US$299.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 29519-2013: Safety specification for lead smelting Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 29519-2013 | English | 299 |
Add to Cart
|
3 days [Need to translate]
|
Safety specification for lead smelting
| Valid |
GB/T 29519-2013
|
PDF similar to GB/T 29519-2013
Basic data | Standard ID | GB/T 29519-2013 (GB/T29519-2013) | | Description (Translated English) | Safety specification for lead smelting | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | H09 | | Classification of International Standard | 13.100 | | Word Count Estimation | 13,132 | | Quoted Standard | GB 4053.1; GB 4053.2; GB 4053.3; GB 4387; GB 5082; GB 6067.1; GB 6722; GB/T 8196; GB 8958; GB 9448; GB/T 11651; GB 12348; GB/T 13869; GB 16912; GB 18218; GB 25466; GB/T 28001; GB/T 28002; GB 50016; GB 50030; GB 50034; GB 50057; GB 50058; GB 50187; GB 5021 | | Regulation (derived from) | National Standards Bulletin 2013 No. 9 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the safety of lead smelting enterprises the basic requirements. This standard applies to lead smelting enterprises design, construction, production, maintenance, repair and management. |
GB/T 29519-2013: Safety specification for lead smelting---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Safety specification for lead smelting
ICS 13.100
H09
National Standards of People's Republic of China
Lead smelting production safety norms
Issued on. 2013-06-09
2014-02-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 Basic requirements 2
3.1 Plant and plant construction 2
3.2 Security Management 2
3.3 Occupational Health and Personal Protection 2
3.4 Production equipment and facilities 3
3.5 Maintenance and Repair 3
3.6 Transportation and Fire 3
4 main lead smelting processes and equipment 4
4.1 Step 4 materials
4.1.1 Ingredients 4
4.1.2 granulation 4
4.2 Smelting Process 4
4.2.1 sintering machine 4
4.2.2 melting furnace 4
4.2.2.1 Shutdown open 4
4.2.2.2 feed 5
4.2.2.3 the lead slag 5
4.2.2.4 Slag Casting 5
4.2.3 blast furnace 5
4.2.3.1 feed 5
4.2.3.2 Melting 5
4.2.3.3 the lead slag 6
4.2.3.4 Cleanup Slag (blasting) 6
4.3 electrolysis step 6
4.3.1 molten lead 6
4.3.2 cast plate 6
4.3.3 attire groove 6
4.3.4 ingot 7
4.3.5 product packaging 7
4.4 auxiliary equipment 7
4.4.1 HRSG 7
4.4.2 ESP 7
4.4.3 Fan 7
4.4.4 Special equipment 8
4.5 Dynamic System 8
4.6 oxygen station 8
8 4.7 Environmental Protection
5 8 emergency rescue plan
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard by the national non-ferrous metals Standardization Technical Committee (SAC/TC243) centralized.
This standard was drafted. Henan Yuguang Gold & Lead Co., Ltd., Shanghai flywheel-ferrous smelter, Zhuzhou Smelter Group Co., Ltd.
The main drafters of this standard. Sunxing Kai, Zhao Bo, Zhang Xiaoguo, Huze Sheng, Wu Jianhua, Han Ying, Tan ceremonial TRANSACTIONS OF.
Lead smelting production safety norms
1 Scope
This standard specifies the basic requirements for safe production of lead smelting enterprises.
This standard applies to the lead smelting enterprises design, construction, production, maintenance, repair and management.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB 4053.1 fixed ladders and platforms - Safety requirements - Part 1. Steel ladders
GB 4053.2 fixed ladders and platforms - Safety requirements - Part 2. Steel LADDER
GB 4053.3 fixed ladders and platforms - Safety requirements - Part 3. Industrial guardrails and steel platform
GB 4387 industrial enterprises in railway and road transport safety regulations
GB 5082 crane lifting command signal
GB 6067.1 crane safety regulations - Part 1. General
GB 6722 Blasting Safety Regulations
GB/T 8196 mechanical safety devices fixed and movable guards General requirements for the design and manufacture
GB 8958 hypoxia dangerous job safety rules
GB 9448 Welding and Cutting Safety
GB/T 11651 Personal protective equipment selection specification
GB 12348 industrial enterprises of environmental noise emission standard plant boundary
GB/T 13869 Electrical Safety Guidelines
GB 16912 Deep frozen production of oxygen and related gas safety technical regulations
GB 18218 hazardous chemicals major hazard identification
GB 25466 Lead, zinc industrial pollutant discharge standards
GB/T 28001 Occupational Health and Safety Management System Requirements
GB/T 28002 Occupational Health and Safety Management System Implementation Guide
GB 50016 fire protection design specification
GB 50030 oxygen station design specifications
GB 50034 architectural lighting design standards
GB 50057 Lightning in design
GB 50058 Explosion and fire hazard electrical installation design specifications
GB 50187 for General graphic design specification
GB 50211 industrial furnace masonry construction and acceptance
GB 50309 industrial furnaces building Quality Inspection and Evaluation Standards
GB Z1 Design of Industrial Enterprises hygiene standards
GB Z2 Workplace Hazardous Occupational Exposure Limits
GB Z158 workplace occupational hazard warning labels
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 29519-2013_English be delivered?Answer: Upon your order, we will start to translate GB/T 29519-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 29519-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 29519-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|