|
US$1519.00 · In stock Delivery: <= 9 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 17744-2020: Petroleum and natural gas industries - Drilling and well servicing equipment Status: Valid GB/T 17744: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 17744-2020 | English | 1519 |
Add to Cart
|
9 days [Need to translate]
|
Petroleum and natural gas industries - Drilling and well servicing equipment
| Valid |
GB/T 17744-2020
|
| GB/T 17744-2015 | English | RFQ |
ASK
|
10 days [Need to translate]
|
Petroleum and natural gas industries -- Drilling and well servicing equipment
| Obsolete |
GB/T 17744-2015
|
| GB/T 17744-2008 | English | RFQ |
ASK
|
14 days [Need to translate]
|
Petroleum and natural gas industries -- Drilling and well servicing equipment
| Obsolete |
GB/T 17744-2008
|
| GB/T 17744-1999 | English | RFQ |
ASK
|
11 days [Need to translate]
|
Specification for drilling equipment
| Obsolete |
GB/T 17744-1999
|
PDF similar to GB/T 17744-2020
Basic data | Standard ID | GB/T 17744-2020 (GB/T17744-2020) | | Description (Translated English) | Petroleum and natural gas industries - Drilling and well servicing equipment | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | E92 | | Classification of International Standard | 75.180.10 | | Word Count Estimation | 82,884 | | Date of Issue | 2020-12-14 | | Date of Implementation | 2021-11-01 | | Older Standard (superseded by this standard) | GB/T 17744-2015 | | Regulation (derived from) | National Standard Announcement No. 28 of 2020 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 17744-2020: Petroleum and natural gas industries - Drilling and well servicing equipment---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Oil and gas industry drilling and workover equipment)
ICS 75:180:10
E92
National Standards of People's Republic of China
Replace GB/T 17744-2015
Oil and gas industry drilling and workover equipment
2020-12-14 release
2021-11-01 implementation
State Administration for Market Regulation
Issued by the National Standardization Management Committee
Table of contents
Preface Ⅴ
1 Scope 1
2 Normative references 1
3 Terms and definitions, abbreviations 3
3:1 Terms and definitions 3
3:2 Abbreviations 7
4 Design 8
4:1 Design conditions 8
4:2 Strength analysis 8
4:3 Size class code 9
4:4 Rating 9
4:5 The rated load value is based on 9
4:6 Design safety factor 9
4:7 Shear strength 10
4:8 Specific equipment 10
4:9 Design files 10
5 Design verification 10
5:1 General 10
5:2 Design verification function test 11
5:3 Design verification pressure test 11
5:4 Design verification load test 12
5:5 Determination of rated load 12
5:6 Alternative Design Verification Test Procedure and Rating Calculation 13
5:7 Load test device 13
5:8 Design changes 14
5:9 Record 14
6 Material requirements 14
6:1 General 14
6:2 Written specifications 14
6:3 Metallic materials 14
6:4 Non-metallic and composite materials 18
7 Welding requirements 19
7:1 General 19
7:2 Welding qualification 20
7:3 Written documents 20
7:4 Welding consumables control 20
7:5 Weld performance 20
7:6 Post-weld heat treatment (PWHT) 20
7:7 Quality control requirements 20
7:8 Specific requirements-group welding 20
7:9 Specific requirements-repair welding 20
8 Quality control 21
8:1 General 21
8:2 Qualification of quality control personnel 21
8:3 Test equipment 21
8:4 Quality control of specific equipment and parts 21
8:5 Dimension verification 25
8:6 Proof load test 25
8:7 Hydrostatic pressure test 26
8:8 Function test 26
8:9 Process for requiring confirmation 26
9 Equipment 27
9:1 General 27
9:2 Turntable 27
9:3 Turntable Filling the Heart 34
9:4 Slip seat 34
9:5 Turntable slip 35
9:6 Chuck 36
9:7 High-pressure drilling fluid hose and high-pressure cement hose 37
9:8 Piston drilling pump parts 45
9:9 Winch parts 51
9:10 Manual pliers 52
9:11 Safety slips not used as lifting equipment 53
9:12 Blowout preventer (BOP) transport systems and equipment 53
9:13 Pressure relief device of high pressure drilling fluid circulation system 60
9:14 pliers tail rope 62
9:15 Rolling bearings 63
10 Mark 63
10:1 Product marking 63
10:2 Marking requirements 64
11 File 64
11:1 Record keeping 64
11:2 Files saved by the manufacturer 64
11:3 Random files carried by the device 64
Appendix A
(Normative appendix) Additional requirements 66
Appendix B
(Informative appendix) Heat treatment/thermal operation equipment qualification guide 68
Appendix C
(Informative appendix) Load limit design of manual tongs 70
Appendix D
(Informative appendix) Product order information 73
References 76
Foreword
This standard is in accordance with GB/T
Drafting of the rules given in 1:1-2009:
This standard replaces GB/T
17744-2015 "Petroleum and natural gas industry drilling and workover equipment", with GB/T
17744-2015 phase
The main technical changes are as follows:
---In the "scope", 7 types of equipment have been deleted and 3 types of equipment have been added (see Chapter 1, Chapter 1 of the:2015 edition);
---Delete the requirements for power tongs and other equipment in the design, and increase the requirements for turntable slips, slip seats, etc: (see 4:1, 4:4, 4:6,:2015
Version 4:1, 4:4, 4:6);
