HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 27875-2011 English PDF

US$489.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 27875-2011: Technical requirements for project and heavy lift cargoes handling in port
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 27875-2011English489 Add to Cart 4 days [Need to translate] Technical requirements for project and heavy lift cargoes handling in port Valid GB/T 27875-2011

Standard similar to GB/T 27875-2011

GB 16994.6   GB 16994.5   GB 16994.4   

Basic data

Standard ID GB/T 27875-2011 (GB/T27875-2011)
Description (Translated English) Technical requirements for project and heavy lift cargoes handling in port
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard R43
Classification of International Standard 03.220.40
Word Count Estimation 21,226
Date of Issue 2011-12-30
Date of Implementation 2012-06-01
Quoted Standard GB/T 191; GB/T 1835; GB/T 6067; JT/T 557
Regulation (derived from) Announcement of Newly Approved National Standards No. 23 of 2011
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard specifies the port of loading and unloading of major pieces of the basic requirements for stevedores attachment selection and use requirements, and handling technical requirements and methods of operation. This standard applies to the bulky and out of port terminals, growing a variety of goods and machinery spare parts, equipment and vehicles.

GB/T 27875-2011: Technical requirements for project and heavy lift cargoes handling in port

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical requirements for project and heavy lift cargoes handling in port ICS 03.220.40 R43 National Standards of People's Republic of China Heavy loading and unloading port Technical requirements Issued on. 2011-12-30 2012-06-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 Basic requirements 1 Selecting and using 5 stevedores attachment of claim 2 6 handling technical requirements and methods of operation 5 Calculation Appendix A (informative) sling length 15 Annex B (informative) Calculation specifications sling 16

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules. This standard is proposed and managed by the Ministry of Transport. This standard was drafted. Shanghai International Port (Group) Co., Ltd. The main drafters of this standard. Bao Qifan, Luo Wenbin, Zhu Zufu, Wenjun, Shun Ling, Liao ago. Heavy loading and unloading port Technical requirements

1 Scope

This standard specifies the basic requirements for major pieces of port loading and unloading, selection and use requirements stevedores attachments, as well as handling the technical requirements And methods of operation. This standard applies to bulky and out of ports, growing parts of cargo and machinery, equipment and vehicles.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 191 Packaging - Pictorial signs GB/T 1835 Series 1 container corner fittings GB/T 6067 crane safety regulations JT/T 557 port handling area lighting illuminance and its measurement

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 Heavy projectandheavyliftcargo Heavy, growing parts of goods and all kinds of machinery, equipment and vehicles. 3.2 Bracket liftingspreader For the major pieces when lifting sling to maintain a certain status, for vertical, horizontal or vertical and horizontal support a variety of structures. 3.3 Lifting balancing device liftingbalanceset Adjusting and maintaining balance when lifting major pieces of various mechanical devices.

4 Basic requirements

4.1 in the loading and unloading of the major pieces of their division of labor personnel shall receive appropriate professional and technical training, and passing the examination. 4.2 According to the characteristics of the major pieces of loading and unloading, the operating environment should meet the following requirements. a) loading and unloading operations in the region, the lighting illuminance shall comply with JT/T 557 requirements; B) When wind speed is greater than 12m/s, should stop using the floating crane lifted a major piece work; wind speed greater than 15m/s, the weight should be stopped Large lifting operations; c) marked with signs of major pieces of moisture, rain and snow should stop at the open-air operations; d) should be based on the actual situation of major pieces, equipped with appropriate fire safety facilities. 4.3 Before the job, you should understand the handling handling characteristics of major pieces and do the following.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 27875-2011_English be delivered?

Answer: Upon your order, we will start to translate GB/T 27875-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 27875-2011_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 27875-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.