT)
GB/T 30966.3 Communication of Wind Power Plant Monitoring System for Wind Turbines Part 3.Information Exchange Model
(GB/T 30966.3-2022, IEC 61400-25-3.2015, IDT)
GB/T 30966.4 Communication of wind farm monitoring system for wind turbines - Part 4.Mapping to communication protocol
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 30966.5-2022_English be delivered?Answer: Upon your order, we will start to translate GB/T 30966.5-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 30966.5-2022_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 30966.5-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 30966.5-2022?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 30966.5-2022 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|