Specification for start-up test of reversible pumped-storage units
| Valid |
GB/T 18482-2010
|
GB/T 18482-2001 | English | 679 |
Add to Cart
|
5 days [Need to translate]
|
Start-up test code for reversible pump-storage units
| Obsolete |
GB/T 18482-2001
|
PDF similar to GB/T 18482-2010
Standard similar to GB/T 18482-2010 GB 13172
Basic data Standard ID | GB/T 18482-2010 (GB/T18482-2010) | Description (Translated English) | Specification for start-up test of reversible pumped-storage units | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | F59 | Classification of International Standard | 27.140 | Word Count Estimation | 33,317 | Date of Issue | 2010-12-23 | Date of Implementation | 2011-05-01 | Older Standard (superseded by this standard) | GB/T 18482-2001 | Quoted Standard | GB/T 8564; GB/T 22581-2008; GB 50150-2006; DL/T 507; DL/T 5123-2000 | Regulation (derived from) | National Standard Approval Announcement 2010 No.10 (Total No.165) | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | Summary | This standard specifies the reversible pumped storage units start trial operation test procedures and technical requirements. This standard applies to start commissioning and acceptance testing and handover unit capacity of 150 MW and above Francis reversible pumped storage units. Single-engine capacity of less than 150MW Francis reversible units or other types of pumped storage units available for implementation. |
GB/T 18482-2010: Specification for start-up test of reversible pumped-storage units---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Specification for start-up test of reversible pumped-storage units
ICS 27.140
F59
National Standards of People's Republic of China
Replacing GB/T 18482-2001
Reversible pumped storage units start trial operation procedure
Issued on. 2010-12-23
2011-05-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
Introduction Ⅳ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 General 2
5 Start mode selection unit 3
6 inspection equipment segment commissioning and trial operation started before 3
7 7 power receiving station
8 units runner water-filled test 9
9 start test pump working 10
10 test pump working 14 PM
11 Water Pumps and pumping down test 15
12 turbine start-up and load test condition 16
13 turbine operating conditions in parallel and load test 21
14 LCU automatically open, stop and test operating conditions to convert 23
15 power monitoring system automatically open, stop, operating conditions and converted into a group of 24 test adjustment
16 unit 15d assessment test run and the transfer of inspection 25
Appendix A (informative) reversible pumped storage units start trial run organization and working procedures 26
Annex B (informative) reversible pumped storage units start trial operation should handover acceptance information directory 28
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard replaces GB/T 18482-2001 "reversible pumped storage units start test procedures", and GB/T 18482-2001 phase
Than the main modifications are as follows.
--- Modify the scope of the standard will be applied by the unit capacity of 15MW to 150MW;
--- Complements reversible turbine units in the conditions of the test content, an increase of "turbine starts working conditions and load test", "water
Marine conditions in parallel and load test "two chapters;
--- Amendment supplements the "terms and definitions" in the highlights;
--- Recommended on different principles to select the next condition under impoundment reversible pumped storage units started manner;
--- Deleting Pump Cases "asynchronous start" mode of content;
--- Summarized units and related equipment "debugging division" of the project content, detailed inspection before starting the test run;
--- Added "unit test runner filled with water", "electric power station by" two chapters;
--- This standard is still focused on start-up trial run pump test conditions recommended by the working conditions in order to start the pump station as the first desktop PC
Group first started to test the way the procedural arrangements;
--- Partially absorb the relevant technical requirements of imported units start test equipment and strengthen the reversible units domestic technology requirements
Regulations;
--- The ultimate test of reversible storage units manufacture, installation of an integrated quality assessment test run time modifications from 30d to 15d, and
Assessment test run of the "break" the provisions made appropriate changes;
--- Increase the informative appendix.
This standard is proposed and managed by the China Electricity Council.
This standard is mainly drafted by. State Grid Xinyuan Holdings Ltd., China Water Conservancy and Hydropower Construction Corporation.
Participated in the drafting of this standard. Shandong Taishan Pumped Storage Power Station Co., LYS Pumped Storage Co., China
Hydropower Engineering Consulting Group ECIDI, China Water Conservancy and Hydropower Engineering Bureau fourth Co., Ltd. East China Yixing Pumped Storage,
Fifth China Water Conservancy and Hydropower Engineering Bureau Co., China Water Conservancy and Hydropower Engineering Bureau XIV Ltd., Shandong Electric Power Research Institute of Electrical Engineering
Studies, China Water Conservancy and Hydropower Engineering Bureau Limited.
The main drafters of this standard. Wu promised to pay the early Yuan Dynasty, Ma collar, Song Rui Feng, Li Yu Zhen, Ji Zhenwei, Remoulding the Da-Peng Chen, Lihong Chun,
Huangzu Guang, Li Yong, Hu Xueqin, Xie Feng, Wang Zan, Lilin You.
This standard was first issued on November 2, 2001, this is the first revision.
Introduction
This standard is a pumped storage power plant units and supporting equipment to start testing and assessment and acceptance of the basis for this standard is GB/T 18482-
2001 "reversible pumped storage units start test procedures" (hereinafter referred to as the original standard) amendments. Original standard for the year 2001, domestic
Pumped storage power station has been built reversible units start test technology summary. After engineering practice, especially in recent years a large number of import and country
It has been put into production of reversible pumped storage units devices, such testing techniques start to mature, the unit start-up mode further cooperation
Management, to further standardize the transfer of inspection work. To further enhance the level of storage technology development, achieve energy efficiency and accelerate the progress of the project, to ensure
Start testing and quality examination and testing purposes, in accordance with the requirements of national standardization authorities, the original standard revision.
Reversible pumped storage units start trial operation procedure
1 Scope
This standard specifies the reversible pumped storage units start operation test procedures and technical requirements.
Start operation test and transfer This standard applies to stand-alone capacity of 150MW and above Francis reversible pumped storage units
acceptance.
Stand-alone capacity of less than 150MW Francis reversible units or other types of pumped storage unit can be implemented by reference.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 8564 Specification for installation of hydro-generating unit
GB/T 22581-2008 Francis pump turbine basic technical requirements
GB 50150-2006 works of electrical installations electrical equipment handover test standard
DL/T 507 hydroelectric generating set to start testing procedures
The basic construction of DL/T 5123-2000 Hydropower acceptance procedures
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Reversible pumped storage units reversiblepumped-storageunit
Hydraulic pumps and turbines have two ways of working and both rotating directions, pump-turbine and generator-motor and consists of
Unit, called reversible pumped storage units (hereinafter referred to as units).
3.2
Equipment Division debugging equipmentpre-commissioning
After each individual equipment and the associated equipment, devices, and other automation components connected to form a relatively independent subsystems were
Joint commissioning process, mechanical, electrical, control and other parts.
3.3
Units start trial operation unitstart-uptesting
After reversible pumped storage units complete equipment division commissioning, start a series of tests carried out before the process. Including pumps start conditions
Test, test turbine start conditions, pump working phasing test, stop the pump and pumping test, with a load unit load rejection test, various working
Case conversion test, 15d assessment test run.
3.4
Abnormally low lift extremelyminimumpumphead
Pump/turbine pumps in extreme conditions allow the lowest lift operation.
3.5
Initiate a loop startingcircuit
Pump unit is set to start operating mode once the electrical circuit.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 18482-2010_English be delivered?Answer: Upon your order, we will start to translate GB/T 18482-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 18482-2010_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 18482-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 18482-2010?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 18482-2010 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|