US$174.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 18268.24-2010: Electrical equipment for measurement, control and laboratory use -- EMC requirements -- Part 24: Particular requirements -- Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 18268.24-2010 | English | 174 |
Add to Cart
|
3 days [Need to translate]
|
Electrical equipment for measurement, control and laboratory use -- EMC requirements -- Part 24: Particular requirements -- Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and
| Valid |
GB/T 18268.24-2010
|
PDF similar to GB/T 18268.24-2010
Basic data Standard ID | GB/T 18268.24-2010 (GB/T18268.24-2010) | Description (Translated English) | Electrical equipment for measurement, control and laboratory use -- EMC requirements -- Part 24: Particular requirements -- Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | N10 | Classification of International Standard | 25.040.40; 33.100; 17.220 | Word Count Estimation | 9,958 | Date of Issue | 2011-01-14 | Date of Implementation | 2011-05-01 | Quoted Standard | GB/T 18268.1; GB 4824; GB/T 17626.2; GB/T 17626.3; GB/T 17626.4; GB/T 17626.5; GB/T 17626.6; GB/T 17626.8; GB/T 17626.11; GB/T 18568.1-2010; IEC 61557-8-2007; IEC 61557-9-1999 | Adopted Standard | IEC 61326-2-4-2006, IDT | Regulation (derived from) | National Standard Approval Announcement 2011 No.2 | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | Summary | This standard applies to permanent or semi-permanent connection to the distribution system insulation monitoring device and insulation fault location equipment. |
GB/T 18268.24-2010: Electrical equipment for measurement, control and laboratory use -- EMC requirements -- Part 24: Particular requirements -- Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Electrical equipment for measurement, control and laboratory use EMC requirements Part 24.. Particular requirements Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and for eq
ICS 25.040.40; 33.100; 17.220
N10
National Standards of People's Republic of China
Electrical equipment for measurement, control and laboratory use
EMC requirements - Part 24. Particular requirements
Insulation monitoring device in line with IEC 61557-8 and
Compliance with IEC 61557-9 insulation fault location device
Test configurations, working conditions and performance criteria
Electricalequipmentformeasurement, controlandlaboratoryuse-
EMCrequirements-Part 24. Particularrequirements-
Testconfigurations, operationalconditionsand
accordingtoIEC 61557-8andforequipmentfor
insulationfaultlocationaccordingtoIEC 61557-9
(IEC 61326-2-4.2006, IDT)
Issued on. 2011-01-14 2011-05-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
GB/T 18268 "for measurement, control and laboratory use EMC requirements for electrical equipment" consists of the following components.
--- Part 1. General requirements
--- PART 21. Particular requirements for electromagnetic compatible test configuration with a protective case sensitivity test and measurement equipment, working conditions
And performance criteria
--- Part 22. Particular requirements for low-voltage distribution systems with a portable test, measuring and monitoring equipment test configuration, working conditions and
Performance criteria
--- Part 23. Particular requirements Test configurations with integrated or remote signal conditioning transmitter, working conditions and performance criteria
--- Part 24. Particular requirements for compliance with IEC 61557-8 insulation monitoring device and comply with IEC 61557-9 insulation faults fixed
Test configuration bits of equipment, working conditions and performance criteria
--- Part 25. Particular requirements for interface conforms to IEC 61784-1, the test configuration of field devices CP3/2, working conditions and sexual
Energy criterion
--- Part 26. Particular requirements for in vitro diagnostic (IVD) medical equipment
--- Part 31. execution or ready to perform safety functions (functional safety) equipment immunity requirements for general industrial applications
--- Part 32. perform or ready to perform safety functions (functional safety) equipment immunity requirements specified electromagnetic environment
Industrial applications
This part of GB/T 18268 of Part 24.
This section identical with IEC 61326-2-4.2006 (first edition) Electrical equipment compatibility requirements "for measurement, control and laboratory use
Part 2-4. Particular requirements for insulation monitoring devices meet the IEC 61557-8 and IEC 61557-9 compliance with insulation fault location device
The test configuration, operating conditions and performance criteria. "
This section is equivalent translation IEC 61326-2-4.2006.
