US$139.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 19962-2016: Technical rule for connecting geothermal power plant to power system Status: Valid GB/T 19962: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 19962-2016 | English | 139 |
Add to Cart
|
3 days [Need to translate]
|
Technical rule for connecting geothermal power plant to power system
| Valid |
GB/T 19962-2016
|
| GB/T 19962-2005 | English | 359 |
Add to Cart
|
3 days [Need to translate]
|
Technical rule for connecting geothermal power plant to power network
| Obsolete |
GB/T 19962-2005
|
PDF similar to GB/T 19962-2016
Standard similar to GB/T 19962-2016 GB/T 19964 GB/T 51063 NB/T 32012
Basic data | Standard ID | GB/T 19962-2016 (GB/T19962-2016) | | Description (Translated English) | Technical rule for connecting geothermal power plant to power system | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F15 | | Classification of International Standard | 27.180 | | Word Count Estimation | 7,783 | | Date of Issue | 2005-12-12 | | Date of Implementation | 2017-03-01 | | Older Standard (superseded by this standard) | GB/T 19962-2005 | | Regulation (derived from) | National Standard Announcement 2016 No.14 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 19962-2016: Technical rule for connecting geothermal power plant to power system---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical rule for connecting geothermal power plant to power system
ICS 27.180
F15
National Standards of People's Republic of China
Replacing GB/T .19962-2005
Technical specification for power system of geothermal power station
2016-08-29 released
2017-03-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of the People 's Republic of China
China National Standardization Management Committee released
Foreword
This standard is drafted in accordance with the rules given in GB/T 1.1-2009.
This standard replaces GB/T .19962-2005 "geothermal power station access power system technical regulations".
Compared with GB/T .19962-2005, the main technical changes are as follows.
--- increase the active power, reactive power, voltage control, operational adaptability, power quality, relay protection and safety automatic device, scheduling
Automation, communication system related technical provisions content;
--- removed the power balance, power station access system program, power flow calculation, short circuit current and other electrical calculation, the program economy comparison
And other relevant technical provisions.
This standard is proposed by the National Energy Board.
This standard is under the jurisdiction of the National Electricity Regulatory Standardization Technical Committee (SAC/TC296).
The drafting unit of this standard. China Electric Power Engineering Consulting Group Southwest Electric Power Design Institute Co., Ltd.
The main drafters of this standard. Zheng Yong, Yu Xi, Chen Lei, Mei Tao, Bai Zhidan, Zhou Yanrong, Li Bin, Wu Anping.
Technical specification for power system of geothermal power station
1 Scope
This standard specifies the active power, reactive power, voltage control, operational adaptability, power quality, and electrical power of the connected power system of the geothermal power plant
Pressure level and wiring, relay protection and safety automatic devices, dispatch automation, communication systems and other technical requirements.
This standard applies to 35kV and above through the voltage level lines and power systems connected to the new (change, expansion) built thermal power plant.
Through other voltage levels connected to the power system of geothermal power plants, refer to the implementation.
2 normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article
Pieces. For undated references, the latest edition (including all modifications) applies to this document.
GB/T 12325 power quality supply voltage deviation
GB/T 12326 Power quality voltage fluctuation and flicker
Technical specification for relay protection and safety automatic device GB/T 14285
Technical Guidelines for Safety and Stability Control of Power System of DL/T 723
Guide for Safety and Stability of DL755 Power System
DL/T 1040 grid operating guidelines
Technical specification for automatic design of DL/T 5003 power system dispatch
Technical specification for DL/T 5404 power system synchronous digital series (SDH) optical cable communication engineering design
"Regulations on the Safety Protection of Electric Power Monitoring System" (Decree No. 14 of the National Development and Reform Commission of the People's Republic of China)
3 terms and definitions
The following terms and definitions apply to this document.
3.1
Geothermal geothermal
From the deep crust, stored in the underground rock and rock pore fissures in the natural heat. According to the temperature can be divided into low temperature, medium temperature and high temperature
Geothermal. It constitutes geothermal energy and geothermal resources. According to the state of existence can be divided into hydrothermal type (including steam type, water vapor type and hot water type), dry heat type
(Including dry and hot rock type, magma type) and ground pressure (including ultra-high pressure, ultra-high temperature, with combustible gas), belonging to the renewable resources of the complex
Source - energy mineral.
3.2
Geothermal power generation
The use of geothermal fluid carried by the thermal energy into electricity power generation.
3.3
Geothermal power plant
A power station that generates electricity by means of thermal energy carried by geothermal fluids.
3.4
Dotted connection
Geothermal power station boost station high pressure side bus or node.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 19962-2016_English be delivered?Answer: Upon your order, we will start to translate GB/T 19962-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 19962-2016_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 19962-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 19962-2016?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 19962-2016 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|