|
US$254.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 19831.2-2008: Petroleum and natural gas industries -- Equipment for well cementing -- Part 2: Centralizer placement and stop-collar testing Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 19831.2-2008 | English | 254 |
Add to Cart
|
3 days [Need to translate]
|
Petroleum and natural gas industries -- Equipment for well cementing -- Part 2: Centralizer placement and stop-collar testing
| Valid |
GB/T 19831.2-2008
|
PDF similar to GB/T 19831.2-2008
Basic data | Standard ID | GB/T 19831.2-2008 (GB/T19831.2-2008) | | Description (Translated English) | Petroleum and natural gas industries -- Equipment for well cementing -- Part 2: Centralizer placement and stop-collar testing | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | E92 | | Classification of International Standard | 75.180.10 | | Word Count Estimation | 13,176 | | Date of Issue | 2008-08-28 | | Date of Implementation | 2009-03-01 | | Adopted Standard | ISO 10427-2-2004, IDT | | Regulation (derived from) | National Standard Approval Announcement 2008 No.14 (Total No.127) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the method for calculating the performance parameters and centralizer centralizer placed pitch. This section also provides a ring test procedures and test results reporting requirements only. |
GB/T 19831.2-2008: Petroleum and natural gas industries -- Equipment for well cementing -- Part 2: Centralizer placement and stop-collar testing ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Petroleum and natural gas industries Equipment for well cementing Part 2. Centralizer placement and stop-collar testing
ICS 75.180.10
E92
National Standards of People's Republic of China
GB/T 19831.2-2008/ISO 10427 2.? 2004
Cementing oil and gas industry equipment
Part 2. centralizer placement and snap ring test
(ISO 10427 2.? 2004, IDT)
Posted 2008-08-28
2009-03-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
GB/T 19831 is divided into two parts.
--- Petroleum and natural gas industries - Casing centralizers - Part 1. Bow - spring casing centralizers
--- Cementing oil and gas industry equipment - Part 2. centralizer placement and snap ring test
This section GB/T 19831 Part 2.
This part identical with ISO 10427 2.? 2004 "oil and gas industry --- --- centralizer cementing equipment placement and testing stopper ring
Again "(in English).
For ease of use, this section made the following editorial changes.
a) "ISO 10427 Part" be replaced by "this section";
b) use a decimal point instead of a decimal comma ",". ",";
c) Remove the ISO 10427 2.? 2004 foreword and introduction, an increase of this preface.
Appendix A of this section is an informative annex.
This part of the National Standardization Committee drilling equipment and tools Petroleum (SAC/TC96) and focal points.
This section is responsible for drafting unit. Petroleum Industry downhole tool Quality Supervision and Inspection Center.
Participated in the drafting of this section. Daqing plant falling centralizer, Texas Institute of Petroleum Drilling.
The main drafters of this section. Wang Han Yang, Tian Xiaoyan, Zhang Hulin, late Qing Bin, Malan Rong, Qin Jinli.
This section first release.
GB/T 19831.2-2008/ISO 10427 2.? 2004
Cementing oil and gas industry equipment
Part 2. centralizer placement and snap ring test
1 Scope
This section provides a dogleg and deviated wells to determine the placement pitch centralizer centralizer according to performance parameters and deviation from the required clearance
Calculation Method. This section also provides a ring test procedures and test results reporting requirements only.
2 Normative references
The following documents contain provisions which, through reference GB/T 19831 in this section constitute provisions of this section. For dated reference documents
Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section
Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this
section.
GB/T 19830-2005 oil and gas industry oil and gas well casing or tubing with a steel pipe (ISO 11960.2001, IDT)
3 Terms and Definitions
The following terms and definitions apply to this part of the GB/T 19831 of.
3.1
Borehole diameter and the outer diameter of the sleeve half the difference.
3.2
After bow spring centralizer sheet is repeatedly flexed its height variations bow.
Note. The bow spring centralizers are repeatedly flexing after 12 times, that is considered to have reached the permanent deformation.
3.3
3 times a predetermined minimum reset force (± 5%) after bow spring biasing piece is considered to be the deflection bow spring sheet.
NOTE. The specified minimum value reset force see GB/T 19831.1-2005 Table 1.
[GB/T 19831.1-2005, Definition 3.1]
3.4
The snap ring or fixed to the casing centralizer device.
Example. screws, ratchet, mechanical clamps and epoxy resins.
[GB/T 19831.1-2005, the definition 3.2]
3.5
The stopper ring slip desired maximum force on the sleeve.
[GB/T 19831.1-2005, the definition 3.3]
3.6
Borehole diameter.
[GB/T 19831.1-2005, the definition 3.4]
GB/T 19831.2-2008/ISO 10427 2.? 2004
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 19831.2-2008_English be delivered?Answer: Upon your order, we will start to translate GB/T 19831.2-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 19831.2-2008_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 19831.2-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|