This section based on GB/T 1.1-2000 "Standardization Guide Part 1. Standard structure and writing rules" and
GB/T 20000.2-2001. the relevant provisions of "Standardization Guide Part 2 rules of international standards," the editorial the following
modify.
--- Remove the foreword and introduction of international standards;
--- "IEC 61326 this part" to "GB/T 18268 in this section";
--- Original language reference guide documents according to the provisions of GB/T 1.1-2000 changed to normative documents referenced introductory phrase;
--- With a decimal point "." Instead of a comma as the decimal point "."
International standards used in this part, the additional content of each chapter are used special numbers such as 3.101,5.3.101,6.1.101, so as to
Show the difference. This section is identical with the light of international standards, consistent with international standards, this section does not make changes.
This part is proposed by China Machinery Industry Federation.
This part of the measurement and control of Standardization Technical Committee (SAC/TC124) is administered by the National industrial processes.
This section is responsible for drafting unit. Shanghai Institute of Industrial Automation Instrumentation.
Participated in the drafting of this section. Shanghai Automation Instrumentation System Inspection and Testing Institute, Fujian on the Run Precision Instrument Co., Ltd.
The main drafters of this section. Wang Ying, Zhang Jie, Li Minghua, Ge Jian, Hong Ji Ye.
This section first release.
Electrical equipment for measurement, control and laboratory use
EMC requirements - Part 24. Particular requirements
Insulation monitoring device in line with IEC 61557-8 and
Compliance with IEC 61557-9 insulation fault location device
Test configurations, working conditions and performance criteria
1 Scope
GB/T 18268.1 Chapter 1 apply to this section and attach the following.
GB/T 18268 in this section than the GB/T sets out in more detail the following test configuration uses the equipment, working conditions and sexual 18268.1
Energy criterion.
--- In line with the IEC 61557-8 Insulation monitoring device;
--- In line with IEC 61557-9 for insulation fault location equipment.
This section applies to insulation monitoring device permanently or semi-permanently connected to the distribution system and insulation fault location equipment.
2 Normative references
The following documents contain provisions which, through reference GB/T 18268 in this section constitute provisions of this section. For dated reference documents
Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section
Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this
section.
GB/T 18268.1 Chapter 2 apply to this section and attach the following.
GB 4824 industrial, scientific and medical (ISM) radio-frequency equipment - Electromagnetic disturbance characteristics - Limits and methods of measurement (GB 4824-2004,
CISPR11.2003, IDT)
GB/T 17626.2 Electromagnetic compatibility Testing and measurement techniques - Electrostatic discharge immunity test (GB/T 17626.2-2006,
IEC 61000-4-2.2001, IDT)
GB/T 17626.3 electromagnetic compatibility test and measurement technology RFEMS test (GB/T 17626.3-
2006, IEC 61000-4-3.2002, IDT)
GB/T 17626.4 Electromagnetic compatibility Testing and measurement techniques - Electrical fast transient burst immunity test (GB/T 17626.4-
2008, IEC 61000-4-4.2004, IDT)
GB/T 17626.5 electromagnetic compatibility test and measurement technology surge (impact) immunity test (GB/T 17626.5-2008,
IEC 61000-4-5.2005, IDT)
GB/T 17626.6 electromagnetic compatibility test and measurement technology RF field induced immunity to conducted disturbances (GB/T 17626.6-
2008, IEC 61000-4-6.2006, IDT)
GB/T 17626.8 Electromagnetic compatibility Testing and measurement techniques - Power frequency magnetic field immunity test (GB/T 17626.8-2006,
IEC 61000-4-8.2001, IDT)
GB/T 17626.11 Electromagnetic compatibility Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity tests
(GB/T 17626.11-2008, IEC 61000-4-11.2004, IDT)
Electrical equipment EMC requirements - Part GB/T 18268.1-2010 measurement, control and laboratory use 1. General requirements
(IEC 61326-1.2005, IDT)
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 18268.24-2010_English be delivered?Answer: Upon your order, we will start to translate GB/T 18268.24-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 18268.24-2010_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 18268.24-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|