|
US$189.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 28847.1-2012: Building automation and control systems -- Part 1: Summarize Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 28847.1-2012 | English | 189 |
Add to Cart
|
3 days [Need to translate]
|
Building automation and control systems -- Part 1: Summarize
| Valid |
GB/T 28847.1-2012
|
PDF similar to GB/T 28847.1-2012
Basic data | Standard ID | GB/T 28847.1-2012 (GB/T28847.1-2012) | | Description (Translated English) | Building automation and control systems -- Part 1: Summarize | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | L67 | | Classification of International Standard | 35.240.50 | | Word Count Estimation | 8,821 | | Regulation (derived from) | National Standards Bulletin 2012 No. 28 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the building automation and control system objectives, roles and implementation process. This section applies to building automation and control system design and implementation. |
GB/T 28847.1-2012: Building automation and control systems -- Part 1: Summarize---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Building automation and control systems Part 1. Summarize
ICS 35.240.50
L67
National Standards of People's Republic of China
Building automation and control systems
Part 1. Overview
Part 1. Summarize
Issued on. 2012-11-05
2013-02-15 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
GB/T 28847 "Building automation and control system" is divided into seven parts.
--- Part 1. General;
--- Part 2. Hardware;
--- Part 3. Function;
--- Part 4. Applications;
--- Part 5. Data communication protocols;
--- Part 6. Data communication conformance testing;
--- Part 7. project implementation.
This section GB/T Part of 128,847.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This part is proposed by the Ministry of Housing and Urban-Rural Development.
This part of the National intelligent buildings and residential areas digital Standardization Technical Committee (SAC/TC426) centralized.
This section drafted by. the Ministry of Housing and Urban Information Center, Chinese and foreign construction Information Co., Ltd., Beijing Jiaotong University, Mechanical Engineering
Industry Instrumentation Technology and Economy Institute of Housing and Urban-Rural Construction IC card application service center, Shenzhen real smart Co.,
Guangzhou-Hui Electronic Technology Co., Ltd., Matsushita Electric Research and Development (China) Co., Ltd., Shenzhen Huirui Electric Manufacturing Co., North
Beijing, Fudan Microelectronics Technology Co., Ltd., Shanghai Chen new Intelligent System Integration Co., Ltd., Shenzhen Sunwin Intelligent Co., Ltd., Shanghai Long
Jiang Xincheng computer system integration Limited.
The main drafters of this section. Wang Hui, Zhou Xin, Yang Hui, Zhou Bo, Zhang Yonggang, display, Shang Zhiyu, Ma Hong, Shen Fei Fei, Wang Yi, Cheng Weidong,
Wang Chunxi, forest green, Jiadong Yao, Huang Jiwen, Semin super, Vang Pao thrush, He Peixin, Linbi Yi, Hu Long.
Building automation and control systems
Part 1. Overview
1 Scope
This section GB/T 28847 specifies the goal of building automation and control systems, and the role of the implementation process.
This section applies to the design and implementation of building automation and control systems.
2 Terms and definitions
The following terms and definitions apply to this document.
2.1
Building automation and control buildingautomationandcontrol
In order to achieve energy efficiency, conservation, safe operation of facilities serving the purpose of the building, and monitoring with automatic control, optimization and management
activity.
2.2
Building automation and control systems buildingautomationandcontrolsystem
It can be realized on various types of equipment distributed monitoring and management systems, including automatic control, monitoring and optimization of products and engineering services.
2.3
Interlock interlock
For controlling the sequence, a Boolean logic devices and closed-loop control, on/off control of the operation of an open connection to another device.
2.4
Closed-loop control closedcircuitcontrol
Output to the difference between the measured value and the expected value of 0 is reduced to the method of process control work.
2.5
Open control opencircuitcontrol
One or more measurement input in the process there is no continuation of the impact of the conditions on the input control work.
2.6
Analog signal analoguesignal
Continuous time and continuous numerical information characteristic signal.
2.7
Coupling coupling
Closely with the presence of interaction between two or more elements of the input and output circuit or an electrical network, and through interaction
From side to side with the energy transfer phenomenon.
2.8
Pulse signal pulsesignal
Time discrete signal characteristic information.
2.9
Transmitter transmitter
Output means prescribed type and value of the signal.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 28847.1-2012_English be delivered?Answer: Upon your order, we will start to translate GB/T 28847.1-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 28847.1-2012_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 28847.1-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|