|
US$209.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 24261.3-2010: Marine seismic digital streamer system -- Part 3: Central recording system Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 24261.3-2010 | English | 209 |
Add to Cart
|
3 days [Need to translate]
|
Marine seismic digital streamer system -- Part 3: Central recording system
| Valid |
GB/T 24261.3-2010
|
PDF similar to GB/T 24261.3-2010
Basic data | Standard ID | GB/T 24261.3-2010 (GB/T24261.3-2010) | | Description (Translated English) | Marine seismic digital streamer system -- Part 3: Central recording system | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | E92 | | Classification of International Standard | 75.180.10 | | Word Count Estimation | 9,950 | | Date of Issue | 2010-09-02 | | Date of Implementation | 2010-12-01 | | Quoted Standard | GB/T 191; GB/T 2421.1; GB/T 15464; GB/T 15479 | | Regulation (derived from) | National Standard Approval Announcement 2010 No.4 (Total No.159) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the petroleum marine streamer seismic acquisition digital recording system consisting of a central, requirements, test methods, inspection rules, signs, packaging, transport and storage. This section applies to equipment manufacturing, inspection and quality evaluation. |
GB/T 24261.3-2010: Marine seismic digital streamer system -- Part 3: Central recording system---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Marine seismic digital streamer system Part 3. Central recording system
ICS 75.180.10
E92
National Standards of People's Republic of China
Offshore oil digital streamer seismic acquisition system
Part 3. Central Records System
Part 3. Centralrecordingsystem
Issued on. 2010-09-02
2010-12-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
GB/T 24261 "digital oil offshore streamer seismic acquisition system" is divided into three parts.
--- Part 1. hydrophone technical conditions;
--- Part 2. hydrophone streamer technical conditions;
--- Part 3. central recording system.
This section GB/T 24261 Part 3.
Appendix A of this part is a normative appendix.
This part is proposed by the China National Offshore Oil Corporation.
This section is under the jurisdiction of oil Instrument Standardization Technical Committee.
This section drafted by. China National Offshore Oil Corporation Oilfield Services Limited Geophysical Exploration Division, China National Petroleum Group East
Geophysical Exploration Co., Ltd. Xi'an Branch of Geophysical Prospecting equipment, oil industry instrumentation Quality Supervision and Inspection Center, Ministry of Land Resources
Guangzhou Marine Geological Survey Bureau.
The main drafters of this section. to Cham sea, He Guoxin, Yin Zhenguo, Zhang Lu, Li Peichang, Hanze Xi, Chu Rongying, accounting Cao, Chen Jie, Han Xiaoquan,
Zhao, and even red.
Offshore oil digital streamer seismic acquisition system
Part 3. Central Records System
1 Scope
This section GB/T 24261 specifies the digital seismic acquisition offshore oil streamers central recording system (hereinafter referred to as equipment) composition,
Requirements, test methods, inspection rules, marking, packaging, transportation and storage.
This section applies to manufacturing, testing and quality assessment instrument.
2 Normative references
The following documents contain provisions which, through reference GB/T 24261 in this section constitute provisions of this section. For dated reference documents
Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section
Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this
section.
GB/T 191 Packaging - Pictorial signs
GB/T 2421.1 electric and electronic products environmental testing and Overview Guide
GB/T 15464 instrumentation packaging technology
GB/T 15479 Industrial Automation Instrumentation insulation resistance, dielectric strength technical requirements and test methods
3 Composition
Composition of the instrument include.
a) control box;
b) Human Interface. PC or workstation;
c) Quality Monitoring System. QA/QC workstation;
d) recording equipment;
e) plotter;
f) small printers;
g) assisting device comprises. an excitation source synchronous system.
4 Requirements
4.1 Environmental conditions
Environmental conditions shall include.
a) Operating Temperature. 10 ℃ ~ 40 ℃;
b) Storage Temperature. -40 ℃ ~ 70 ℃;
c) Relative humidity. 20% ~ 80%.
4.2 Technical Performance
Technical Requirements 4.2.1 Instruments should include.
a) the number of channels the channel capacity of the system;
b) the ability to measure line measuring the number of lines;
c) record length;
|