|
US$239.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 22077-2023: Test method for creep of overhead conductors Status: Valid GB/T 22077: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 22077-2023 | English | 239 |
Add to Cart
|
3 days [Need to translate]
|
Test method for creep of overhead conductors
| Valid |
GB/T 22077-2023
|
| GB/T 22077-2008 | English | 399 |
Add to Cart
|
3 days [Need to translate]
|
Overhead electrical conductors -- Creep test procedures for stranded conductors
| Obsolete |
GB/T 22077-2008
|
PDF similar to GB/T 22077-2023
Basic data | Standard ID | GB/T 22077-2023 (GB/T22077-2023) | | Description (Translated English) | Test method for creep of overhead conductors | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | K11 | | Classification of International Standard | 29.060.10 | | Word Count Estimation | 11,194 | | Date of Issue | 2023-05-23 | | Date of Implementation | 2023-12-01 | | Older Standard (superseded by this standard) | GB/T 22077-2008 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 22077-2023: Test method for creep of overhead conductors---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 29:060:10
CCSK11
National Standards of People's Republic of China
Replacing GB/T 22077-2008
Test method for creep of overhead conductors
Released on 2023-05-23
2023-12-01 implementation
State Administration for Market Regulation
Released by the National Standardization Management Committee
table of contents
Preface I
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Test equipment 2
5 Sample 2
6 Temperature and temperature change 3
7 Load and Displacement Measurements 3
8 Test Step 3
9 Data Record 4
10 Data processing 4
11 Test report 4
Appendix A (informative) Note 6
Fig:1 Schematic diagram of typical layout of creep test 2
foreword
This document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents"
drafting:
This document replaces GB/T 22077-2008 "Creep test method for overhead conductors": Compared with GB/T 22077-2008, except for structural adjustment
In addition to rectification and editorial changes, the main technical changes are as follows:
--- Deleted the normative references (see Chapter 2, Chapter 2 of the:2008 edition);
--- Changed the definition of loading time (see 3:5, 3:5 of the:2008 edition);
--- Deleted the terms and definitions of creep testing machine and end (see 3:7 and 3:8 of the:2008 edition);
--- Increased the terms and definitions of creep, normal temperature creep test and high temperature creep test (see 3:7, 3:8 and 3:9);
--- Changed the requirements for test equipment (see Chapter 4, Chapter 4 of the:2008 edition);
--- Changed the method of sample selection and preparation (see 5:1 and 5:2, 5:1 and 5:2 of the:2008 edition);
--- Added the test temperature and heating method of the high temperature creep test (see 6:1);
--- Added the temperature change of the high temperature creep test (see 6:2);
--- Deleted the temperature compensation (see 6:3 of the:2008 edition);
--- Changed the test load requirements (see 7:1, 7:1 of the:2008 edition);
--- Increased high temperature creep test steps [see Chapter 8 c)];
--- Changed the data record (see Chapter 9, Chapter 9 of the:2008 edition);
--- Increased test report (see Chapter 11):
This document is modified to adopt IEC 61395:1998 "Creep Test Procedure for Stranded Aerial Conductors":
Compared with IEC 61395:1998, this document has made the following structural adjustments:
---6:1 corresponds to the suspension section in Chapter 6 of IEC 61395:1998, and 6:2 corresponds to 6:1 of IEC 61395:1998;
--- Added Chapter 11 "Test Report":
The technical differences between this document and IEC 61395:1998 and their reasons are as follows:
--- Deleted the normative reference documents, this document is not limited to the overhead conductors specified in GB/T 1179, but also applies to standards in this field
Stranded wire products involved in other product standards in the system;
---Changed the definition of the term "loading time", deleted the terms "creep tester" and "end", added the term "creep" and "normal temperature
"creep test" and "high temperature creep test" to reflect the actual test operation and understanding of this revised content;
--- Changed the accuracy requirements for the load loading device and displacement measuring device of the test equipment to ensure the reliability of the test results;
--- Added the sample preparation method for crimping of fittings to reflect the actual test operation, making this document applicable to more overhead conductors
product;
--- Added the requirements for high temperature creep test to meet the requirements of this type of test for standardized documents, which is also the main content of the revision of this document
content one;
--- Added requirements for test reports, providing unified requirements for third-party testing agencies to issue test reports:
The following editorial changes have been made to this document:
--- In order to coordinate with existing standards, change the name of the standard to "Creep Test Method for Overhead Conductors":
Please note that some contents of this document may refer to patents: The issuing agency of this document assumes no responsibility for identifying patents:
This document is proposed by China Electrical Equipment Industry Association:
This document is under the jurisdiction of the National Bare Wire Standardization Technical Committee (SAC/TC422):
This document is drafted by: Shanghai National Cable Testing Co:, Ltd:, Shanghai Electric Cable Research Institute Co:, Ltd:, China Electric Power Research Institute Co:, Ltd:
Co:, Ltd:, China Power Engineering Consulting Group East China Electric Power Design Institute Co:, Ltd:, China Power Engineering Consulting Group Zhongnan Electric Power Design Institute Co:, Ltd:
Company, Far East Cable Co:, Ltd:, Shanghai Zhongtian Aluminum Wire Co:, Ltd:, Jiangsu Hengtong Electric Power Special Conductor Co:, Ltd:, Yunnan Duobao Cable Group
Co:, Ltd:, Jiangsu Tongguang Power Transmission Line Technology Co:, Ltd:, Qingdao Hanhe Cable Co:, Ltd:, Wuxi Jiangnan Cable Co:, Ltd:, He
Nantongda Cable Co:, Ltd:, Chongqing Taishan Cable Co:, Ltd:, Guangdong Xinyaguang Cable Co:, Ltd:, Changzhou SD Huayin Electric Wire Co:, Ltd:
cable co:, ltd:
The main drafters of this document: Ding Zhenpei, Zheng Qiu, Wang Xu, Wang Jingchao, Kang Xiaojuan, Bai Xiaolu, Xu Jing, You Weiren, Yang Lijun, Jiang Lusi,
Shi Haifeng, Zhao Xinyuan, Zhang Chuansheng, Wang Junqi, Xing Shoujiang, He Yunping, Gao Zhan:
The release status of previous versions of this document and the documents it replaces are as follows:
---It was first published as GB/T 22077-2008 in:2008;
--- This is the first revision:
Test method for creep of overhead conductors
1 Scope
This document describes the test equipment, specimens, temperature and temperature changes, load and displacement measurements, test procedure for creep tests on overhead conductors:
procedures, data recording, data processing and test reporting:
This document applies to the uninterrupted creep test of earth conductors for overhead transmission lines:
2 Normative references
This document has no normative references:
3 Terms and Definitions
The following terms and definitions apply to this document:
3:1
Sample length samplelength
The total length of wire between two mounting ends:
3:2
gauge length gaugelength
The original length of the portion of wire used to test for creep:
3:3
Test temperature testtemperature
The average temperature of three pre-specified points within the gauge length; if there are more than three temperature measurement points, it is the uniformly distributed temperature measurement point within the gauge length
The average temperature of the hot spot:
3:4
Test load testload
The constant tension to which the wire is subjected during the test:
3:5
loading time loading time
The time from pre-applied test load to test load:
3:6
durationoftest
The time from loading the test load to the end of the test:
3:7
creep creep
Permanent elongation of the conductor due to the test load:
3:8
Creep test of wire at 20°C:
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 22077-2023_English be delivered?Answer: Upon your order, we will start to translate GB/T 22077-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 22077-2023_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 22077-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 22077-2023?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 22077-2023 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|