HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 22384-2024 English PDF

US$569.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 22384-2024: Inspection specification for security and stability control system of power system
Status: Valid

GB/T 22384: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 22384-2024English569 Add to Cart 5 days [Need to translate] Inspection specification for security and stability control system of power system Valid GB/T 22384-2024
GB/T 22384-2008English419 Add to Cart 3 days [Need to translate] Testing specification of security and stability control system for power system Valid GB/T 22384-2008

PDF similar to GB/T 22384-2024


Standard similar to GB/T 22384-2024

GB/T 38953   GB/T 37155.2   GB/T 19826   GB/T 22390.2   GB/T 22390.1   

Basic data

Standard ID GB/T 22384-2024 (GB/T22384-2024)
Description (Translated English) Inspection specification for security and stability control system of power system
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard K45
Classification of International Standard 29.240
Word Count Estimation 28,285
Date of Issue 2024-10-26
Date of Implementation 2025-05-01
Older Standard (superseded by this standard) GB/T 22384-2008
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 22384-2024: Inspection specification for security and stability control system of power system


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT22384-2024
ICS 29.240 CCSK45 National Standard of the People's Republic of China Replaces GB/T 22384-2008 Inspection specification for power system safety and stability control system Released on October 26, 2024 Implementation on May 1, 2025 State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 General Requirements 2 5 Inspection categories and requirements 3 6 Preparation before inspection 5 7 Inspection Items 6 8 On-site unpacking inspection 8 9 External Inspection 8 10 Insulation test 8 11 Working power supply inspection 9 12 Device Function Test 9 13 Interaction test between the device and the stability control information management system 13 14 Joint inspection of stability control system 15 15 Fibre Channel Inspection 18 16 Whole group test 18 17 Equipment commissioning inspection 19 18 System transmission test 20 Reference 22 Preface This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents". Drafting is required. This document replaces GB/T 22384-2008 "Test Specification for Safety and Stability Control Systems of Power Systems" and is In addition to structural adjustments and editorial changes, the main technical changes are as follows. --- Added terms and definitions (see Chapter 3); --- Added corresponding requirements before inspection work and network security protection requirements (see 4.1, 4.3); --- Changed the inspection classification (see 5.1, 4.1 of the.2008 edition); --- Added static test, dynamic test and system transmission test inspection methods, among which dynamic test includes dynamic whole group test and actual Digital simulation test (see 5.2); --- Changed the provisions for factory acceptance inspection and dynamic testing (see 5.3, 4.1 of the.2008 edition); --- Changed the provisions on full inspection cycle, partial inspection cycle and inspection scope (see 5.4.2.1, 4.2.1 of the.2008 edition); --- Added requirements for handling defects and problems found during inspection (see 5.5); --- Added the requirement to carry out risk point analysis and take safety precautions before inspection (see 6.2); --- Added preparations before factory acceptance inspection and system transmission test (see 6.3, 6.5); --- Changed the inspection items and requirements for each stage of the stability control system (see Chapter 7, Chapter 6 of the.2008 edition); --- Changed the insulation test content (see 10.2, 10.4, 9.2, 9.4 of the.2008 edition); --- Changed the test of data collection accuracy to allow comparison of device sampling with monitoring system sampling during partial testing (see 12.4.2, 11.4.2 of the.2008 edition); --- Added data collection of intelligent substation stabilization and control devices and GOOSE message reception and transmission inspection content (see 12.4.3, 12.5.4); --- Added the content of interaction inspection with the stability control information management system (see Chapter 13); --- Added inspection content for the interface between the stabilization control system and the DC control protection, and the interface between the new energy control system (see 14.6 and 14.7); --- Deleted the content related to carrier channel inspection (see 13.1 of the.2008 edition); --- Added the internal function of export transmission test, which can be carried out directly by using the export transmission menu of the device or the test setting value to start the device export mode. capacity, and requirements for DC emergency control (new energy rapid control) export transmission (see 16.2); --- Added the content of the method for calculating the time of the whole group action, and deleted the clear requirement that the time of the whole group action should meet 100ms (see 16.3); --- Added relevant content and requirements for system transmission test methods (see Chapter 18). Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document is proposed and coordinated by the China Electricity Council. This document was drafted by. China Southern Power Grid Co., Ltd., State Grid Corporation of China, Nanjing NARI Relay Protection Electric Co., Ltd., Power Dispatching and Control Center of Guangdong Power Grid Co., Ltd., China Southern Power Grid Research Institute Co., Ltd., State Grid Jibei Electric Power Co., Ltd. Yunnan Power Grid Co., Ltd., State Grid Chongqing Electric Power Company, Guizhou Power Grid Co., Ltd. Power Dispatching and Control Center, State Grid Electric Power Science Research Institute Co., Ltd., Guangxi Power Grid Co., Ltd., Shenzhen Power Supply Bureau Co., Ltd., NARI Technology Co., Ltd., NARI Technology Co., Ltd. Power Grid Security and Stability Control Technology Branch, State Grid Corporation of China Southwest Branch, Yunnan Power Grid Co., Ltd. Electric Power Research Institute of the Company, Central China Branch of State Grid Corporation of China, Hainan Power Grid Co., Ltd., Northwest Branch of State Grid Corporation of China Ministry of Electric Power, State Grid Sichuan Electric Power Company Electric Power Research Institute, State Grid Liaoning Electric Power Co., Ltd., State Grid Economic and Technological Research Institute Co., Ltd., Beijing Sifang Relay Protection Engineering Technology Co., Ltd., Guodian Nanjing Automation Co., Ltd., State Grid Corporation of China North China Branch, Beijing Bo Dianxinli Electric Co., Ltd. The main drafters of this document are. Qiu Jian, Xu Guanghu, Chen Xinghua, Zhang Jianxin, Mou Jianan, Wei Zun, Zhu Zexiang, Zhuang Bo, Huang He, Chang Dongxu, Zhang Dan, Yao Shuyou, Wang Guosong, Li Weiliang, Wang Changyuan, Liu Jinsheng, Xu Jianbing, Ren Zuyi, He Qiang, Yin Xuyang, Liu Jiayu, Xi Hanjiang, Xu Shoudong, Xia Shangxue, Jin Mingliang, Zhang Gang, Xu Yueyang, Zheng Yongkang, Na Guangyu, Li Zhe, Zhong Qidi, Chen Luofei, Xu Ke, Dong Peng, Xie Huifan, Liu Ruicai, Fu Chao, Chen Jinchang, Yang Huanhuan and Zhu Yihua. The previous versions of this document and the documents it replaces are as follows. ---First published in.2008 as GB/T 22384-2008; ---This is the first revision. Inspection specification for power system safety and stability control system 1 Scope This document specifies the overall inspection requirements, inspection classification and requirements, inspection The test preparation, test items and requirements are described, and the test methods for the inspection of power system safety and stability control systems are described. This document is applicable to the safety and stability control systems or safety and stability control devices of power generation enterprises or departments, power grid enterprises or departments and users. Design, manufacture, installation, commissioning, operation, maintenance and management of [abbreviated as “stabilization and control system (device)”]. 2 Normative references The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 7261 Basic test methods for relay protection and safety automatic devices GB 26860 Electricity Safety Work Regulations - Electrical Parts of Power Plants and Substations GB/T 34871 Specification for inspection and testing of relay protection for smart substations GB/T 36572 Guidelines for Cybersecurity Protection of Power Monitoring Systems GB/T 40091 Safety measures requirements for relay protection and grid safety automatic devices in smart substations GB/T 40587 Technical Specification for Power System Safety and Stability Control Systems DL/T 527 Technical requirements for power supply modules (modules) for relay protection and control devices DL/T 995 Inspection procedures for relay protection and power grid safety automatic devices DL/T 1092 General Technical Requirements for Power System Safety and Stability Control Systems DL/T 2544 Guidelines for Condition-Based Maintenance of Relay Protection Devices 3 Terms and Definitions The following terms and definitions apply to this document. 3.1 To ensure the stability of the power system when encountering large disturbances, control equipment is installed in power plants, substations or new energy stations to achieve Equipment with functions such as generator cutting, load shedding, rapid output reduction, DC emergency control, and rapid control of new energy sources such as wind power, photovoltaics, and energy storage. Note. referred to as stabilizing device. [Source. GB/T 40587-2021, 3.1] 3.2 A system consisting of two or more power plants and stations connected by communication equipment to achieve regional or larger-scale power Stable control of the force system. Note. referred to as stabilization control system. [Source. GB/T 40587-2021, 3.2]

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 22384-2024_English be delivered?

Answer: Upon your order, we will start to translate GB/T 22384-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 22384-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 22384-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 22384-2024?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 22384-2024 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.