|
US$399.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 29580-2013: Time-based cost-allocation device for central air-conditioning Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 29580-2013 | English | 399 |
Add to Cart
|
3 days [Need to translate]
|
Time-based cost-allocation device for central air-conditioning
| Valid |
GB/T 29580-2013
|
PDF similar to GB/T 29580-2013
Basic data | Standard ID | GB/T 29580-2013 (GB/T29580-2013) | | Description (Translated English) | Time-based cost-allocation device for central air-conditioning | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | N13 | | Classification of International Standard | 17.040.30 | | Word Count Estimation | 17,190 | | Quoted Standard | GB/T 191; GB/T 2423.1; GB/T 2423.2; GB 4793.1; GB/T 6388; GB/T 6587-2012; GB/T 9969; GB/T 17626.4-2008; GB/T 17626.5-2008; GB/T 17626.8-2008; GB/T 17626.11-2008 | | Regulation (derived from) | National Standards Bulletin 2013 No. 10 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies: Time Act centralized air conditioning household metering device (hereinafter referred to as unit) terms and definitions, requirements, test methods, inspection rules, marking, transportation and storage. This standard applies to c |
GB/T 29580-2013: Time-based cost-allocation device for central air-conditioning---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Time-based cost-allocation device for central air-conditioning
ICS 17.040.30
N13
National Standards of People's Republic of China
Time Act of central air conditioning household metering apparatus
Issued on. 2013-07-19
2014-03-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 requires 2
5 Test Method 3
6 Inspection rules 8
7 marking, transportation and storage of 8
Appendix A (informative) Time Act of central air conditioning household metering device structure 10
Centralized Annex B (informative) Time Act air conditioning household metering apparatus 11 accounting method
Annex C (informative) Time Act of central air conditioning household metering device management software 12
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
The standard proposed by the Ministry of Housing and Urban-Rural Development of the People's Republic of China.
This standard by the National HVAC and purification equipment Standardization Technical Committee (SAC/TC143) centralized.
This standard is drafted by. Echo Technology Co., Ltd. of Guangdong, Foshan Standardization Research and Promotion Center.
Participated in the drafting of this standard. Zhongkai University of Agriculture and Engineering, Guangzhou University, South China University of Technology, Tsinghua University, Hunan University, Shandong Architecture
University, China Architecture Design Institute, Southwest China Construction Design Institute Limited, China Academy of Building Research, Beijing Architectural Design
Research Institute, Shanghai Institute of Architectural Design Co., Ltd., Shanghai Modern Architectural Design (Group) Co., Ltd., Guangdong Architectural Design and Research Institute, Mountain
Eastern Provincial Institute of Architectural Design and Research Institute of Machinery Industry Design Sixth, China Construction Industry Association Professional Committee of Intelligent Building, China AUTOMATION
Intelligent building and building automation will be the Professional Committee of the Guangdong Provincial Academy of Building Research, Guangdong Hong Tat Westinghouse Air Conditioning Co., Ltd., Beijing Colliers States
Inter Property Services Limited, Beijing DTZ Debenham Tie Leung Property Management Limited.
The main drafters of this standard. the new Yang, Chang Wen-fei, Qian Lu Ping, Pengzhao Bin, Li Feilong, Pangqi Xiong, Ding exercise, Xu Xiaoning, Liu Jinping,
Geng Wang Yang, Liu Lanbin, Zhang Guoqiang THERMAL Song Xiaochun, Rong Xiangyang Song Hui industry, VENTILATING Shou Wei Wei, Zhao Jian, Liu Jianwei, in Xiaoming,
Gao Hong Lan, Guo Weijun, Li Cuiping, Huangjiu Song, Wang Qihua, Yang Shi Chao, Yu Peng, Cai Zhan Wen, Zhu, Ma Fengqi.
Time Act of central air conditioning household metering apparatus
1 Scope
This standard specifies the Time Act of central air conditioning household metering apparatus (hereinafter referred to as the device) terms and definitions, requirements, test methods, inspection
Rules, labeling, transportation and storage
This standard applies to central air conditioning systems by calculating the terminal equipment uptime-off control, to household metering apparatus.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 191 Packaging - Pictorial signs
GB/T 2423.1 Environmental testing for electric and electronic products Part 2. Test methods Test A. Cold
GB/T 2423.2 Environmental testing for electric and electronic products Part 2. Test methods Test B. Dry heat
GB 4793.1 measurement, control and laboratory safety requirements for electrical equipment - Part 1. General requirements
GB/T 6388 transport package shipping mark
GB/T 6587-2012 General specification for electronic measuring instruments
GB/T 9969 General Instructions industrial products
GB/T 17626.4-2008 Electromagnetic compatibility - Testing and measurement techniques - Electrical fast transient burst immunity test
GB/T 17626.5-2008 Electromagnetic compatibility - Testing and measurement techniques - Surge (impact) immunity test
GB/T 17626.8-2008 Electromagnetic compatibility - Testing and measurement techniques - Power frequency magnetic field immunity test
GB/T 17626.11-2008 Electromagnetic compatibility Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity
test
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Time Act sub-metering time-basedcost-alocation
Central air conditioning terminal equipment to control equivalent time off based on the methods of cold (hot) the amount assessed.
3.2
Time Act of central air conditioning household metering apparatus time-basedcost-alocationdeviceforcentralair-conditioningsystem
Central air conditioning system during normal operation, the end of the collection device switch state, wind speed and operating time and other information to calculate the different wind
Speed \u200b\u200bmeans the cumulative time of heat exchange. Household metering apparatus includes a data collection, transmission and processing of other functional modules.
End device terminal
Fan coil central air conditioning system, combined air conditioner, floor heating coils and other heat exchange equipment.
3.3
Heat exchange time heattransmissiontime
In the case of cooling (heating) system normal operation, the terminal equipment in the heat exchange condition cumulative run time.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 29580-2013_English be delivered?Answer: Upon your order, we will start to translate GB/T 29580-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 29580-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 29580-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|