--- Modify the formula (3) in the design verification load test to Table 3 (see 5:4:3, 5:4:3 of the:2015 edition);
---Added the requirements for non-metallic materials (see 6:4);
---Added the requirements of acceptance criteria for non-metallic parts (see 8:4:7:5);
---The process of requiring confirmation has been added (see 8:9);
---Modified some of the requirements in the heart of the turntable (see 9:3, 9:3 in the:2015 edition);
---Deleted the content of standard turntable slips and non-standard turntable slips (see 9:4 and 9:5 in the:2015 edition);
---The contents of slip holder, turntable slip and chuck are added to the equipment (see 9:4~9:6);
---Working pressure is less than or equal to 51:7
The test pressure of MPa drilling hose and hose is changed from 2 times to 1:5 times (see Table 10,
Table 9 of the:2015 edition);
---Modify the hydrostatic test pressure of the hose and damping hose to 1:5 times the working pressure (see 9:7:7:1,:2015 edition
9:6:7:1);
---Delete the manufacturer's name or trademark and standard number in the content of the equipment logo (see the:2015 version of 9:7, 9:8, 9:10, 9:12,
9:13, 9:14);
---The requirements for manual chucks, pneumatic or hydraulic chucks, and power tongs are deleted from the equipment (see 9:9~9:12 and 9:
15);
--- SR2A in Appendix A is changed to only metal parts, and SR2B non-metal parts requirements are added (see Appendix A);
--- Deleted the piston drilling pump term recommended in the original Appendix C (see Appendix C of the:2015 edition);
---Added Appendix C manual tongs load limit design (see Appendix C);
---Added Appendix D product order information (see Appendix D):
This standard is approved by the National Petroleum Drilling Equipment and Tools Standardization Technical Committee (SAC/TC
96) Propose and focus:
Drafting organizations of this standard: Baoji Petroleum Machinery Co:, Ltd:, National Engineering Research Center for Oil and Gas Drilling Equipment, Nanyang Erjishi
Oil Equipment Group Co:, Ltd:, Lanzhou Lanshi Petroleum Equipment Engineering Co:, Ltd:, oil industry well control device quality supervision and inspection
Xin, Sichuan Honghua Petroleum Equipment Co:, Ltd:, Sinopec Siji Petroleum Machinery Co:, Ltd:
The main drafters of this standard: He Genliang, Jia Bingyan, Hao Jianxu, Wang Chunchun, Yu Lijun, Wei Kongcai, Liu Jiong, Yan Xiaoni, Liao Jiang, Tang Hao,
Wang Xiaotong, Xu Jun:
The previous versions of the standard replaced by this standard are as follows:
---GB/T
17744-1999, GB/T
17744-2008, GB/T
17744-2015:
Oil and gas industry drilling and workover equipment
1 Scope
This standard specifies the design, manufacturing and quality control requirements of drilling and workover equipment and main load-bearing replacement parts:
This standard applies to the following equipment:
a) Turntable;
b) Turntable to fill the heart;
c) Slip seat;
d) Manual and power turntable slips;
e) Manual and power chuck;
f) High-pressure drilling fluid and cement hose;
g) Piston drilling pump parts;
h) Winch parts;
i) Manual pliers;
j) Safety slips not used as lifting equipment;
k) Blowout preventer (BOP) transport system;
l) Pressure relief device for high pressure drilling fluid circulation system;
m) The pliers tail rope:
2 Normative references
The following documents are indispensable for the application of this document: For dated reference documents, only the dated version applies to this article
Pieces: For undated references, the latest version (including all amendments) applies to this document:
GB/T
228:1 Tensile test of metallic materials Part 1: Room temperature test method
GB/T
229
Charpy pendulum impact test method for metallic materials
GB/T
8423 (all parts) Oil and gas industry terminology
GB/T
8834 Determination of the physical and mechanical properties of fiber ropes
GB/T
9253:2 Processing, measurement and inspection of casing, tubing and line pipe threads in the oil and gas industry
GB/T
9445 Qualification and certification of non-destructive testing personnel
GB/T
15169 Steel Fusion Welding Welder Skill Evaluation
GB/T
16825:1 Inspection of static uniaxial testing machine Part 1: Inspection and test of force measuring system of tensile and (or) compression testing machine
calibration
GB/T
20174 Oil and gas drilling equipment drilling through equipment
GB/T
22513 Oil and gas industry drilling and production equipment, wellheads and Christmas trees
JB/T
8727 hydraulic hose assembly
SY/T
5170 Steel wire rope for oil and gas industry
SY/T
6666 Recommended practices for the selection and maintenance of steel wire ropes for the oil and gas industry
SY/T
6727 Oil Rig Hydraulic Disc Brake
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 17744-2020_English be delivered?Answer: Upon your order, we will start to translate GB/T 17744-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 9 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 17744-2020_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 17744-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 17744-2020?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 17744-2020 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|