|
US$369.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 17719-2009: Industrial boiler flue gas waste heat and flame heating calculation methods with the use of guidelines Status: Valid GB/T 17719: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 17719-2009 | English | 369 |
Add to Cart
|
3 days [Need to translate]
|
Industrial boiler flue gas waste heat and flame heating calculation methods with the use of guidelines
| Valid |
GB/T 17719-2009
|
| GB/T 17719-1999 | English | 439 |
Add to Cart
|
4 days [Need to translate]
|
Calculating method and utilization guides for waste heat resourcequantity of industrial boilerand flame heating furnacewaste gas
| Obsolete |
GB/T 17719-1999
|
PDF similar to GB/T 17719-2009
Basic data | Standard ID | GB/T 17719-2009 (GB/T17719-2009) | | Description (Translated English) | Industrial boiler flue gas waste heat and flame heating calculation methods with the use of guidelines | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F04 | | Classification of International Standard | 27.060 | | Word Count Estimation | 16,124 | | Date of Issue | 2009-04-08 | | Date of Implementation | 2009-12-01 | | Older Standard (superseded by this standard) | GB/T 17719-1999 | | Quoted Standard | GB/T 1028; GB/T 1921; GB/T 3166; GB/T 3486; GB/T 10180; GB/T 15317; GB/T 15319; GB/T 17954 | | Regulation (derived from) | Announcement of Newly Approved National Standards No. 4, 2009 (No. 144 overall) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the industrial boiler and flue gas flame furnace waste heat and waste heat method of calculating the amount of resources, as well as the recycling of waste heat resources principles and management requirements. This standard applies to GB/T 1921, GB/T 3166 provides boiler and GB/T 3486 specified in the continuous flame furnace waste heat utilization project planning, design, technological innovation and management. |
GB/T 17719-2009: Industrial boiler flue gas waste heat and flame heating calculation methods with the use of guidelines ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Industrial boiler flue gas waste heat and flame heating calculation methods with the use of guidelines
ICS 27.060
F04
National Standards of People's Republic of China
Replacing GB/T 17719-1999
Industrial boiler flue gas furnace and flame
Waste heat calculation method and utilization guides
Posted 2009-04-08
2009-12-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
This standard replaces GB/T 17719-1999 "industrial boiler flue gas heat and flame heating furnace Resource Calculation method and utilization guidelines."
This standard compared with GB/T 17719-1999 main changes are as follows.
--- According to the provisions of GB/T 1028 for terminology, classification revised and improved;
--- According to the requirements GB/T 10180, GB/T 17954 and so on formulas, symbols and informative annex data standards referenced in the
Amendment;
--- Based on waste heat "cascade utilization, with high-quality" principle, the use of waste heat 250 ℃ ~ 400 ℃ for increased encouragement for
Power Generation terms [see 5.1b)];
--- Supplementary principles furnace industrial boilers and waste heat utilization, proposed to provide tail heating surface and the waste heat recovery unit to
Seek range (see 5.4, 5.5 and 5.6);
--- Complements the waste heat recovery and utilization management requirements (see 6.6);
--- Unified calculation formula idiomatic expressions and marked [see formula (2), (3), (5), (6), using the mass fraction and volume fraction
Representation];
--- Standard Appendix A, Appendix B and Appendix C has been revised and complements.
The Standard Appendix A, Appendix B and Appendix C are informative appendices.
This standard by the National Standardization Technical Committee for Energy Management and focal points.
This standard is drafted by. Hangzhou Boiler Group Co., Ltd., China National Institute of Standardization.
Participated in the drafting of this standard. Zhejiang Special Equipment Inspection and Research Institute, Shanghai Institute of industrial boilers.
The main drafters of this standard. Tubo Rui Xue in Thailand, Wang Zhong, solid industry Qin, Cheng Jianhong, a Defang, ECHNOLOGY leaf Mian.
This standard replaces the standards previously issued as follows.
--- GB/T 17719-1999.
Industrial boiler flue gas furnace and flame
Waste heat calculation method and utilization guides
1 Scope
Back calculation method of waste heat and waste heat boilers and industrial resources flame furnace smoke This standard specifies, as well as waste heat resources
Receive and utilize the principles of management requirements.
This standard applies to GB/T 1921, boilers and GB GB/T 3166 provisions/T 3486 stipulated continuous flame heating furnace (with
Planning hereinafter referred to as "furnace") of the waste heat utilization engineering, design, technological innovation and management.
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent
Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research
Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.
GB/T 1028 industrial waste heat terminology, classification, grade and waste heat resource calculation method
GB/T 1921 series of industrial steam boiler
GB/T 3166 series hot water boiler parameters
GB/T 3486 evaluating the rationality of thermal Technical Guidelines
Boiler thermal performance test procedures GB/T 10180 Industrial
GB/T 15317 Industrial Boiler Energy Conservation Monitoring Methods
GB/T 15319 - Furnace Flame Monitoring
GB/T 17954 Industrial Boiler economy
3 Terms and Definitions
The following terms and definitions apply to this standard.
3.1
With respect to the ambient temperature is 20 ℃, relative humidity of 70%, the average volume of flue gas heat capacity at constant pressure is 1.359kJ/(m3 · ℃) conditions
Flue gas carried by waste heat for macro control targets.
NOTE. The standard "m3" refers to standard conditions (1.01325 × 105Pa, 0 ℃) under the measured gas volume units.
3.2
By country, industry and the relevant provisions of this standard, the technical and economic analysis to determine the available waste heat of the flue gas for the practical application of indicators.
4 Calculation
4.1 Calculation of flue gas waste heat
Furnace flue gas waste heat boiler and coal industry 4.1.1 Calculation according to formula (1).
100 q 4
(1)
Where.
Qyr --- In flue gas waste heat, in units of kilojoules per year (kJ/a);
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 17719-2009_English be delivered?Answer: Upon your order, we will start to translate GB/T 17719-2009_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 17719-2009_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 17719-2009_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 17719-2009?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 17719-2009 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|